Texas prevailing wage rates: TX20260034
Heavy construction in Brazoria, Fort Bend, Galveston, Harris, Matagorda, Montgomery, Waller, Wharton Counties.
TX20260034, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| WORK ZONE BARRICADE | $15.63 | $0.00 | $15.63 | SUTX1998-009 eff. 03/26/1998 |
| WELDER | $21.89 | $0.00 | $21.89 | SUTX1998-009 eff. 03/26/1998 |
| WAGON DRILL, BORING MACHINE | $21.30 | $0.00 | $21.30 | SUTX1998-009 eff. 03/26/1998 |
| TRUCK DRIVER TANDEM AXLE SEMI-TRAILER | $16.79 | $0.00 | $16.79 | SUTX1998-009 eff. 03/26/1998 |
| TRUCK DRIVER SINGLE AXLE, LIGHT | $17.10 | $0.00 | $17.10 | SUTX1998-009 eff. 03/26/1998 |
| TRUCK DRIVER SINGLE AXLE HEAVY | $18.38 | $0.00 | $18.38 | SUTX1998-009 eff. 03/26/1998 |
| TRUCK DRIVER LOWBOY FLOAT | $23.69 | $0.00 | $23.69 | SUTX1998-009 eff. 03/26/1998 |
| TRENCHING MACHINE, LIGHT | $22.03 | $0.00 | $22.03 | SUTX1998-009 eff. 03/26/1998 |
| TRENCHING MACHINE, HEAVY | $28.46 | $0.00 | $28.46 | SUTX1998-009 eff. 03/26/1998 |
| TRAVELING MIXER | $19.62 | $0.00 | $19.62 | SUTX1998-009 eff. 03/26/1998 |
| TRACTOR-PNEUMATIC | $18.87 | $0.00 | $18.87 | SUTX1998-009 eff. 03/26/1998 |
| TRACTOR-CRAWLER TYPE | $21.24 | $0.00 | $21.24 | SUTX1998-009 eff. 03/26/1998 |
| STEELWORKER STRUCTURAL | $21.72 | $0.00 | $21.72 | SUTX1998-009 eff. 03/26/1998 |
| SPREADER BOX OPERATOR | $19.05 | $0.00 | $19.05 | SUTX1998-009 eff. 03/26/1998 |
| SLIPFORM MACHINE OPERATOR | $19.31 | $0.00 | $19.31 | SUTX1998-009 eff. 03/26/1998 |
| SIGN INSTALLER | $15.63 | $0.00 | $15.63 | SUTX1998-009 eff. 03/26/1998 |
| SIGN ERECTOR | $21.11 | $0.00 | $21.11 | SUTX1998-009 eff. 03/26/1998 |
| SERVICER | $19.96 | $0.00 | $19.96 | SUTX1998-009 eff. 03/26/1998 |
| SCRAPER | $18.24 | $0.00 | $18.24 | SUTX1998-009 eff. 03/26/1998 |
| ROLLER, STEEL WHEEL PLANT MIX PAVEMENTS | $19.41 | $0.00 | $19.41 | SUTX1998-009 eff. 03/26/1998 |
| ROLLER, STEEL WHEEL OTHER FLATWHEEL OR TAMPING | $15.97 | $0.00 | $15.97 | SUTX1998-009 eff. 03/26/1998 |
| ROLLER, PNEUMATIC, SELF PROPELLED | $16.70 | $0.00 | $16.70 | SUTX1998-009 eff. 03/26/1998 |
| REINFORCING STEEL SETTER STRUCTURES | $26.17 | $0.00 | $26.17 | SUTX1998-009 eff. 03/26/1998 |
| REINFORCING STEEL SETTER PAVING | $26.23 | $0.00 | $26.23 | SUTX1998-009 eff. 03/26/1998 |
| PIPE LAYER | $17.82 | $0.00 | $17.82 | SUTX1998-009 eff. 03/26/1998 |
| PILEDRIVER | $23.00 | $0.00 | $23.00 | SUTX1998-009 eff. 03/26/1998 |
| PAVEMENT MARKING MACHINE | $15.63 | $0.00 | $15.63 | SUTX1998-009 eff. 03/26/1998 |
| PAINTER-STRUCTURES | $29.38 | $0.00 | $29.38 | SUTX1998-009 eff. 03/26/1998 |
| OILER | $20.06 | $0.00 | $20.06 | SUTX1998-009 eff. 03/26/1998 |
| MOTOR GRADER OTHER | $22.39 | $0.00 | $22.39 | SUTX1998-009 eff. 03/26/1998 |
| MOTOR GRADER FINE GRADE | $23.31 | $0.00 | $23.31 | SUTX1998-009 eff. 03/26/1998 |
| MIXER | $16.66 | $0.00 | $16.66 | SUTX1998-009 eff. 03/26/1998 |
