PrevailCrew

Texas prevailing wage rates: TX20260003

Heavy construction in Cameron, Hidalgo, Webb Counties.

TX20260003, modification 1, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 0

No base or fringe rates changed. The modification may have changed notes or other text.

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

TX20260003 wage rates
ClassificationBaseFringeTotalRate ID
WELDER$14.02$0.00$14.02SUTX2011-003
eff. 08/02/2011
TRUCK DRIVER (TANDEM AXLE TRACTOR WITH SEMI TRAILER)$12.12
EO 13658 minimum $13.65 may apply
$0.00$12.12SUTX2011-003
eff. 08/02/2011
TRUCK DRIVER (SINGLE OR TANDEM AXLE DUMP)$14.53$0.00$14.53SUTX2011-003
eff. 08/02/2011
TRUCK DRIVER (SINGLE AXLE)$10.82
EO 13658 minimum $13.65 may apply
$0.00$10.82SUTX2011-003
eff. 08/02/2011
TRUCK DRIVER (LOWBOY-FLOAT)$13.63
EO 13658 minimum $13.65 may apply
$0.00$13.63SUTX2011-003
eff. 08/02/2011
STEEL WORKER (REINFORCING)$14.07$0.00$14.07SUTX2011-003
eff. 08/02/2011
SERVICER$12.34
EO 13658 minimum $13.65 may apply
$0.00$12.34SUTX2011-003
eff. 08/02/2011
POWER EQUIPMENT OPERATOR: SCRAPER$11.07
EO 13658 minimum $13.65 may apply
$0.00$11.07SUTX2011-003
eff. 08/02/2011
POWER EQUIPMENT OPERATOR: MOTOR GRADER, FINE GRADE$16.52$0.00$16.52SUTX2011-003
eff. 08/02/2011
POWER EQUIPMENT OPERATOR: MECHANIC$15.47$0.00$15.47SUTX2011-003
eff. 08/02/2011
POWER EQUIPMENT OPERATOR: FRONT END LOADER, 3 CY OR LESS$13.49
EO 13658 minimum $13.65 may apply
$0.00$13.49SUTX2011-003
eff. 08/02/2011
POWER EQUIPMENT OPERATOR: FOUNDATION DRILL, TRUCK MOUNTED$16.86$0.00$16.86SUTX2011-003
eff. 08/02/2011
POWER EQUIPMENT OPERATOR: CRAWLER TRACTOR$16.63$0.00$16.63SUTX2011-003
eff. 08/02/2011
POWER EQUIPMENT OPERATOR: BROOM OR SWEEPER$10.33
EO 13658 minimum $13.65 may apply
$0.00$10.33SUTX2011-003
eff. 08/02/2011
POWER EQUIPMENT OPERATOR: ASPHALT DISTRIBUTOR$13.48
EO 13658 minimum $13.65 may apply
$0.00$13.48SUTX2011-003
eff. 08/02/2011
POWER EQUIPMENT OPERATOR: (MOTOR GRADER OPERATOR, ROUGH)$14.62$0.00$14.62SUTX2011-003
eff. 08/02/2011
POWER EQUIPMENT OPERATOR: (MILLING MACHINE)$14.64$0.00$14.64SUTX2011-003
eff. 08/02/2011
POWER EQUIPMENT OPERATOR: (LOADER/BACKHOE)$12.77
EO 13658 minimum $13.65 may apply
$0.00$12.77SUTX2011-003
eff. 08/02/2011
POWER EQUIPMENT OPERATOR: (FRONT END LOADER OPERATOR, OVER 3 CY)$13.69$0.00$13.69SUTX2011-003
eff. 08/02/2011
POWER EQUIPMENT OPERATOR: (EXCAVATOR, OVER 50,000 LBS)$15.23$0.00$15.23SUTX2011-003
eff. 08/02/2011
POWER EQUIPMENT OPERATOR: (EXCAVATOR, 50,000 LBS OR LESS)$12.56
EO 13658 minimum $13.65 may apply
$0.00$12.56SUTX2011-003
eff. 08/02/2011
POWER EQUIPMENT OPERATOR: (CRANE, LATTICE BOOM 80 TONS OR LESS)$14.39$0.00$14.39SUTX2011-003
eff. 08/02/2011
POWER EQUIPMENT OPERATOR: (ASPHALT PAVING MACHINE)$12.25
EO 13658 minimum $13.65 may apply
$0.00$12.25SUTX2011-003
eff. 08/02/2011
LABORER: PIPELAYER$11.87
EO 13658 minimum $13.65 may apply
$0.00$11.87SUTX2011-003
eff. 08/02/2011
LABORER: ASPHALT RAKER$10.61
EO 13658 minimum $13.65 may apply
$0.00$10.61SUTX2011-003
eff. 08/02/2011
LABORER (WORK ZONE BARRICADE SERVICER)$12.88
EO 13658 minimum $13.65 may apply
$0.00$12.88SUTX2011-003
eff. 08/02/2011
LABORER (LABORER, UTILITY)$11.53
EO 13658 minimum $13.65 may apply
$0.00$11.53SUTX2011-003
eff. 08/02/2011
LABORER (LABORER, COMMON)$9.86
EO 13658 minimum $13.65 may apply
$0.00$9.86SUTX2011-003
eff. 08/02/2011
LABORER (FLAGGER)$9.10
EO 13658 minimum $13.65 may apply
$0.00$9.10SUTX2011-003
eff. 08/02/2011
FORM SETTER (PAVING & CURB)$12.16
EO 13658 minimum $13.65 may apply
$0.00$12.16SUTX2011-003
eff. 08/02/2011
FORM BUILDER/FORM SETTER (STRUCTURES)$12.30
EO 13658 minimum $13.65 may apply
$0.00$12.30SUTX2011-003
eff. 08/02/2011
CEMENT MASON/CONCRETE FINISHER (PAVING & STRUCTURES)$12.46
EO 13658 minimum $13.65 may apply
$0.00$12.46SUTX2011-003
eff. 08/02/2011

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.