Texas prevailing wage rates: TX20260238
Building construction in Chambers County.
TX20260238, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $30.20 | $12.38 | $42.58 | ASBE0022-009 eff. 07/01/2024 |
| BOILERMAKER | $33.17 | $24.92 | $58.09 | BOIL0074-003 eff. 01/01/2025 |
| CARPENTER (EXCLUDES ACOUSTICAL CEILING INSTALLATION,DRYWALL HANGING, FORM WORK AND METAL STUD INSTALLATION) | $33.27 | $9.73 | $43.00 | CARP0551-008 eff. 04/01/2025 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS) | $38.50 | $10.71 | $49.21 | ELEC0716-005 eff. 09/01/2025 |
ELEVATOR MECHANIC:Scope and notesFOOTNOTES: A. 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8% OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING DAY; CHRISTMAS DAY; AND VETERANS DAY | $53.59 | $38.44 | $92.03 | ELEV0031-003 eff. 01/01/2025 |
| POWER EQUIPMENT OPERATOR (CRANES) | $39.47 | $10.39 | $49.86 | ENGI0450-002 eff. 04/01/2024 |
| IRONWORKER: ORNAMENTAL | $28.26 | $8.13 | $36.39 | IRON0084-011 eff. 06/01/2024 |
| IRONWORKER, STRUCTURAL | $34.35 | $14.44 | $48.79 | IRON0135-002 eff. 09/01/2022 |
| PLASTERER | $31.34 | $10.30 | $41.64 | PLAS0783-001 eff. 04/01/2023 |
| PLUMBER (WEST OF TRINITY RIVER) | $39.98 | $11.61 | $51.59 | PLUM0068-003 eff. 10/01/2024 |
| PLUMBER (EAST OF TRINITY RIVER) | $39.98 | $11.61 | $51.59 | PLUM0068-003 eff. 10/01/2024 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $42.09 | $12.96 | $55.05 | PLUM0211-010 eff. 10/01/2025 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $29.70 | $13.85 | $43.55 | SHEE0054-012 eff. 04/01/2020 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT AND UNIT INSTALLATION) | $29.70 | $13.85 | $43.55 | SHEE0054-012 eff. 04/01/2020 |
| WATERPROOFER | $14.39 | $0.00 | $14.39 | SUTX2014-013 eff. 07/21/2014 |
| TRUCK DRIVER: WATER TRUCK | $12.00 EO 13658 minimum $13.65 may apply | $4.11 | $16.11 | SUTX2014-013 eff. 07/21/2014 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $12.50 EO 13658 minimum $13.65 may apply | $0.00 | $12.50 | SUTX2014-013 eff. 07/21/2014 |
| TRUCK DRIVER: FLATBED TRUCK | $19.65 | $8.57 | $28.22 | SUTX2014-013 eff. 07/21/2014 |
| TRUCK DRIVER: DUMP TRUCK | $12.39 EO 13658 minimum $13.65 may apply | $1.18 | $13.57 | SUTX2014-013 eff. 07/21/2014 |
| TRUCK DRIVER: 1/SINGLE AXLE TRUCK | $14.95 | $5.23 | $20.18 | SUTX2014-013 eff. 07/21/2014 |
| TILE SETTER | $16.17 | $0.00 | $16.17 | SUTX2014-013 eff. 07/21/2014 |
| TILE FINISHER | $12.00 EO 13658 minimum $13.65 may apply | $0.00 | $12.00 | SUTX2014-013 eff. 07/21/2014 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $22.17 | $9.70 | $31.87 | SUTX2014-013 eff. 07/21/2014 |
| SHEET METAL WORKER (HVAC UNIT INSTALLATION ONLY) | $19.67 | $2.24 | $21.91 | SUTX2014-013 eff. 07/21/2014 |
| ROOFER | $15.40 | $0.00 | $15.40 | SUTX2014-013 eff. 07/21/2014 |
| PAINTER (BRUSH, ROLLER AND SPRAY), EXCLUDES DRYWALL FINISHING/TAPING | $16.77 | $4.51 | $21.28 | SUTX2014-013 eff. 07/21/2014 |
