Texas prevailing wage rates: TX20260277
Building construction in Calhoun, Goliad, Victoria Counties.
TX20260277, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
0 classifications added, 1 removed or reworded
- removed POWER EQUIPMENT OPERATOR: (2) Cranes with Pile Driving or Caisson Attachment and Hydraulic Crane 60 tons and above was $28.75 + $10.60 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| BOILERMAKER | $33.17 | $24.92 | $58.09 | BOIL0074-003 eff. 01/01/2025 |
| ELECTRICIAN | $30.80 | $8.97 | $39.77 | ELEC0278-002 eff. 08/25/2024 |
| POWER EQUIPMENT OPERATOR ((3) HYDRAULIC CRANES 59 TONS AND UNDER) | $32.35 | $13.10 | $45.45 | ENGI0178-005 eff. 06/01/2020 |
| POWER EQUIPMENT OPERATOR ((1) TOWER CRANE) | $32.85 | $13.10 | $45.95 | ENGI0178-005 eff. 06/01/2020 |
| IRONWORKER: ORNAMENTAL | $28.26 | $8.13 | $36.39 | IRON0084-011 eff. 06/01/2024 |
| TRUCK DRIVER: WATER TRUCK | $12.00 EO 13658 minimum $13.65 may apply | $4.11 | $16.11 | SUTX2014-057 eff. 07/21/2014 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $12.50 EO 13658 minimum $13.65 may apply | $0.00 | $12.50 | SUTX2014-057 eff. 07/21/2014 |
| TRUCK DRIVER: FLATBED TRUCK | $19.65 | $8.57 | $28.22 | SUTX2014-057 eff. 07/21/2014 |
| TRUCK DRIVER: DUMP TRUCK | $12.39 EO 13658 minimum $13.65 may apply | $1.18 | $13.57 | SUTX2014-057 eff. 07/21/2014 |
| TILE SETTER | $14.74 | $0.00 | $14.74 | SUTX2014-057 eff. 07/21/2014 |
| TILE FINISHER | $11.22 EO 13658 minimum $13.65 may apply | $0.00 | $11.22 | SUTX2014-057 eff. 07/21/2014 |
| SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $21.13 | $6.53 | $27.66 | SUTX2014-057 eff. 07/21/2014 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $22.73 | $7.52 | $30.25 | SUTX2014-057 eff. 07/21/2014 |
| ROOFER | $13.75 | $0.00 | $13.75 | SUTX2014-057 eff. 07/21/2014 |
| PLUMBER | $25.64 | $8.16 | $33.80 | SUTX2014-057 eff. 07/21/2014 |
| PIPEFITTER | $25.80 | $8.55 | $34.35 | SUTX2014-057 eff. 07/21/2014 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $14.45 | $0.00 | $14.45 | SUTX2014-057 eff. 07/21/2014 |
| OPERATOR: ROLLER | $12.70 EO 13658 minimum $13.65 may apply | $0.00 | $12.70 | SUTX2014-057 eff. 07/21/2014 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.03 | $0.00 | $16.03 | SUTX2014-057 eff. 07/21/2014 |
| OPERATOR: MECHANIC | $17.52 | $3.33 | $20.85 | SUTX2014-057 eff. 07/21/2014 |
| OPERATOR: LOADER | $13.55 EO 13658 minimum $13.65 may apply | $0.94 | $14.49 | SUTX2014-057 eff. 07/21/2014 |
| OPERATOR: GRADER/BLADE | $13.37 EO 13658 minimum $13.65 may apply | $0.00 | $13.37 | SUTX2014-057 eff. 07/21/2014 |
| OPERATOR: FORKLIFT | $14.83 | $0.00 | $14.83 | SUTX2014-057 eff. 07/21/2014 |
| OPERATOR: DRILL | $16.22 | $0.34 | $16.56 | SUTX2014-057 eff. 07/21/2014 |
| OPERATOR: BULLDOZER | $18.29 | $1.31 | $19.60 | SUTX2014-057 eff. 07/21/2014 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $13.93 | $0.00 | $13.93 | SUTX2014-057 eff. 07/21/2014 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $14.25 | $0.00 | $14.25 | SUTX2014-057 eff. 07/21/2014 |
| LABORER: ROOF TEAROFF | $11.28 EO 13658 minimum $13.65 may apply | $0.00 | $11.28 | SUTX2014-057 eff. 07/21/2014 |
| LABORER: PIPELAYER | $12.49 EO 13658 minimum $13.65 may apply | $2.13 | $14.62 | SUTX2014-057 eff. 07/21/2014 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $10.58 EO 13658 minimum $13.65 may apply | $0.00 | $10.58 | SUTX2014-057 eff. 07/21/2014 |
| LABORER: MASON TENDER - BRICK | $11.36 EO 13658 minimum $13.65 may apply | $0.00 | $11.36 | SUTX2014-057 eff. 07/21/2014 |
| LABORER: COMMON OR GENERAL | $9.68 EO 13658 minimum $13.65 may apply | $0.00 | $9.68 | SUTX2014-057 eff. 07/21/2014 |
| IRONWORKER, STRUCTURAL | $22.16 | $5.26 | $27.42 | SUTX2014-057 eff. 07/21/2014 |
| IRONWORKER, REINFORCING | $12.27 EO 13658 minimum $13.65 may apply | $0.00 | $12.27 | SUTX2014-057 eff. 07/21/2014 |
| INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $19.77 | $7.13 | $26.90 | SUTX2014-057 eff. 07/21/2014 |
| CEMENT MASON/CONCRETE FINISHER | $15.33 | $0.00 | $15.33 | SUTX2014-057 eff. 07/21/2014 |
| CARPENTER | $15.21 | $0.00 | $15.21 | SUTX2014-057 eff. 07/21/2014 |
| BRICKLAYER | $20.04 | $0.00 | $20.04 | SUTX2014-057 eff. 07/21/2014 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.