Texas prevailing wage rates: TX20260284
Building construction in Bandera County.
TX20260284, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
1 classifications added, 1 removed or reworded
- removed Including HVAC Pipe Installation PLUMBER was $38.97 + $11.48 fringe
- added PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) $38.97 + $11.48 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $29.50 | $8.79 | $38.29 | ASBE0087-014 eff. 06/03/2024 |
| BOILERMAKER | $33.17 | $24.92 | $58.09 | BOIL0074-003 eff. 01/01/2025 |
| BRICKLAYER | $25.50 | $8.12 | $33.62 | BRTX0005-006 eff. 06/01/2025 |
| ELECTRICIAN (COMMUNICATION TECHNICIAN ONLY) | $37.45 | $12.19 | $49.64 | ELEC0060-003 eff. 05/26/2025 |
| ELECTRICIAN (EXCLUDES LOW VOLTAGE WIRING) | $37.45 | $12.19 | $49.64 | ELEC0060-004 eff. 05/26/2025 |
ELEVATOR MECHANICScope and notesFOOTNOTE: A. 6% UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8% OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY, CHRISTMAS DAY, AND VETERANS DAY | $51.59 | $38.44 | $90.03 | ELEV0133-002 eff. 01/01/2025 |
| POWER EQUIPMENT OPERATOR (CRANES) | $39.47 | $10.39 | $49.86 | ENGI0450-002 eff. 04/01/2024 |
| IRONWORKER, STRUCTURAL | $27.95 | $8.03 | $35.98 | IRON0066-013 eff. 06/01/2025 |
| IRONWORKER: ORNAMENTAL | $28.26 | $8.13 | $36.39 | IRON0084-011 eff. 06/01/2024 |
| PLUMBER (EXCLUDES HVAC PIPE INSTALLATION) | $38.97 | $11.48 | $50.45 | PLUM0142-009 eff. 07/02/2025 |
| PIPEFITTER: INCLUDING HVAC PIPE INSTALLATION | $38.97 | $11.48 | $50.45 | PLUM0142-009 eff. 07/02/2025 |
| HVAC MECHANIC (ELECTRICAL TEMPERATURE CONTROL INSTALLATION & UNIT INSTALLATION ONLY) | $38.97 | $11.48 | $50.45 | PLUM0142-009 eff. 07/02/2025 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $38.57 | $24.47 | $63.04 | SFTX0669-002 eff. 04/01/2025 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $34.10 | $16.10 | $50.20 | SHEE0067-004 eff. 07/01/2025 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $34.10 | $16.10 | $50.20 | SHEE0067-004 eff. 07/01/2025 |
| TRUCK DRIVER: WATER TRUCK | $12.00 EO 13658 minimum $13.65 may apply | $4.11 | $16.11 | SUTX2014-064 eff. 07/21/2014 |
| TRUCK DRIVER: SEMI-TRAILER TRUCK | $12.50 EO 13658 minimum $13.65 may apply | $0.00 | $12.50 | SUTX2014-064 eff. 07/21/2014 |
| TRUCK DRIVER: FLATBED TRUCK | $19.65 | $8.57 | $28.22 | SUTX2014-064 eff. 07/21/2014 |
| TRUCK DRIVER: DUMP TRUCK | $12.39 EO 13658 minimum $13.65 may apply | $1.18 | $13.57 | SUTX2014-064 eff. 07/21/2014 |
| TILE SETTER | $16.09 | $0.00 | $16.09 | SUTX2014-064 eff. 07/21/2014 |
| TILE FINISHER | $11.32 EO 13658 minimum $13.65 may apply | $0.00 | $11.32 | SUTX2014-064 eff. 07/21/2014 |
| ROOFER | $12.00 EO 13658 minimum $13.65 may apply | $0.00 | $12.00 | SUTX2014-064 eff. 07/21/2014 |
