Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION | $36.85 | $14.13 | $50.98 | ELEC0080-011 eff. 06/01/2025 |
| TRUCK DRIVER: MULTI AXLE | $18.17 | $0.00 | $18.17 | SUVA2016-060 eff. 07/02/2018 |
| TRUCK DRIVER: HEAVY OVER 7 CY | $17.74 | $0.00 | $17.74 | SUVA2016-060 eff. 07/02/2018 |
| TRUCK DRIVER: FUEL AND LUBRICANT SERVICE | $18.25 | $0.00 | $18.25 | SUVA2016-060 eff. 07/02/2018 |
| TRUCK DRIVER: 1/SINGLE AXLE TRUCK | $17.34 | $0.00 | $17.34 | SUVA2016-060 eff. 07/02/2018 |
| TRUCK DRIVER : HEAVY 7CY & UNDER | $15.36 | $0.00 | $15.36 | SUVA2016-060 eff. 07/02/2018 |
| TRAFFIC CONTROL: FLAGGER | $10.22 EO 13658 minimum $13.65 may apply | $0.00 | $10.22 | SUVA2016-060 eff. 07/02/2018 |
| PAVEMENT MARKING TRUCK DRIVER | $18.83 | $0.00 | $18.83 | SUVA2016-060 eff. 07/02/2018 |
| OPERATOR: BULLDOZER, INCLUDING UTILITY | $19.26 | $0.00 | $19.26 | SUVA2016-060 eff. 07/02/2018 |
| OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR | $16.51 | $0.00 | $16.51 | SUVA2016-060 eff. 07/02/2018 |
| OPERATOR: SCREED | $22.13 | $4.89 | $27.02 | SUVA2016-060 eff. 07/02/2018 |
| OPERATOR: ROLLER | $17.49 | $0.00 | $17.49 | SUVA2016-060 eff. 07/02/2018 |
| OPERATOR: PILEDRIVER | $21.83 | $4.08 | $25.91 | SUVA2016-060 eff. 07/02/2018 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $18.00 | $0.00 | $18.00 | SUVA2016-060 eff. 07/02/2018 |
| OPERATOR: MILLING MACHINE | $23.12 | $3.60 | $26.72 | SUVA2016-060 eff. 07/02/2018 |
| OPERATOR: MECHANIC | $20.60 | $0.00 | $20.60 | SUVA2016-060 eff. 07/02/2018 |
| OPERATOR: LOADER | $18.39 | $0.00 | $18.39 | SUVA2016-060 eff. 07/02/2018 |
| OPERATOR: HYDROSEEDER | $16.64 | $0.00 | $16.64 | SUVA2016-060 eff. 07/02/2018 |
| OPERATOR: GRADER/BLADE | $26.13 | $0.00 | $26.13 | SUVA2016-060 eff. 07/02/2018 |
| OPERATOR: GRADALL | $18.65 | $0.00 | $18.65 | SUVA2016-060 eff. 07/02/2018 |
| OPERATOR: DRILL | $24.66 | $0.00 | $24.66 | SUVA2016-060 eff. 07/02/2018 |
| OPERATOR: CRANE | $25.82 | $0.00 | $25.82 | SUVA2016-060 eff. 07/02/2018 |
| OPERATOR: BROOM/SWEEPER | $14.32 | $0.25 | $14.57 | SUVA2016-060 eff. 07/02/2018 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.16 | $4.45 | $23.61 | SUVA2016-060 eff. 07/02/2018 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.05 | $0.00 | $20.05 | SUVA2016-060 eff. 07/02/2018 |
| LABORER: POWER TOOL OPERATOR | $15.69 | $0.00 | $15.69 | SUVA2016-060 eff. 07/02/2018 |
| LABORER: PIPELAYER | $15.11 | $0.00 | $15.11 | SUVA2016-060 eff. 07/02/2018 |
| LABORER: GRADE CHECKER | $15.07 | $0.00 | $15.07 | SUVA2016-060 eff. 07/02/2018 |
| LABORER: COMMON OR GENERAL | $13.59 EO 13658 minimum $13.65 may apply | $0.00 | $13.59 | SUVA2016-060 eff. 07/02/2018 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $15.92 | $0.00 | $15.92 | SUVA2016-060 eff. 07/02/2018 |
| IRONWORKER, STRUCTURAL | $27.38 | $0.00 | $27.38 | SUVA2016-060 eff. 07/02/2018 |
| IRONWORKER, REINFORCING | $22.71 | $0.00 | $22.71 | SUVA2016-060 eff. 07/02/2018 |
| CEMENT MASON/CONCRETE FINISHER | $19.94 | $0.00 | $19.94 | SUVA2016-060 eff. 07/02/2018 |
| CARPENTER, INCLUDES FORM WORK | $17.20 | $0.00 | $17.20 | SUVA2016-060 eff. 07/02/2018 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.