Tennessee prevailing wage rates: TN20260204
Building construction in Robertson, Smith Counties.
TN20260204, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
- changed IRONWORKER, REINFORCING base $33.73 → $35.32 (+$1.59), fringe $17.73 → $17.07 (−$0.66) New rates effective 05/01/2025 (previously 05/01/2024).
- changed IRONWORKER, STRUCTURAL base $33.73 → $35.32 (+$1.59), fringe $17.73 → $17.07 (−$0.66) New rates effective 05/01/2025 (previously 05/01/2024).
- changed IRONWORKER: ORNAMENTAL base $33.73 → $35.32 (+$1.59), fringe $17.73 → $17.07 (−$0.66) New rates effective 05/01/2025 (previously 05/01/2024).
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.17 | $18.82 | $56.99 | ASBE0086-002 eff. 03/01/2025 |
ELEVATOR MECHANICScope and notesPAID HOLIDAYS: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $52.81 | $38.44 | $91.25 | ELEV0093-001 eff. 01/01/2025 |
| IRONWORKER: ORNAMENTAL | $35.32 | $17.07 | $52.39 | IRON0492-002 eff. 05/01/2025 |
| IRONWORKER, STRUCTURAL | $35.32 | $17.07 | $52.39 | IRON0492-002 eff. 05/01/2025 |
| IRONWORKER, REINFORCING | $35.32 | $17.07 | $52.39 | IRON0492-002 eff. 05/01/2025 |
| PLUMBER | $46.02 | $19.63 | $65.65 | PLUM0572-001 eff. 05/01/2025 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $34.95 | $16.66 | $51.61 | SHEE0004-009 eff. 01/01/2024 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $35.37 | $15.99 | $51.36 | SHEE0177-008 eff. 05/01/2024 |
| TRUCK DRIVER: DUMP TRUCK | $15.28 | $0.00 | $15.28 | SUTN2017-057 eff. 04/16/2021 |
| TILE SETTER | $19.65 | $0.00 | $19.65 | SUTN2017-057 eff. 04/16/2021 |
| TILE FINISHER | $14.00 | $0.00 | $14.00 | SUTN2017-057 eff. 04/16/2021 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $20.87 | $9.81 | $30.68 | SUTN2017-057 eff. 04/16/2021 |
| ROOFER | $17.00 | $0.00 | $17.00 | SUTN2017-057 eff. 04/16/2021 |
| PIPEFITTER | $29.54 | $12.41 | $41.95 | SUTN2017-057 eff. 04/16/2021 |
| PAINTER (BRUSH AND ROLLER) | $14.30 | $0.00 | $14.30 | SUTN2017-057 eff. 04/16/2021 |
| OPERATOR: ROLLER | $14.35 | $0.00 | $14.35 | SUTN2017-057 eff. 04/16/2021 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $14.70 | $0.00 | $14.70 | SUTN2017-057 eff. 04/16/2021 |
| OPERATOR: FORKLIFT | $15.00 | $0.00 | $15.00 | SUTN2017-057 eff. 04/16/2021 |
| OPERATOR: DRILL | $26.50 | $4.09 | $30.59 | SUTN2017-057 eff. 04/16/2021 |
| OPERATOR: CRANE | $26.50 | $2.81 | $29.31 | SUTN2017-057 eff. 04/16/2021 |
| OPERATOR: BULLDOZER | $28.19 | $9.65 | $37.84 | SUTN2017-057 eff. 04/16/2021 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.84 | $0.00 | $16.84 | SUTN2017-057 eff. 04/16/2021 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $24.50 | $0.00 | $24.50 | SUTN2017-057 eff. 04/16/2021 |
| LABORER: PIPELAYER | $14.99 | $2.41 | $17.40 | SUTN2017-057 eff. 04/16/2021 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.97 | $0.00 | $15.97 | SUTN2017-057 eff. 04/16/2021 |
| LABORER: MASON TENDER - BRICK | $13.54 EO 13658 minimum $13.65 may apply | $0.00 | $13.54 | SUTN2017-057 eff. 04/16/2021 |
| LABORER: COMMON OR GENERAL | $12.49 EO 13658 minimum $13.65 may apply | $0.00 | $12.49 | SUTN2017-057 eff. 04/16/2021 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $16.12 | $0.00 | $16.12 | SUTN2017-057 eff. 04/16/2021 |
| LABORER GRADE CHECKER | $13.01 EO 13658 minimum $13.65 may apply | $0.00 | $13.01 | SUTN2017-057 eff. 04/16/2021 |
| LABORER DEMOLITION | $16.74 | $0.00 | $16.74 | SUTN2017-057 eff. 04/16/2021 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY) | $18.00 | $0.79 | $18.79 | SUTN2017-057 eff. 04/16/2021 |
| GLAZIER | $16.00 | $1.11 | $17.11 | SUTN2017-057 eff. 04/16/2021 |
| ELECTRICIAN | $22.53 | $8.00 | $30.53 | SUTN2017-057 eff. 04/16/2021 |
| CEMENT MASON/CONCRETE FINISHER | $22.79 | $0.00 | $22.79 | SUTN2017-057 eff. 04/16/2021 |
| CARPENTER, EXCLUDES DRYWALL HANGING | $19.68 | $0.38 | $20.06 | SUTN2017-057 eff. 04/16/2021 |
| CARPENTER (DRYWALL HANGING ONLY) | $18.32 | $0.00 | $18.32 | SUTN2017-057 eff. 04/16/2021 |
| BRICKLAYER | $20.00 | $0.00 | $20.00 | SUTN2017-057 eff. 04/16/2021 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.