Texas prevailing wage rates: TX20260260
Building construction in McLennan County.
TX20260260, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
- changed ELECTRICIAN base $36.50 → $36.50, fringe $10.40 → $10.40 (+$0.01) Same effective date as before (06/01/2025).
0 classifications added, 1 removed or reworded
- removed POWER EQUIPMENT OPERATOR: (2) Cranes with Pile Driving or Caisson Attachment and Hydraulic Crane 60 tons and above was $28.75 + $10.60 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| BOILERMAKER | $33.17 | $24.92 | $58.09 | BOIL0074-003 eff. 01/01/2025 |
| ELECTRICIAN | $36.50 | $10.40 | $46.90 | ELEC0072-002 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR ((3) HYDRAULIC CRANES 59 TONS AND UNDER) | $32.35 | $13.10 | $45.45 | ENGI0178-005 eff. 06/01/2020 |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE) | $32.85 | $13.10 | $45.95 | ENGI0178-005 eff. 06/01/2020 |
| IRONWORKER: ORNAMENTAL | $28.26 | $8.13 | $36.39 | IRON0084-011 eff. 06/01/2024 |
| PIPEFITTER (EXCLUDES HVAC PIPE INSTALLATION) | $37.15 | $16.92 | $54.07 | PLUM0286-011 eff. 09/01/2025 |
| PLUMBER | $32.85 | $12.74 | $45.59 | PLUM0529-002 eff. 10/01/2024 |
| TRUCK DRIVER: WATER TRUCK | $12.00 EO 13658 minimum $13.65 may apply | $4.11 | $16.11 | SUTX2014-036 eff. 07/21/2014 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $12.50 EO 13658 minimum $13.65 may apply | $0.00 | $12.50 | SUTX2014-036 eff. 07/21/2014 |
| TRUCK DRIVER: FLATBED TRUCK | $19.65 | $8.57 | $28.22 | SUTX2014-036 eff. 07/21/2014 |
| TRUCK DRIVER: DUMP TRUCK | $12.24 EO 13658 minimum $13.65 may apply | $1.62 | $13.86 | SUTX2014-036 eff. 07/21/2014 |
| TILE SETTER | $14.74 | $0.00 | $14.74 | SUTX2014-036 eff. 07/21/2014 |
| TILE FINISHER | $11.22 EO 13658 minimum $13.65 may apply | $0.00 | $11.22 | SUTX2014-036 eff. 07/21/2014 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $14.62 | $0.00 | $14.62 | SUTX2014-036 eff. 07/21/2014 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $19.00 | $5.73 | $24.73 | SUTX2014-036 eff. 07/21/2014 |
| ROOFER | $13.75 | $0.00 | $13.75 | SUTX2014-036 eff. 07/21/2014 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $13.00 EO 13658 minimum $13.65 may apply | $0.00 | $13.00 | SUTX2014-036 eff. 07/21/2014 |
| OPERATOR: ROLLER | $13.11 EO 13658 minimum $13.65 may apply | $0.00 | $13.11 | SUTX2014-036 eff. 07/21/2014 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.03 | $0.00 | $16.03 | SUTX2014-036 eff. 07/21/2014 |
| OPERATOR: MECHANIC | $17.52 | $3.33 | $20.85 | SUTX2014-036 eff. 07/21/2014 |
| OPERATOR: LOADER | $14.01 | $0.44 | $14.45 | SUTX2014-036 eff. 07/21/2014 |
| OPERATOR: GRADER/BLADE | $14.34 | $1.68 | $16.02 | SUTX2014-036 eff. 07/21/2014 |
| OPERATOR: FORKLIFT | $15.00 | $0.00 | $15.00 | SUTX2014-036 eff. 07/21/2014 |
| OPERATOR: DRILL | $16.22 | $0.34 | $16.56 | SUTX2014-036 eff. 07/21/2014 |
| OPERATOR: BULLDOZER | $18.29 | $1.31 | $19.60 | SUTX2014-036 eff. 07/21/2014 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $13.93 | $0.00 | $13.93 | SUTX2014-036 eff. 07/21/2014 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $13.59 EO 13658 minimum $13.65 may apply | $1.60 | $15.19 | SUTX2014-036 eff. 07/21/2014 |
| LABORER: ROOF TEAROFF | $11.28 EO 13658 minimum $13.65 may apply | $0.00 | $11.28 | SUTX2014-036 eff. 07/21/2014 |
| LABORER: PIPELAYER | $12.49 EO 13658 minimum $13.65 may apply | $2.13 | $14.62 | SUTX2014-036 eff. 07/21/2014 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $9.93 EO 13658 minimum $13.65 may apply | $0.00 | $9.93 | SUTX2014-036 eff. 07/21/2014 |
| LABORER: MASON TENDER - BRICK | $8.00 EO 13658 minimum $13.65 may apply | $0.00 | $8.00 | SUTX2014-036 eff. 07/21/2014 |
| LABORER: COMMON OR GENERAL | $11.10 EO 13658 minimum $13.65 may apply | $0.00 | $11.10 | SUTX2014-036 eff. 07/21/2014 |
| IRONWORKER, STRUCTURAL | $20.50 | $5.15 | $25.65 | SUTX2014-036 eff. 07/21/2014 |
| IRONWORKER, REINFORCING | $13.35 EO 13658 minimum $13.65 may apply | $0.00 | $13.35 | SUTX2014-036 eff. 07/21/2014 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $19.77 | $7.13 | $26.90 | SUTX2014-036 eff. 07/21/2014 |
| HVAC MECHANIC (INSTALLATION OF HVAC UNIT ONLY) | $15.00 | $1.56 | $16.56 | SUTX2014-036 eff. 07/21/2014 |
| GLAZIER | $20.00 | $0.00 | $20.00 | SUTX2014-036 eff. 07/21/2014 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $14.27 | $0.00 | $14.27 | SUTX2014-036 eff. 07/21/2014 |
| CEMENT MASON/CONCRETE FINISHER | $13.13 EO 13658 minimum $13.65 may apply | $0.00 | $13.13 | SUTX2014-036 eff. 07/21/2014 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $14.76 | $0.00 | $14.76 | SUTX2014-036 eff. 07/21/2014 |
| BRICKLAYER | $18.00 | $0.00 | $18.00 | SUTX2014-036 eff. 07/21/2014 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.