Texas prevailing wage rates: TX20260019
Heavy construction in Grayson County.
TX20260019, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| WELDER | $9.85 EO 13658 minimum $13.65 may apply | $0.00 | $9.85 | SUTX1992-003 eff. 04/10/1992 |
| TRUCK DRIVERS: SINGLE AXLE, LIGHT | $7.25 EO 13658 minimum $13.65 may apply | $0.00 | $7.25 | SUTX1992-003 eff. 04/10/1992 |
| TRUCK DRIVERS: SINGLE AXLE, HEAVY | $7.40 EO 13658 minimum $13.65 may apply | $0.00 | $7.40 | SUTX1992-003 eff. 04/10/1992 |
| TRUCK DRIVERS: (WINCH) | $7.25 EO 13658 minimum $13.65 may apply | $0.00 | $7.25 | SUTX1992-003 eff. 04/10/1992 |
| TRUCK DRIVERS: (TRANSIT-MIX) | $7.25 EO 13658 minimum $13.65 may apply | $0.00 | $7.25 | SUTX1992-003 eff. 04/10/1992 |
| TRUCK DRIVERS: (TANDEM AXLE OR SEMI-TRAILER) | $7.25 EO 13658 minimum $13.65 may apply | $0.00 | $7.25 | SUTX1992-003 eff. 04/10/1992 |
| TRUCK DRIVERS: (LOWBOY-FLOAT) | $7.90 EO 13658 minimum $13.65 may apply | $0.00 | $7.90 | SUTX1992-003 eff. 04/10/1992 |
| SPREADER BOX OPERATOR | $7.30 EO 13658 minimum $13.65 may apply | $0.00 | $7.30 | SUTX1992-003 eff. 04/10/1992 |
| SIGN ERECTOR | $8.30 EO 13658 minimum $13.65 may apply | $0.00 | $8.30 | SUTX1992-003 eff. 04/10/1992 |
| SERVICER | $7.55 EO 13658 minimum $13.65 may apply | $0.00 | $7.55 | SUTX1992-003 eff. 04/10/1992 |
| REINFORCING STEEL SETTER (STRUCT.) | $9.60 EO 13658 minimum $13.65 may apply | $0.00 | $9.60 | SUTX1992-003 eff. 04/10/1992 |
| REINFORCING STEEL SETTER (PAVING) | $7.25 EO 13658 minimum $13.65 may apply | $0.00 | $7.25 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (TRENCHING MACHINE, LIGHT) | $7.80 EO 13658 minimum $13.65 may apply | $0.00 | $7.80 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (TRENCHING MACHINE, HEAVY) | $8.00 EO 13658 minimum $13.65 may apply | $0.00 | $8.00 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (TRAVELING MIXER) | $7.25 EO 13658 minimum $13.65 may apply | $0.00 | $7.25 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (TRACTOR (PNEUMATIC) OVER 80 HP) | $7.40 EO 13658 minimum $13.65 may apply | $0.00 | $7.40 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (TRACTOR (PNEUMATIC) 80 HP & LESS) | $7.35 EO 13658 minimum $13.65 may apply | $0.00 | $7.35 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (TRACTOR (CRAWLER) OVER 150 HP) | $8.30 EO 13658 minimum $13.65 may apply | $0.00 | $8.30 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (TRACTOR (CRAWLER) 150 HP & LESS) | $8.00 EO 13658 minimum $13.65 may apply | $0.00 | $8.00 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (SIDE BOOM) | $7.25 EO 13658 minimum $13.65 may apply | $0.00 | $7.25 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (SELF-PROPELLED HAMMER) | $7.25 EO 13658 minimum $13.65 may apply | $0.00 | $7.25 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (SCRAPER (OVER 17 CU YD)) | $8.30 EO 13658 minimum $13.65 may apply | $0.00 | $8.30 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (SCRAPER (17 CU YD & LESS)) | $7.90 EO 13658 minimum $13.65 may apply | $0.00 | $7.90 