| MILLING MACHINE OPERATOR | $21.89 | $0.00 | $21.89 | SUTX1998-009 eff. 03/26/1998 |
| MECHANIC (UNDEFINED) | $23.88 | $0.00 | $23.88 | SUTX1998-009 eff. 03/26/1998 |
| MANHOLE BUILDER: BRICK | $17.82 | $0.00 | $17.82 | SUTX1998-009 eff. 03/26/1998 |
| LINEPERSON | $15.74 | $0.00 | $15.74 | SUTX1998-009 eff. 03/26/1998 |
| LABORER-UTILITY | $17.90 | $0.00 | $17.90 | SUTX1998-009 eff. 03/26/1998 |
| LABOR COMMON | $15.63 | $0.00 | $15.63 | SUTX1998-009 eff. 03/26/1998 |
| FRONT END LOADER | $19.50 | $0.00 | $19.50 | SUTX1998-009 eff. 03/26/1998 |
| FOUNDATION DRILL OPERATOR, TRUCK MOUNTED | $26.71 | $0.00 | $26.71 | SUTX1998-009 eff. 03/26/1998 |
| FOUNDATION DRILL OPERATOR, CRAWLER MOUNTED | $26.42 | $0.00 | $26.42 | SUTX1998-009 eff. 03/26/1998 |
| FORM SETTER: PAVING/CURB | $18.59 | $0.00 | $18.59 | SUTX1998-009 eff. 03/26/1998 |
| FORM SETTER-STRUCTURES | $18.99 | $0.00 | $18.99 | SUTX1998-009 eff. 03/26/1998 |
| FORM LINER - PAVING & CURB | $18.95 | $0.00 | $18.95 | SUTX1998-009 eff. 03/26/1998 |
| FORM BUILDER (STRUCTURES) | $20.90 | $0.00 | $20.90 | SUTX1998-009 eff. 03/26/1998 |
| FLAGGER | $15.21 | $0.00 | $15.21 | SUTX1998-009 eff. 03/26/1998 |
| ELECTRICIAN | $33.89 | $0.00 | $33.89 | SUTX1998-009 eff. 03/26/1998 |
| CRUSHER OR SCREENING PLANT OPERATOR | $23.08 | $0.00 | $23.08 | SUTX1998-009 eff. 03/26/1998 |
| CRANE, CLAMSHELL, BACKHOE, DERRICK, DRAGLINE, SHOVEL | $23.82 | $0.00 | $23.82 | SUTX1998-009 eff. 03/26/1998 |
| CONCRETE RUBBER | $18.89 | $0.00 | $18.89 | SUTX1998-009 eff. 03/26/1998 |
| CONCRETE PAVING SPREADER | $19.56 | $0.00 | $19.56 | SUTX1998-009 eff. 03/26/1998 |
| CONCRETE PAVING SAW | $21.01 | $0.00 | $21.01 | SUTX1998-009 eff. 03/26/1998 |
| CONCRETE PAVING FLOAT | $19.52 | $0.00 | $19.52 | SUTX1998-009 eff. 03/26/1998 |
| CONCRETE JOINT SEALER | $22.03 | $0.00 | $22.03 | SUTX1998-009 eff. 03/26/1998 |
| CONCRETE FINISHING MACHINE | $24.74 | $0.00 | $24.74 | SUTX1998-009 eff. 03/26/1998 |
| CONCRETE FINISHER-STRUCTURES | $20.69 | $0.00 | $20.69 | SUTX1998-009 eff. 03/26/1998 |
| CONCRETE FINISHER-PAVING | $20.71 | $0.00 | $20.71 | SUTX1998-009 eff. 03/26/1998 |
| CONCRETE CURBING MACH | $18.47 | $0.00 | $18.47 | SUTX1998-009 eff. 03/26/1998 |
| CARPENTER | $21.72 | $0.00 | $21.72 | SUTX1998-009 eff. 03/26/1998 |
| BULLDOZER | $20.80 | $0.00 | $20.80 | SUTX1998-009 eff. 03/26/1998 |
| BROOM OR SWEEPER OPERATOR | $16.81 | $0.00 | $16.81 | SUTX1998-009 eff. 03/26/1998 |
| BATCHING PLANT WEIGHER | $23.31 | $0.00 | $23.31 | SUTX1998-009 eff. 03/26/1998 |
| ASPHALT SHOVELER | $15.63 | $0.00 | $15.63 | SUTX1998-009 eff. 03/26/1998 |
| ASPHALT RAKER | $17.38 | $0.00 | $17.38 | SUTX1998-009 eff. 03/26/1998 |
| ASPHALT PAVING MACHINE | $21.09 | $0.00 | $21.09 | SUTX1998-009 eff. 03/26/1998 |
| ASPHALT DISTRIBUTOR | $19.87 | $0.00 | $19.87 | SUTX1998-009 eff. 03/26/1998 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.