Utah prevailing wage rates: UT20260032
Residential construction in Juab County.
UT20260032, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| OPERATOR: POWER EQUIPMENT: (7) ROLLER (DIRT AND GRADE COMPACTION) | $21.50 | $15.65 | $37.15 | ENGI0003-052 eff. 07/01/2013 |
| OPERATOR: POWER EQUIPMENT: (5) ASPHALT ROLLER, FRONT END LOADER (UNDER 2 CU. YDS.) | $23.37 | $15.65 | $39.02 | ENGI0003-052 eff. 07/01/2013 |
| OPERATOR: POWER EQUIPMENT: (4) ASPHALT PAVER, BACKHOE LOADER COMBO, BULLDOZER, FRONT END LOADER (2 TO 5 CU. YDS.), OIL DISTRIBUTOR | $24.37 | $15.65 | $40.02 | ENGI0003-052 eff. 07/01/2013 |
| OPERATOR: POWER EQUIPMENT: (3) BACKHOE/EXCAVATOR, FRONT END LOADER (OVER 5 CU. YDS. ) | $25.37 | $15.65 | $41.02 | ENGI0003-052 eff. 07/01/2013 |
| OPERATOR: POWER EQUIPMENT: (2A) BLADE/GRADER | $25.89 | $15.65 | $41.54 | ENGI0003-052 eff. 07/01/2013 |
| OPERATOR: POWER EQUIPMENT: (1) MECHANIC | $27.55 | $15.65 | $43.20 | ENGI0003-052 eff. 07/01/2013 |
| OPERATOR: POWER EQUIPMENT (6) SCREED | $22.41 | $15.65 | $38.06 | ENGI0003-052 eff. 07/01/2013 |
| LABORER: COMMON OR GENERAL, CHAIN/CONCRETE SAW, JACKHAMMER AND VIBRATOR | $18.28 | $6.35 | $24.63 | LABO0295-027 eff. 07/01/2012 |
| PLUMBER | $30.60 | $10.85 | $41.45 | PLUM0140-015 eff. 08/01/2019 |
| SHEET METAL WORKER | $16.00 | $0.00 | $16.00 | SUUT2008-047 eff. 08/28/2008 |
| ROOFER | $17.14 | $0.00 | $17.14 | SUUT2008-047 eff. 08/28/2008 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $15.05 | $0.00 | $15.05 | SUUT2008-047 eff. 08/28/2008 |
| OPERATOR: TRACKHOE | $16.14 | $0.00 | $16.14 | SUUT2008-047 eff. 08/28/2008 |
| LABORER: MASON TENDER (BRICK AND HOD) | $12.00 EO 13658 minimum $13.65 may apply | $0.00 | $12.00 | SUUT2008-047 eff. 08/28/2008 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.87 EO 13658 minimum $13.65 may apply | $0.00 | $12.87 | SUUT2008-047 eff. 08/28/2008 |
| LABORER: LANDSCAPE | $10.00 EO 13658 minimum $13.65 may apply | $0.19 | $10.19 | SUUT2008-047 eff. 08/28/2008 |
| LABORER: ASPHALT SHOVELER | $12.95 EO 13658 minimum $13.65 may apply | $0.00 | $12.95 | SUUT2008-047 eff. 08/28/2008 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING FOR PHONE SYSTEMS | $15.65 | $1.98 | $17.63 | SUUT2008-047 eff. 08/28/2008 |
| CEMENT MASON/CONCRETE FINISHER | $16.02 | $0.00 | $16.02 | SUUT2008-047 eff. 08/28/2008 |
| CARPENTER | $15.01 | $0.94 | $15.95 | SUUT2008-047 eff. 08/28/2008 |
| BRICKLAYER | $17.41 | $0.00 | $17.41 | SUUT2008-047 eff. 08/28/2008 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (LESS THAN 1,200 GAL.) | $29.37 | $14.65 | $44.02 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (6,000 GAL. TO LESS THAN 10,000 GAL) | $28.60 | $14.65 | $43.25 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (4,000 GAL. TO LESS THAN 6,000 GAL) | $28.33 | $14.65 | $42.98 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (25,000 GAL. AND OVER) | $31.20 | $14.65 | $45.85 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (20,000 GAL. TO LESS THAN 25,000 GAL) | $31.04 | $14.65 | $45.69 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (2,500 GAL. TO LESS THAN 4,000 GAL) | $29.53 | $14.65 | $44.18 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (15,000 GAL. TO LESS THAN 20,000 GAL) | $30.66 | $14.65 | $45.31 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (10,000 GAL. TO LESS THAN 15,000 GAL) | $30.59 | $14.65 | $45.24 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: WATER, FUEL & OIL TANK (1,200 GAL. TO LESS THAN 2,500 GAL) | $27.85 | $14.65 | $42.50 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: TRANSIT MIX (OVER 8 CU. YDS. TO 14 CU. YDS) | $29.72 | $14.65 | $44.37 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: TRANSIT MIX (0 CU. YDS. TO 8 CU. YDS) | $29.62 | $14.65 | $44.27 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: TIREMEN AND GREASER | $30.19 | $14.65 | $44.84 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: OIL SPREADER | $32.68 | $14.65 | $47.33 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: LOWBOY | $32.69 | $14.65 | $47.34 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (PICKUP TRUCK) | $29.18 | $14.65 | $43.83 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (LESS THAN 10 TONS) | $29.26 | $14.65 | $43.91 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (20 TONS AND OVER) | $29.69 | $14.65 | $44.34 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (15 TONS TO LESS THAN 20 TONS) | $29.53 | $14.65 | $44.18 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: FLAT RACK, BULK CEMENT, SEMI-TRAILERS, MUD/BANDING AND PAINT (10 TONS TO LESS THAN 15 TONS) | $29.42 | $14.65 | $44.07 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (LESS THAN 8 CU. YDS.) | $29.37 | $14.65 | $44.02 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (95 CU. YDS. TO LESS THAN 105 CU. YDS.) | $30.56 | $14.65 | $45.21 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (8 CU. YDS. TO LESS THAN 14 CU. YDS.) | $29.53 | $14.65 | $44.18 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (75 CU. YDS. TO LESS THAN 95 CU. YDS.) | $30.34 | $14.65 | $44.99 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (55 CU. YDS. TO LESS THAN 75 CU. YDS.) | $30.12 | $14.65 | $44.77 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (35 CU. YDS. TO LESS THAN 55 CU. YDS.) | $29.91 | $14.65 | $44.56 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (14 CU. YDS. TO LESS THAN 35 CU. YDS.) | $29.67 | $14.65 | $44.32 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: DUMP TRUCK, BOTTOM-END OR SIDE (105 CU. YDS. TO LESS THAN 130 CU. YDS.) | $30.69 | $14.65 | $45.34 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: CONCRETE PUMPING | $29.62 | $14.65 | $44.27 | TEAM0222-018 eff. 07/01/2024 |
| TRUCK DRIVER: ARTICULATED | $32.14 | $14.65 | $46.79 | TEAM0222-018 eff. 07/01/2024 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.