Texas prevailing wage rates: TX20260299
Highway construction in Austin, Brazoria, Chambers, Fort Bend, Galveston, Hardin, Harris, Jefferson, Liberty, Montgomery, Orange, San Jacinto, Waller Counties.
TX20260299, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| WORK ZONE BARRICADE SERVICER | $17.37 | $0.00 | $17.37 | SATX2025-013 eff. 11/15/2023 |
| WELDER | $20.97 | $0.00 | $20.97 | SATX2025-013 eff. 11/15/2023 |
| TRUCK DRIVER, TANDEM AXLE TRACTOR WITH SEMI TRAILER | $20.17 | $0.00 | $20.17 | SATX2025-013 eff. 11/15/2023 |
| TRUCK DRIVER, SINGLE OR TANDEM AXLE DUMP TRUCK | $18.60 | $0.00 | $18.60 | SATX2025-013 eff. 11/15/2023 |
| TRUCK DRIVER, SINGLE AXLE | $21.93 | $0.00 | $21.93 | SATX2025-013 eff. 11/15/2023 |
| TRUCK DRIVER LOWBOY FLOAT | $25.94 | $0.00 | $25.94 | SATX2025-013 eff. 11/15/2023 |
| STRUCTURAL STEEL WORKER | $22.64 | $0.00 | $22.64 | SATX2025-013 eff. 11/15/2023 |
| SPREADER BOX OPERATOR | $17.84 | $0.00 | $17.84 | SATX2025-013 eff. 11/15/2023 |
| SERVICER | $20.33 | $0.00 | $20.33 | SATX2025-013 eff. 11/15/2023 |
| ROLLER OPERATOR, OTHER | $18.93 | $0.00 | $18.93 | SATX2025-013 eff. 11/15/2023 |
| ROLLER OPERATOR, ASPHALT | $19.79 | $0.00 | $19.79 | SATX2025-013 eff. 11/15/2023 |
| REINFORCING STEEL WORKER | $22.34 | $0.00 | $22.34 | SATX2025-013 eff. 11/15/2023 |
| PIPELAYER | $20.03 | $0.00 | $20.03 | SATX2025-013 eff. 11/15/2023 |
| PILEDRIVER | $21.48 | $0.00 | $21.48 | SATX2025-013 eff. 11/15/2023 |
| PAVEMENT MARKING MACHINE OPERATOR | $17.12 | $0.00 | $17.12 | SATX2025-013 eff. 11/15/2023 |
| PAINTER, STRUCTURES | $26.40 | $0.00 | $26.40 | SATX2025-013 eff. 11/15/2023 |
| OFF ROAD HAULER | $17.12 | $0.00 | $17.12 | SATX2025-013 eff. 11/15/2023 |
| MOTOR GRADER OPERATOR, ROUGH | $21.20 | $0.00 | $21.20 | SATX2025-013 eff. 11/15/2023 |
| MOTOR GRADER OPERATOR, FINE GRADE | $23.91 | $0.00 | $23.91 | SATX2025-013 eff. 11/15/2023 |
| MILLING MACHINE OPERATOR | $21.65 | $0.00 | $21.65 | SATX2025-013 eff. 11/15/2023 |
| MECHANIC | $23.38 | $0.00 | $23.38 | SATX2025-013 eff. 11/15/2023 |
| LOADER/BACKHOE OPERATOR | $21.37 | $0.00 | $21.37 | SATX2025-013 eff. 11/15/2023 |
| LABORER, UTILITY | $19.11 | $0.00 | $19.11 | SATX2025-013 eff. 11/15/2023 |
| LABORER, COMMON | $17.12 | $0.00 | $17.12 | SATX2025-013 eff. 11/15/2023 |
| FRONT END LOADER OPERATOR, OVER 3 CY | $20.34 | $0.00 | $20.34 | SATX2025-013 eff. 11/15/2023 |
| FRONT END LOADER OPERATOR, 3 CY OR LESS | $19.72 | $0.00 | $19.72 | SATX2025-013 eff. 11/15/2023 |
| FOUNDATION DRILL OPERATOR, TRUCK MOUNTED | $26.04 | $0.00 | $26.04 | SATX2025-013 eff. 11/15/2023 |
| FOUNDATION DRILL OPERATOR, CRAWLER MOUNTED | $22.25 | $0.00 | $22.25 | SATX2025-013 eff. 11/15/2023 |
| FORM SETTER, PAVING & CURB | $19.32 | $0.00 | $19.32 | SATX2025-013 eff. 11/15/2023 |
| FORM BUILDER/SETTER, STRUCTURES | $19.93 | $0.00 | $19.93 | SATX2025-013 eff. 11/15/2023 |
| FLAGGER | $16.63 | $0.00 | $16.63 | SATX2025-013 eff. 11/15/2023 |
| EXCAVATOR OPERATOR, OVER 50,000 POUNDS | $22.24 | $0.00 | $22.24 | SATX2025-013 eff. 11/15/2023 |
| EXCAVATOR OPERATOR, 50,000 POUNDS OR LESS | $21.53 | $0.00 | $21.53 | SATX2025-013 eff. 11/15/2023 |
| ELECTRICIAN | $31.46 | $0.00 | $31.46 | SATX2025-013 eff. 11/15/2023 |
| CRAWLER TRACTOR OPERATOR | $20.33 | $0.00 | $20.33 | SATX2025-013 eff. 11/15/2023 |
| CRANE OPERATOR, LATTICE BOOM OVER 80 TONS | $23.85 | $0.00 | $23.85 | SATX2025-013 eff. 11/15/2023 |
| CRANE OPERATOR, LATTICE BOOM 80 TONS OR LESS | $25.74 | $0.00 | $25.74 | SATX2025-013 eff. 11/15/2023 |
| CRANE OPERATOR, HYDRAULIC 80 TONS OR LESS | $24.75 | $0.00 | $24.75 | SATX2025-013 eff. 11/15/2023 |
| CONCRETE SAW OPERATOR | $21.57 | $0.00 | $21.57 | SATX2025-013 eff. 11/15/2023 |
| CONCRETE PAVING, CURING, FLOAT, TEXTURING MACHINE OPERATOR | $22.62 | $0.00 | $22.62 | SATX2025-013 eff. 11/15/2023 |
| CONCRETE PAVEMENT FINISHING MACHINE OPERATOR | $22.18 | $0.00 | $22.18 | SATX2025-013 eff. 11/15/2023 |
| CONCRETE FINISHER, PAVING AND STRUCTURES | $20.79 | $0.00 | $20.79 | SATX2025-013 eff. 11/15/2023 |
| BROOM OR SWEEPER OPERATOR | $17.63 | $0.00 | $17.63 | SATX2025-013 eff. 11/15/2023 |
| ASPHALT RAKER | $20.41 | $0.00 | $20.41 | SATX2025-013 eff. 11/15/2023 |
| ASPHALT PAVING MACHINE OPERATOR | $22.67 | $0.00 | $22.67 | SATX2025-013 eff. 11/15/2023 |
| ASPHALT DISTRIBUTOR OPERATOR | $23.26 | $0.00 | $23.26 | SATX2025-013 eff. 11/15/2023 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.