| PAINTER (BRUSH, ROLLER AND SPRAY), EXCLUDES DRYWALL FINISHING/TAPING | $13.13 EO 13658 minimum $13.65 may apply | $0.00 | $13.13 | SUTX2014-064 eff. 07/21/2014 |
| OPERATOR: ROLLER | $11.25 EO 13658 minimum $13.65 may apply | $0.00 | $11.25 | SUTX2014-064 eff. 07/21/2014 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $16.03 | $0.00 | $16.03 | SUTX2014-064 eff. 07/21/2014 |
| OPERATOR: MECHANIC | $18.75 | $5.12 | $23.87 | SUTX2014-064 eff. 07/21/2014 |
| OPERATOR: LOADER | $13.90 | $0.00 | $13.90 | SUTX2014-064 eff. 07/21/2014 |
| OPERATOR: GRADER/BLADE | $19.30 | $0.00 | $19.30 | SUTX2014-064 eff. 07/21/2014 |
| OPERATOR: FORKLIFT | $13.06 EO 13658 minimum $13.65 may apply | $0.00 | $13.06 | SUTX2014-064 eff. 07/21/2014 |
| OPERATOR: DRILL | $14.50 | $0.00 | $14.50 | SUTX2014-064 eff. 07/21/2014 |
| OPERATOR: BULLDOZER | $14.00 | $0.00 | $14.00 | SUTX2014-064 eff. 07/21/2014 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $14.00 | $0.00 | $14.00 | SUTX2014-064 eff. 07/21/2014 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.43 | $3.49 | $22.92 | SUTX2014-064 eff. 07/21/2014 |
| LABORER: LANDSCAPE AND IRRIGATION | $8.00 EO 13658 minimum $13.65 may apply | $0.00 | $8.00 | SUTX2014-064 eff. 07/21/2014 |
| LABORER: ROOF TEAROFF | $11.28 EO 13658 minimum $13.65 may apply | $0.00 | $11.28 | SUTX2014-064 eff. 07/21/2014 |
| LABORER: PIPELAYER | $11.00 EO 13658 minimum $13.65 may apply | $0.00 | $11.00 | SUTX2014-064 eff. 07/21/2014 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.00 EO 13658 minimum $13.65 may apply | $0.00 | $12.00 | SUTX2014-064 eff. 07/21/2014 |
| LABORER: MASON TENDER - BRICK | $12.00 EO 13658 minimum $13.65 may apply | $0.00 | $12.00 | SUTX2014-064 eff. 07/21/2014 |
| LABORER: COMMON OR GENERAL | $11.23 EO 13658 minimum $13.65 may apply | $0.00 | $11.23 | SUTX2014-064 eff. 07/21/2014 |
| IRONWORKER, REINFORCING | $12.27 EO 13658 minimum $13.65 may apply | $0.00 | $12.27 | SUTX2014-064 eff. 07/21/2014 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $20.19 | $3.75 | $23.94 | SUTX2014-064 eff. 07/21/2014 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $15.38 | $0.00 | $15.38 | SUTX2014-064 eff. 07/21/2014 |
| DRYWALL FINISHER/TAPER | $13.81 | $0.00 | $13.81 | SUTX2014-064 eff. 07/21/2014 |
| CEMENT MASON/CONCRETE FINISHER | $22.27 | $5.30 | $27.57 | SUTX2014-064 eff. 07/21/2014 |
| CAULKER | $15.00 | $0.00 | $15.00 | SUTX2014-064 eff. 07/21/2014 |
| CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $16.82 | $3.79 | $20.61 | SUTX2014-064 eff. 07/21/2014 |
| CARPENTER (FORM WORK ONLY) | $13.63 EO 13658 minimum $13.65 may apply | $0.00 | $13.63 | SUTX2014-064 eff. 07/21/2014 |
| CARPENTER (ACOUSTICAL CEILING INSTALLATION ONLY) | $18.00 | $0.00 | $18.00 | SUTX2014-064 eff. 07/21/2014 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.