Utah prevailing wage rates: UT20260011

Heavy construction in Summit County.

UT20260011, modification 1, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 0

No existing rate changed amount.

7 classifications added, 7 removed or reworded
  • added TRUCK DRIVER ZONE 1: GROUP 1 $41.39 + $15.10 fringe
  • added TRUCK DRIVER ZONE 1: GROUP 2 $40.75 + $15.10 fringe
  • added TRUCK DRIVER ZONE 1: GROUP 3 $40.37 + $15.10 fringe
  • added TRUCK DRIVER ZONE 2: GROUP 1 $46.65 + $15.75 fringe
  • added TRUCK DRIVER ZONE 2: GROUP 2 $46.02 + $15.75 fringe
  • added TRUCK DRIVER ZONE 2: GROUP 3 $41.90 + $15.75 fringe
  • removed TRUCK DRIVER: Group 1 was $41.39 + $15.10 fringe
  • removed TRUCK DRIVER: Group 1 was $46.65 + $15.75 fringe
  • removed TRUCK DRIVER: Group 2 was $40.75 + $15.10 fringe
  • removed TRUCK DRIVER: Group 2 was $46.02 + $15.75 fringe
  • removed TRUCK DRIVER: Group 3 was $40.37 + $15.10 fringe
  • removed TRUCK DRIVER: Group 3 was $41.90 + $15.75 fringe
  • removed WATER & SEWER LINES: Operator-Backhoe/Excavator/Tra ckhoe was $15.57 + $0.00 fringe
  • added WATER & SEWER LINES: OPERATOR-BACKHOE/EXCAVATOR/TRACKHOE $15.57 + $0.00 fringe

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

UT20260011 wage rates
ClassificationBaseFringeTotalRate ID
LINE CONSTRUCTION: LINEMAN$58.83$21.21$80.04ELEC0057-002
eff. 03/01/2025
OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, BOBCAT/SKID LOADER, FRONT END LOADER(UNDER 2 CU. YDS.), OILER$36.55$18.62$55.17ENGI0003-005
eff. 07/01/2024
OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BULLDOZER, FRONT END LOADER(2 TO 5 CU. YDS.), GRADE SETTER, OIL DISTRIBUTOR, SCRAPER$37.79$18.62$56.41ENGI0003-005
eff. 07/01/2024
OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER(OVER 5 CU.YDS.)$39.01$18.62$57.63ENGI0003-005
eff. 07/01/2024
OPERATOR: POWER EQUIPMENT: (1)MECHANIC-EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION$41.71$18.62$60.33ENGI0003-005
eff. 07/01/2024
OPERATOR: POWER EQUIPMENT (6) SCREED$36.55$18.62$55.17ENGI0003-005
eff. 07/01/2024
OPERATOR: POWER EQUIPMENT ((7) ROLLER(DIRT AND GRADE COMPACTION))$34.25$18.62$52.87ENGI0003-005
eff. 07/01/2024
OPERATOR: POWER EQUIPMENT ((2A)BLADE/GRADER)$40.32$18.62$58.94ENGI0003-005
eff. 07/01/2024
OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, MECHANIC: NATURAL GAS PIPELINE CONSTRUCTION ONLY$35.68$17.57$53.25ENGI0003-056
eff. 07/01/2013
OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$22.03$11.88$33.91ENGI0003-056
eff. 07/01/2013
IRONWORKER$32.68$27.55$60.23IRON0027-001
eff. 07/01/2024
LABORER: POT TENDER AND SAND BLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$20.85$8.65$29.50LABO0295-006
eff. 07/01/2014
LABORER: COMMON OR GENERAL, PIPELAYER: NATURAL GAS PIPELINE CONSTRUCTION ONLY$20.59$8.65$29.24LABO0295-006
eff. 07/01/2014
LABORER: (5)HAND HELD DRILL$21.65$8.65$30.30LABO0295-015
eff. 07/01/2014
LABORER: (3) MASON TENDER (CEMENT/CONCRETE), HAND HELD SAW, JACKHAMMER, POWER SAW)$20.85$8.65$29.50LABO0295-015
eff. 07/01/2014
LABORER: (1)FLAGGER$20.59$8.65$29.24LABO0295-015
eff. 07/01/2014
LABORER: (1) COMMON OR GENERAL: EXCLUDING NATURAL GAS PIPELINE & WATER/SEWER LINE CONSTRUCTION$20.59$8.65$29.24LABO0295-038
eff. 07/01/2014
WATER & SEWER LINES: OPERATOR-BACKHOE/EXCAVATOR/TRACKHOE$15.57$0.00$15.57SUUT2008-040
eff. 08/19/2008
WATER & SEWER LINES: LABORER, COMMON OR GENERAL$12.81
EO 13658 minimum $13.65 may apply
$0.00$12.81SUUT2008-040
eff. 08/19/2008
TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$14.40$3.99$18.39SUUT2008-040
eff. 08/19/2008
OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE AND WATER/SEWER LINE CONSTRUCTION)$19.98$0.00$19.98SUUT2008-040
eff. 08/19/2008
OPERATOR: CRANE$28.97$9.40$38.37SUUT2008-040
eff. 08/19/2008
LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION)$14.00$0.00$14.00SUUT2008-040
eff. 08/19/2008
LABORER: LANDSCAPE$7.25
EO 13658 minimum $13.65 may apply
$0.00$7.25SUUT2008-040
eff. 08/19/2008
ELECTRICIAN$23.74$7.64$31.38SUUT2008-040
eff. 08/19/2008
CEMENT MASON/CONCRETE FINISHER$17.08$3.14$20.22SUUT2008-040
eff. 08/19/2008
CARPENTER, INCLUDES FORM WORK$14.63$0.97$15.60SUUT2008-040
eff. 08/19/2008
TRUCK DRIVER ZONE 2: GROUP 3$41.90$15.75$57.65TEAM0222-002
eff. 07/01/2025
TRUCK DRIVER ZONE 2: GROUP 2$46.02$15.75$61.77TEAM0222-002
eff. 07/01/2025
TRUCK DRIVER ZONE 2: GROUP 1$46.65$15.75$62.40TEAM0222-002
eff. 07/01/2025
TRUCK DRIVER ZONE 1: GROUP 3$40.37$15.10$55.47TEAM0222-002
eff. 07/01/2025
TRUCK DRIVER ZONE 1: GROUP 2$40.75$15.10$55.85TEAM0222-002
eff. 07/01/2025
TRUCK DRIVER ZONE 1: GROUP 1$41.39$15.10$56.49TEAM0222-002
eff. 07/01/2025

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.