Utah prevailing wage rates: UT20260017
Heavy construction in Beaver, Emery, Grand, Kane, Piute, Wayne Counties.
UT20260017, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
6 classifications added, 6 removed or reworded
- added TRUCK DRIVER ZONE 1: GROUP 1 $41.71 + $14.75 fringe
- added TRUCK DRIVER ZONE 1: GROUP 2 $41.06 + $15.75 fringe
- added TRUCK DRIVER ZONE 1: GROUP 3 $40.66 + $15.75 fringe
- added TRUCK DRIVER ZONE 2: GROUP 1 $46.18 + $14.90 fringe
- added TRUCK DRIVER ZONE 2: GROUP 2 $45.57 + $14.90 fringe
- added TRUCK DRIVER ZONE 2: GROUP 3 $41.57 + $14.90 fringe
- removed TRUCK DRIVER: Group 1 was $41.71 + $14.75 fringe
- removed TRUCK DRIVER: Group 1 was $46.18 + $14.90 fringe
- removed TRUCK DRIVER: Group 2 was $41.06 + $15.75 fringe
- removed TRUCK DRIVER: Group 2 was $45.57 + $14.90 fringe
- removed TRUCK DRIVER: Group 3 was $40.66 + $15.75 fringe
- removed TRUCK DRIVER: Group 3 was $41.57 + $14.90 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| OPERATOR: POWER EQUIPMENT (3) BACKHOE/EXCAVATOR | $30.78 | $16.09 | $46.87 | ENGI0003-046 eff. 07/01/2020 |
| OPERATOR: POWER EQUIPMENT OILER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $22.03 | $11.88 | $33.91 | ENGI0003-054 eff. 07/01/2013 |
| OPERATOR: POWER EQUIPMENT BACKHOE/EXCAVATOR/TRACKHOE, BLADE/GRADER, BOOM, BULLDOZER, CRANE, MECHANIC, TRENCHER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $35.68 | $17.57 | $53.25 | ENGI0003-054 eff. 07/01/2013 |
| LABORER SANDBLASTER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 | $29.50 | LABO0295-018 eff. 07/01/2014 |
| LABORER POWDERMAN: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $21.65 | $8.65 | $30.30 | LABO0295-018 eff. 07/01/2014 |
| LABORER FORMWORKER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 | $29.50 | LABO0295-018 eff. 07/01/2014 |
| LABORER COMMON OR GENERAL, NAIL GUN, PIPELAYER, POT TENDER: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.59 | $8.65 | $29.24 | LABO0295-018 eff. 07/01/2014 |
| LABORER CHAIN SAW AND POWER DRILL: NATURAL GAS PIPELINE CONSTRUCTION ONLY | $20.85 | $8.65 | $29.50 | LABO0295-018 eff. 07/01/2014 |
| TRUCK DRIVER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $12.00 EO 13658 minimum $13.65 may apply | $0.00 | $12.00 | SUUT2008-033 eff. 08/19/2008 |
| OPERATOR: TRACKHOE (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $13.63 EO 13658 minimum $13.65 may apply | $0.00 | $13.63 | SUUT2008-033 eff. 08/19/2008 |
| OPERATOR: ROLLER (DIRT AND GRADE COMPACTION) | $10.89 EO 13658 minimum $13.65 may apply | $0.00 | $10.89 | SUUT2008-033 eff. 08/19/2008 |
| OPERATOR: LOADER (FRONT END) | $11.38 EO 13658 minimum $13.65 may apply | $0.00 | $11.38 | SUUT2008-033 eff. 08/19/2008 |
| OPERATOR: GRADER/BLADE, EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION | $13.61 EO 13658 minimum $13.65 may apply | $0.00 | $13.61 | SUUT2008-033 eff. 08/19/2008 |
| LABORER: PIPELAYER (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $9.00 EO 13658 minimum $13.65 may apply | $0.00 | $9.00 | SUUT2008-033 eff. 08/19/2008 |
| LABORER: COMMON OR GENERAL (EXCLUDING NATURAL GAS PIPELINE CONSTRUCTION) | $10.92 EO 13658 minimum $13.65 may apply | $0.00 | $10.92 | SUUT2008-033 eff. 08/19/2008 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $9.00 EO 13658 minimum $13.65 may apply | $0.36 | $9.36 | SUUT2008-033 eff. 08/19/2008 |
| CEMENT MASON/CONCRETE FINISHER | $14.00 | $0.56 | $14.56 | SUUT2008-033 eff. 08/19/2008 |
| CARPENTER, INCLUDES FORM WORK (EXCLUDES NATURAL GAS PIPELINE CONSTRUCTION FORM WORK) | $14.75 | $3.03 | $17.78 | SUUT2008-033 eff. 08/19/2008 |
| TRUCK DRIVER ZONE 2: GROUP 3 | $41.57 | $14.90 | $56.47 | TEAM0222-003 eff. 07/01/2025 |
| TRUCK DRIVER ZONE 2: GROUP 2 | $45.57 | $14.90 | $60.47 | TEAM0222-003 eff. 07/01/2025 |
| TRUCK DRIVER ZONE 2: GROUP 1 | $46.18 | $14.90 | $61.08 | TEAM0222-003 eff. 07/01/2025 |
| TRUCK DRIVER ZONE 1: GROUP 3 | $40.66 | $15.75 | $56.41 | TEAM0222-003 eff. 07/01/2025 |
| TRUCK DRIVER ZONE 1: GROUP 2 | $41.06 | $15.75 | $56.81 | TEAM0222-003 eff. 07/01/2025 |
| TRUCK DRIVER ZONE 1: GROUP 1 | $41.71 | $14.75 | $56.46 | TEAM0222-003 eff. 07/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.