Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
7 classifications added, 7 removed or reworded
- added TRUCK DRIVER ZONE 1: GROUP 1 $41.39 + $15.10 fringe
- added TRUCK DRIVER ZONE 1: GROUP 2 $40.75 + $15.10 fringe
- added TRUCK DRIVER ZONE 1: GROUP 3 $40.37 + $15.10 fringe
- added TRUCK DRIVER ZONE 2: GROUP 1 $46.65 + $15.75 fringe
- added TRUCK DRIVER ZONE 2: GROUP 2 $46.02 + $15.75 fringe
- added TRUCK DRIVER ZONE 2: GROUP 3 $41.90 + $15.75 fringe
- removed TRUCK DRIVER: Group 1 was $41.39 + $15.10 fringe
- removed TRUCK DRIVER: Group 1 was $46.65 + $15.75 fringe
- removed TRUCK DRIVER: Group 2 was $40.75 + $15.10 fringe
- removed TRUCK DRIVER: Group 2 was $46.02 + $15.75 fringe
- removed TRUCK DRIVER: Group 3 was $40.37 + $15.10 fringe
- removed TRUCK DRIVER: Group 3 was $41.90 + $15.75 fringe
- removed WATER & SEWER LINES: Operator-Backhoe/Excavator/Tra ckhoe was $15.57 + $0.00 fringe
- added WATER & SEWER LINES: OPERATOR-BACKHOE/EXCAVATOR/TRACKHOE $15.57 + $0.00 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| LINE CONSTRUCTION: LINEMAN | $58.83 | $21.21 | $80.04 | ELEC0057-002 eff. 03/01/2025 |
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, BOBCAT/SKID LOADER, FRONT END LOADER(UNDER 2 CU. YDS.), OILER | $36.55 | $18.62 | $55.17 | ENGI0003-005 eff. 07/01/2024 |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BULLDOZER, FRONT END LOADER(2 TO 5 CU. YDS.), GRADE SETTER, OIL DISTRIBUTOR, SCRAPER | $37.79 | $18.62 | $56.41 | ENGI0003-005 eff. 07/01/2024 |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER(OVER 5 CU.YDS.) | $39.01 | $18.62 | $57.63 | ENGI0003-005 eff. 07/01/2024 |
| OPERATOR: POWER EQUIPMENT: (1)MECHANIC-EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION | $41.71 | $18.62 | $60.33 | ENGI0003-005 eff. 07/01/2024 |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $36.55 | $18.62 | $55.17 | ENGI0003-005 eff. 07/01/2024 |
| OPERATOR: POWER EQUIPMENT ((7) ROLLER(DIRT AND GRADE COMPACTION)) | $34.25 | $18.62 | $52.87 | ENGI0003-005 eff. 07/01/2024 |
| OPERATOR: POWER EQUIPMENT ((2A)BLADE/GRADER) | $40.32 | $18.62 | $58.94 | ENGI0003-005 eff. 07/01/2024 |
| OPERATOR: POWER EQUIPMENT: BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, MECHANIC: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $35.68 | $17.57 | $53.25 | ENGI0003-056 eff. 07/01/2013 |
| OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $22.03 | $11.88 | $33.91 | ENGI0003-056 eff. 07/01/2013 |
| IRONWORKER | $32.68 | $27.55 | $60.23 | IRON0027-001 eff. 07/01/2024 |
| LABORER: POT TENDER AND SAND BLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 | $29.50 | LABO0295-006 eff. 07/01/2014 |
| LABORER: COMMON OR GENERAL, PIPELAYER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.59 | $8.65 | $29.24 | LABO0295-006 eff. 07/01/2014 |
| LABORER: (5)HAND HELD DRILL | $21.65 | $8.65 | $30.30 | LABO0295-015 eff. 07/01/2014 |
| LABORER: (3) MASON TENDER (CEMENT/CONCRETE), HAND HELD SAW, JACKHAMMER, POWER SAW) | $20.85 | $8.65 | $29.50 | LABO0295-015 eff. 07/01/2014 |
| LABORER: (1)FLAGGER | $20.59 | $8.65 | $29.24 | LABO0295-015 eff. 07/01/2014 |
| LABORER: (1) COMMON OR GENERAL: EXCLUDING NATURAL GAS PIPELINE & WATER/SEWER LINE CONSTRUCTION | $20.59 | $8.65 | $29.24 | LABO0295-038 eff. 07/01/2014 |
| WATER & SEWER LINES: OPERATOR-BACKHOE/EXCAVATOR/TRACKHOE | $15.57 | $0.00 | $15.57 | SUUT2008-040 eff. 08/19/2008 |
| WATER & SEWER LINES: LABORER, COMMON OR GENERAL | $12.81 EO 13658 minimum $13.65 may apply | $0.00 | $12.81 | SUUT2008-040 eff. 08/19/2008 |
| TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $14.40 | $3.99 | $18.39 | SUUT2008-040 eff. 08/19/2008 |
| OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE AND WATER/SEWER LINE CONSTRUCTION) | $19.98 | $0.00 | $19.98 | SUUT2008-040 eff. 08/19/2008 |
| OPERATOR: CRANE | $28.97 | $9.40 | $38.37 | SUUT2008-040 eff. 08/19/2008 |
| LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $14.00 | $0.00 | $14.00 | SUUT2008-040 eff. 08/19/2008 |
| LABORER: LANDSCAPE | $7.25 EO 13658 minimum $13.65 may apply | $0.00 | $7.25 | SUUT2008-040 eff. 08/19/2008 |
| ELECTRICIAN | $23.74 | $7.64 | $31.38 | SUUT2008-040 eff. 08/19/2008 |
| CEMENT MASON/CONCRETE FINISHER | $17.08 | $3.14 | $20.22 | SUUT2008-040 eff. 08/19/2008 |
| CARPENTER, INCLUDES FORM WORK | $14.63 | $0.97 | $15.60 | SUUT2008-040 eff. 08/19/2008 |
| TRUCK DRIVER ZONE 2: GROUP 3 | $41.90 | $15.75 | $57.65 | TEAM0222-002 eff. 07/01/2025 |
| TRUCK DRIVER ZONE 2: GROUP 2 | $46.02 | $15.75 | $61.77 | TEAM0222-002 eff. 07/01/2025 |
| TRUCK DRIVER ZONE 2: GROUP 1 | $46.65 | $15.75 | $62.40 | TEAM0222-002 eff. 07/01/2025 |
| TRUCK DRIVER ZONE 1: GROUP 3 | $40.37 | $15.10 | $55.47 | TEAM0222-002 eff. 07/01/2025 |
| TRUCK DRIVER ZONE 1: GROUP 2 | $40.75 | $15.10 | $55.85 | TEAM0222-002 eff. 07/01/2025 |
| TRUCK DRIVER ZONE 1: GROUP 1 | $41.39 | $15.10 | $56.49 | TEAM0222-002 eff. 07/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.