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (ROLLER, STEEL WHEEL OTHER-FLAT WHEEL OR TAMPING)) | $8.05 EO 13658 minimum $13.65 may apply | $0.00 | $8.05 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (ROLLER, STEEL WHEEL (PLANT-MIX PAVEMENT)) | $8.10 EO 13658 minimum $13.65 may apply | $0.00 | $8.10 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (ROLLER, PNEUMATIC (SELF-PROPELLED)) | $7.25 EO 13658 minimum $13.65 may apply | $0.00 | $7.25 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (MOTOR GRADER OPERATOR) | $9.00 EO 13658 minimum $13.65 may apply | $0.00 | $9.00 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (MOTOR GRADER OPERATOR (FINE GRADE)) | $9.75 EO 13658 minimum $13.65 may apply | $0.00 | $9.75 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (MIXER (16 CF & LESS)) | $7.25 EO 13658 minimum $13.65 may apply | $0.00 | $7.25 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (FRONT END LOADER (2.5 CU YD OR LESS)) | $8.30 EO 13658 minimum $13.65 may apply | $0.00 | $8.30 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (FRONT END LOAD (OVER 2.5 CU YD)) | $9.05 EO 13658 minimum $13.65 may apply | $0.00 | $9.05 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (FOUNDATION DRILL OPERATOR (TRUCK MOUNTED)) | $10.05 EO 13658 minimum $13.65 may apply | $0.00 | $10.05 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (FORM LOADER) | $7.25 EO 13658 minimum $13.65 may apply | $0.00 | $7.25 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (CRUSHER OR SCREENING PLANT) | $7.25 EO 13658 minimum $13.65 may apply | $0.00 | $7.25 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (CRANE, CLAMSHELL, BACKHOE, DERRICK, DRAGLINE, SHOVEL (LESS THAN 1.5 CU. YD.)) | $9.10 EO 13658 minimum $13.65 may apply | $0.00 | $9.10 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (CRANE, CLAMSHELL, BACKHOE, DERRICK, DRAGLINE, SHOVEL (1.5 CU YD AND OVER)) | $9.80 EO 13658 minimum $13.65 may apply | $0.00 | $9.80 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (CONCRETE PAVING SPREADER) | $8.60 EO 13658 minimum $13.65 may apply | $0.00 | $8.60 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (CONCRETE PAVING SAW) | $8.30 EO 13658 minimum $13.65 may apply | $0.00 | $8.30 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (CONCRETE PAVING JOINT MACHINE) | $8.00 EO 13658 minimum $13.65 may apply | $0.00 | $8.00 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (CONCRETE PAVING FORM GRADER) | $9.75 EO 13658 minimum $13.65 may apply | $0.00 | $9.75 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (CONCRETE PAVING FINISHING MACHINE) | $9.05 EO 13658 minimum $13.65 may apply | $0.00 | $9.05 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (CONCRETE PAVING CURING MACHINE) | $8.40 EO 13658 minimum $13.65 may apply | $0.00 | $8.40 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (BULLDOZER OVER 150 HP) | $9.05 EO 13658 minimum $13.65 may apply | $0.00 | $9.05 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (BULLDOZER 150 HP OR LESS) | $8.05 EO 13658 minimum $13.65 may apply | $0.00 | $8.05 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (BROOM OR SWEEPER OPERATOR) | $8.75 EO 13658 minimum $13.65 may apply | $0.00 | $8.75 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (ASPHALT PAVING MACHINE) | $8.95 EO 13658 minimum $13.65 may apply | $0.00 | $8.95 | SUTX1992-003 eff. 04/10/1992 |
