Texas prevailing wage rates: TX20260199
Building construction in Edwards, Presidio, Reagan Counties.
TX20260199, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (REAGAN COUNTY) | $33.23 | $7.52 | $40.75 | ASBE0021-008 eff. 06/01/2025 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (PRESIDIO COUNTY) | $31.26 | $11.83 | $43.09 | ASBE0076-004 eff. 01/01/2025 |
| ASBESTOS WORKER/HEAT & FROST INSULATOR (EDWARDS COUNTY) | $30.50 | $8.89 | $39.39 | ASBE0087-012 eff. 06/02/2025 |
| BOILERMAKER (EDWARDS COUNTY) | $33.17 | $24.92 | $58.09 | BOIL0074-010 eff. 01/01/2025 |
| BOILERMAKER (PRESIDIO AND REAGAN COUNTIES) | $33.70 | $24.41 | $58.11 | BOIL0592-008 eff. 01/01/2025 |
| IRONWORKER, REINFORCING AND STRUCTURAL (EDWARDS COUNTY) | $27.95 | $8.03 | $35.98 | IRON0066-011 eff. 06/01/2025 |
| IRONWORKER, REINFORCING AND STRUCTURAL (PRESIDIO AND REAGAN COUNTIES) | $29.64 | $8.43 | $38.07 | IRON0263-026 eff. 06/01/2025 |
| LABORERS: MASON TENDER - CEMENT/CONCRETE (EDWARDS COUNTY) | $25.27 | $9.57 | $34.84 | LABO0154-006 eff. 05/01/2024 |
| LABORERS: MASON TENDER - CEMENT/CONCRETE (PRESIDIO AND REGAN COUNTY) | $25.27 | $9.57 | $34.84 | LABO0154-014 eff. 05/01/2024 |
| PLUMBER (EDWARDS COUNTY) | $38.97 | $11.48 | $50.45 | PLUM0142-007 eff. 07/02/2025 |
| PLUMBER | $28.64 | $10.65 | $39.29 | PLUM0404-001 eff. 09/01/2022 |
| PLUMBER (PRESIDIO COUNTY) | $40.74 | $15.35 | $56.09 | PLUM0412-010 eff. 01/02/2024 |
| TRUCK DRIVER | $11.24 EO 13658 minimum $13.65 may apply | $0.35 | $11.59 | SUTX2009-086 eff. 04/20/2009 |
| TILE SETTER | $15.00 | $0.00 | $15.00 | SUTX2009-086 eff. 04/20/2009 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $18.00 | $0.00 | $18.00 | SUTX2009-086 eff. 04/20/2009 |
| ROOFER | $15.10 | $1.29 | $16.39 | SUTX2009-086 eff. 04/20/2009 |
| PLASTERER | $12.00 EO 13658 minimum $13.65 may apply | $0.00 | $12.00 | SUTX2009-086 eff. 04/20/2009 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $15.80 | $0.00 | $15.80 | SUTX2009-086 eff. 04/20/2009 |
| OPERATOR: LOADER (FRONT END) | $10.54 EO 13658 minimum $13.65 may apply | $0.00 | $10.54 | SUTX2009-086 eff. 04/20/2009 |
| OPERATOR: FORKLIFT | $14.58 | $0.00 | $14.58 | SUTX2009-086 eff. 04/20/2009 |
| OPERATOR: CRANE | $21.33 | $0.00 | $21.33 | SUTX2009-086 eff. 04/20/2009 |
| OPERATOR: BULLDOZER | $12.80 EO 13658 minimum $13.65 may apply | $0.43 | $13.23 | SUTX2009-086 eff. 04/20/2009 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $13.75 | $0.00 | $13.75 | SUTX2009-086 eff. 04/20/2009 |
| LATHER | $12.00 EO 13658 minimum $13.65 may apply | $0.00 | $12.00 | SUTX2009-086 eff. 04/20/2009 |
| LABORER: MORTAR MIXER | $9.50 EO 13658 minimum $13.65 may apply | $0.00 | $9.50 | SUTX2009-086 eff. 04/20/2009 |
| LABORER: MASON TENDER - BRICK | $12.02 EO 13658 minimum $13.65 may apply | $0.00 | $12.02 | SUTX2009-086 eff. 04/20/2009 |
| LABORER: LANDSCAPE & IRRIGATION | $8.50 EO 13658 minimum $13.65 may apply | $0.22 | $8.72 | SUTX2009-086 eff. 04/20/2009 |
| LABORER: COMMON OR GENERAL | $8.72 EO 13658 minimum $13.65 may apply | $0.00 | $8.72 | SUTX2009-086 eff. 04/20/2009 |
| ELECTRICIAN | $15.85 | $0.00 | $15.85 | SUTX2009-086 eff. 04/20/2009 |
| CEMENT MASON/CONCRETE FINISHER | $13.27 EO 13658 minimum $13.65 may apply | $0.00 | $13.27 | SUTX2009-086 eff. 04/20/2009 |
| CARPENTER, INCLUDES DRYWALL HANGING (EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $13.46 EO 13658 minimum $13.65 may apply | $0.00 | $13.46 | SUTX2009-086 eff. 04/20/2009 |
| BRICKLAYER | $17.76 | $0.00 | $17.76 | SUTX2009-086 eff. 04/20/2009 |
| ACOUSTICAL CEILING MECHANIC | $14.50 | $0.00 | $14.50 | SUTX2009-086 eff. 04/20/2009 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.