| OPERATOR: ROLLER | $16.00 | $0.00 | $16.00 | SUTX2014-013 eff. 07/21/2014 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.03 | $0.00 | $16.03 | SUTX2014-013 eff. 07/21/2014 |
| OPERATOR: MECHANIC | $17.52 | $3.33 | $20.85 | SUTX2014-013 eff. 07/21/2014 |
| OPERATOR: LOADER | $13.55 EO 13658 minimum $13.65 may apply | $0.94 | $14.49 | SUTX2014-013 eff. 07/21/2014 |
| OPERATOR: GRADER/BLADE | $13.37 EO 13658 minimum $13.65 may apply | $0.00 | $13.37 | SUTX2014-013 eff. 07/21/2014 |
| OPERATOR: FORKLIFT | $15.64 | $0.00 | $15.64 | SUTX2014-013 eff. 07/21/2014 |
| OPERATOR: DRILL | $16.22 | $0.34 | $16.56 | SUTX2014-013 eff. 07/21/2014 |
| OPERATOR: BULLDOZER | $20.77 | $0.00 | $20.77 | SUTX2014-013 eff. 07/21/2014 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $13.93 | $0.00 | $13.93 | SUTX2014-013 eff. 07/21/2014 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.10 | $0.00 | $14.10 | SUTX2014-013 eff. 07/21/2014 |
| LATHER | $19.73 | $0.00 | $19.73 | SUTX2014-013 eff. 07/21/2014 |
| LABORER: ROOF TEAROFF | $11.28 EO 13658 minimum $13.65 may apply | $0.00 | $11.28 | SUTX2014-013 eff. 07/21/2014 |
| LABORER: PIPELAYER | $12.94 EO 13658 minimum $13.65 may apply | $0.00 | $12.94 | SUTX2014-013 eff. 07/21/2014 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.50 EO 13658 minimum $13.65 may apply | $0.00 | $10.50 | SUTX2014-013 eff. 07/21/2014 |
| LABORER: MASON TENDER - BRICK | $13.37 EO 13658 minimum $13.65 may apply | $0.00 | $13.37 | SUTX2014-013 eff. 07/21/2014 |
| LABORER: LANDSCAPE & IRRIGATION | $9.49 EO 13658 minimum $13.65 may apply | $0.00 | $9.49 | SUTX2014-013 eff. 07/21/2014 |
| LABORER: COMMON OR GENERAL | $11.56 EO 13658 minimum $13.65 may apply | $0.00 | $11.56 | SUTX2014-013 eff. 07/21/2014 |
| IRONWORKER, REINFORCING | $12.10 EO 13658 minimum $13.65 may apply | $0.00 | $12.10 | SUTX2014-013 eff. 07/21/2014 |
| GLAZIER | $19.12 | $4.41 | $23.53 | SUTX2014-013 eff. 07/21/2014 |
| FORM WORKER | $12.57 EO 13658 minimum $13.65 may apply | $0.00 | $12.57 | SUTX2014-013 eff. 07/21/2014 |
| FLOOR LAYER: CARPET | $20.00 | $0.00 | $20.00 | SUTX2014-013 eff. 07/21/2014 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $18.00 | $1.68 | $19.68 | SUTX2014-013 eff. 07/21/2014 |
| ELECTRICIAN (ALARM INSTALLATION ONLY) | $17.97 | $3.37 | $21.34 | SUTX2014-013 eff. 07/21/2014 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $17.45 | $3.96 | $21.41 | SUTX2014-013 eff. 07/21/2014 |
| DRYWALL FINISHER/TAPER | $16.28 | $3.67 | $19.95 | SUTX2014-013 eff. 07/21/2014 |
| CEMENT MASON/CONCRETE FINISHER | $13.82 | $0.00 | $13.82 | SUTX2014-013 eff. 07/21/2014 |
| CAULKER | $15.36 | $0.00 | $15.36 | SUTX2014-013 eff. 07/21/2014 |
| BRICKLAYER | $19.86 | $0.00 | $19.86 | SUTX2014-013 eff. 07/21/2014 |
| ACOUSTICAL CEILING MECHANIC | $16.41 | $3.98 | $20.39 | SUTX2014-013 eff. 07/21/2014 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.