Utah prevailing wage rates: UT20260109
Highway construction in Utah County.
UT20260109, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER (EXCLUDES FORM WORK) | $32.17 | $17.50 | $49.67 | CARP0801-003 eff. 07/01/2024 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE | $31.99 | $17.64 | $49.63 | ENGI0003-018 eff. 07/01/2022 |
| POWER EQUIPMENT OPERATOR (OILER) | $31.99 | $17.64 | $49.63 | ENGI0003-018 eff. 07/01/2022 |
| TRUCK DRIVER: WATER TRUCK | $24.41 | $11.75 | $36.16 | SUUT2019-021 eff. 04/03/2023 |
| TRUCK DRIVER: VACTOR | $23.40 | $0.00 | $23.40 | SUUT2019-021 eff. 04/03/2023 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $26.17 | $11.27 | $37.44 | SUUT2019-021 eff. 04/03/2023 |
| TRUCK DRIVER: DUMP TRUCK | $24.41 | $12.16 | $36.57 | SUUT2019-021 eff. 04/03/2023 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $20.59 | $8.65 | $29.24 | SUUT2019-021 eff. 04/03/2023 |
| TRAFFIC CONTROL: FLAGGER | $12.58 EO 13658 minimum $13.65 may apply | $1.75 | $14.33 | SUUT2019-021 eff. 04/03/2023 |
| OPERATOR: PAVEMENT MARKING GRINDER | $27.95 | $7.05 | $35.00 | SUUT2019-021 eff. 04/03/2023 |
| OPERATOR: SCREED | $24.16 | $12.16 | $36.32 | SUUT2019-021 eff. 04/03/2023 |
| OPERATOR: ROLLER | $24.58 | $13.62 | $38.20 | SUUT2019-021 eff. 04/03/2023 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $26.91 | $12.75 | $39.66 | SUUT2019-021 eff. 04/03/2023 |
| OPERATOR: MILLING MACHINE | $25.37 | $15.65 | $41.02 | SUUT2019-021 eff. 04/03/2023 |
| OPERATOR: MECHANIC | $27.17 | $13.86 | $41.03 | SUUT2019-021 eff. 04/03/2023 |
| OPERATOR: LOADER | $24.85 | $12.74 | $37.59 | SUUT2019-021 eff. 04/03/2023 |
| OPERATOR: DRILL | $27.44 | $15.65 | $43.09 | SUUT2019-021 eff. 04/03/2023 |
| OPERATOR: CRANE | $30.66 | $10.61 | $41.27 | SUUT2019-021 eff. 04/03/2023 |
| OPERATOR: CONCRETE FINISHING MACHINE | $20.03 | $6.55 | $26.58 | SUUT2019-021 eff. 04/03/2023 |
| OPERATOR: BROOM/SWEEPER | $22.54 | $10.36 | $32.90 | SUUT2019-021 eff. 04/03/2023 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $23.97 | $10.06 | $34.03 | SUUT2019-021 eff. 04/03/2023 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $22.23 | $5.64 | $27.87 | SUUT2019-021 eff. 04/03/2023 |
| LABORER: PIPELAYER | $17.23 | $2.79 | $20.02 | SUUT2019-021 eff. 04/03/2023 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $13.46 EO 13658 minimum $13.65 may apply | $2.64 | $16.10 | SUUT2019-021 eff. 04/03/2023 |
| LABORER: LANDSCAPE | $15.40 | $2.53 | $17.93 | SUUT2019-021 eff. 04/03/2023 |
| LABORER: COMMON OR GENERAL | $20.15 | $7.28 | $27.43 | SUUT2019-021 eff. 04/03/2023 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $24.09 | $5.66 | $29.75 | SUUT2019-021 eff. 04/03/2023 |
| IRONWORKER, REINFORCING | $26.61 | $13.76 | $40.37 | SUUT2019-021 eff. 04/03/2023 |
| INSTALLER - SIGN | $14.76 | $2.53 | $17.29 | SUUT2019-021 eff. 04/03/2023 |
| INSTALLER - GUARDRAIL | $14.80 | $2.66 | $17.46 | SUUT2019-021 eff. 04/03/2023 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $17.78 | $2.53 | $20.31 | SUUT2019-021 eff. 04/03/2023 |
| FENCE ERECTOR | $15.16 | $2.53 | $17.69 | SUUT2019-021 eff. 04/03/2023 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING | $27.45 | $2.30 | $29.75 | SUUT2019-021 eff. 04/03/2023 |
| CEMENT MASON/CONCRETE FINISHER | $20.59 | $2.41 | $23.00 | SUUT2019-021 eff. 04/03/2023 |
| CARPENTER (FORM WORK ONLY) | $22.59 | $5.41 | $28.00 | SUUT2019-021 eff. 04/03/2023 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.