| POWER EQUIPMENT OPERATORS: (ASPHALT DISTRIBUTOR) | $7.85 EO 13658 minimum $13.65 may apply | $0.00 | $7.85 | SUTX1992-003 eff. 04/10/1992 |
| PNEUMATIC MORTAR OPERATOR | $7.25 EO 13658 minimum $13.65 may apply | $0.00 | $7.25 | SUTX1992-003 eff. 04/10/1992 |
| PIPELAYER | $7.45 EO 13658 minimum $13.65 may apply | $0.00 | $7.45 | SUTX1992-003 eff. 04/10/1992 |
| PAINTER (STRUCTURES) | $10.00 EO 13658 minimum $13.65 may apply | $0.00 | $10.00 | SUTX1992-003 eff. 04/10/1992 |
| OILER | $8.50 EO 13658 minimum $13.65 may apply | $0.00 | $8.50 | SUTX1992-003 eff. 04/10/1992 |
| MECHANIC (UNDEFINED) | $10.00 EO 13658 minimum $13.65 may apply | $0.00 | $10.00 | SUTX1992-003 eff. 04/10/1992 |
| LABORERS: (UTILITY) | $7.25 EO 13658 minimum $13.65 may apply | $0.00 | $7.25 | SUTX1992-003 eff. 04/10/1992 |
| LABORERS: (COMMON) | $7.25 EO 13658 minimum $13.65 may apply | $0.00 | $7.25 | SUTX1992-003 eff. 04/10/1992 |
| FORM SETTER-STRUCTURES | $8.10 EO 13658 minimum $13.65 may apply | $0.00 | $8.10 | SUTX1992-003 eff. 04/10/1992 |
| FORM SETTER - PAVING & CURB | $8.55 EO 13658 minimum $13.65 may apply | $0.00 | $8.55 | SUTX1992-003 eff. 04/10/1992 |
| FORM LINER - PAVING & CURB | $8.50 EO 13658 minimum $13.65 may apply | $0.00 | $8.50 | SUTX1992-003 eff. 04/10/1992 |
| FORM BUILDER (STRUCTURES) | $8.20 EO 13658 minimum $13.65 may apply | $0.00 | $8.20 | SUTX1992-003 eff. 04/10/1992 |
| FLAGGER | $7.25 EO 13658 minimum $13.65 may apply | $0.00 | $7.25 | SUTX1992-003 eff. 04/10/1992 |
| ELECTRICIAN | $11.95 EO 13658 minimum $13.65 may apply | $0.00 | $11.95 | SUTX1992-003 eff. 04/10/1992 |
| CONCRETE RUBBER | $7.25 EO 13658 minimum $13.65 may apply | $0.00 | $7.25 | SUTX1992-003 eff. 04/10/1992 |
| CONCRETE FINISHER (STRUCTURES) | $8.90 EO 13658 minimum $13.65 may apply | $0.00 | $8.90 | SUTX1992-003 eff. 04/10/1992 |
| CONCRETE FINISHER (PAVING) | $9.20 EO 13658 minimum $13.65 may apply | $0.00 | $9.20 | SUTX1992-003 eff. 04/10/1992 |
| CARPENTER | $9.10 EO 13658 minimum $13.65 may apply | $0.00 | $9.10 | SUTX1992-003 eff. 04/10/1992 |
| BATTERBOARD SETTER | $8.45 EO 13658 minimum $13.65 may apply | $0.00 | $8.45 | SUTX1992-003 eff. 04/10/1992 |
| BATCHING PLANT SCALE OPERATOR | $8.50 EO 13658 minimum $13.65 may apply | $0.00 | $8.50 | SUTX1992-003 eff. 04/10/1992 |
| ASPHALT SHOVELER | $8.25 EO 13658 minimum $13.65 may apply | $0.00 | $8.25 | SUTX1992-003 eff. 04/10/1992 |
| ASPHALT RAKER | $9.00 EO 13658 minimum $13.65 may apply | $0.00 | $9.00 | SUTX1992-003 eff. 04/10/1992 |
| ASPHALT HEATER OPERATOR | $8.00 EO 13658 minimum $13.65 may apply | $0.00 | $8.00 | SUTX1992-003 eff. 04/10/1992 |
| AIR TOOL OPERATOR | $7.50 EO 13658 minimum $13.65 may apply | $0.00 | $7.50 | SUTX1992-003 eff. 04/10/1992 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.