Virginia prevailing wage rates: VA20260155
Building construction in Henrico, Richmond* Counties.
VA20260155, modification 2, published 10/15/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
We do not have the previous modification on file, so changes are not listed. Rate groups marked “changed” in the table were flagged by the Department of Labor in this modification.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)Scope and notes(ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING PAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY.) | $40.77 | $20.17 | $60.94 | ASBE0024-006 eff. 10/01/2024 |
| BOILERMAKER | $38.97 | $27.39 | $66.36 | BOIL0045-003 eff. 01/01/2025 |
| ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING) | $37.95 | $18.02 | $55.97 | ELEC0666-004 eff. 03/01/2025 |
ELEVATOR MECHANICScope and notes(ADDITIONAL FRINGE BENEFITS INCLUDE THE FOLLOWING A) PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY AND B) VACATIONS: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OR 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT.) | $51.39 | $38.44 | $89.83 | ELEV0051-007 eff. 01/01/2025 |
| POWER EQUIPMENT OPERATOR: CRANES 90 TONS & OVER CAPACITY; TOWER & CLIMBING CRANES WITH CONTROLS 100 FT. ABOVE GROUND | $40.99 | $18.05 | $59.04 | ENGI0147-019 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: CRANES UNDER 90 TONS | $39.99 | $18.05 | $58.04 | ENGI0147-019 eff. 06/01/2025 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | $31.00 | $18.28 | $49.28 | IRON0028-007 eff. 05/01/2024 |
| PIPEFITTER (INCLUDES HVAC PIPE, UNIT AND TEMPERATURE CONTROLS INSTALLATIONS) | $33.25 | $19.47 | $52.72 | PLUM0010-003 eff. 09/01/2023 |
| PLUMBER | $33.25 | $19.47 | $52.72 | PLUM0010-003 eff. 09/01/2023 |
| BRICKLAYER | $20.00 | $1.00 | $21.00 | SUVA2013-038 eff. 01/11/2016 |
| CARPENTER | $21.10 | $1.11 | $22.21 | SUVA2013-038 eff. 01/11/2016 |
| CEMENT MASON/CONCRETE FINISHER | $17.23 | $0.00 | $17.23 | SUVA2013-038 eff. 01/11/2016 |
| GLAZIER | $18.43 | $3.71 | $22.14 | SUVA2013-038 eff. 01/11/2016 |
| HVAC MECHANIC (HVAC DUCT INSTALLATION ONLY) | $20.60 | $2.93 | $23.53 | SUVA2013-038 eff. 01/11/2016 |
| IRONWORKER: REINFORCING | $27.18 | $4.13 | $31.31 | SUVA2013-038 eff. 01/11/2016 |
| LABORER: COMMON OR GENERAL | $11.88 EO 13658 minimum $13.65 may apply | $1.58 | $13.46 | SUVA2013-038 eff. 01/11/2016 |
| LABORER: MASON TENDER - BRICK | $13.41 EO 13658 minimum $13.65 may apply | $3.15 | $16.56 | SUVA2013-038 eff. 01/11/2016 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.96 EO 13658 minimum $13.65 may apply | $3.12 | $16.08 | SUVA2013-038 eff. 01/11/2016 |
| LABORER: PIPELAYER | $12.28 EO 13658 minimum $13.65 may apply | $1.96 | $14.24 | SUVA2013-038 eff. 01/11/2016 |
| POWER EQUIPMENT OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.74 | $1.43 | $21.17 | SUVA2013-038 eff. 01/11/2016 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $18.95 | $4.03 | $22.98 | SUVA2013-038 eff. 01/11/2016 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $17.50 | $0.00 | $17.50 | SUVA2013-038 eff. 01/11/2016 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $19.40 | $7.00 | $26.40 | SUVA2013-038 eff. 01/11/2016 |
| POWER EQUIPMENT OPERATOR: LOADER | $21.28 | $3.17 | $24.45 | SUVA2013-038 eff. 01/11/2016 |
| POWER EQUIPMENT OPERATOR: ROLLER | $16.25 | $4.88 | $21.13 | SUVA2013-038 eff. 01/11/2016 |
| PAINTER: BRUSH AND ROLLER | $16.87 | $0.00 | $16.87 | SUVA2013-038 eff. 01/11/2016 |
| PAINTER: SPRAY | $16.58 | $0.00 | $16.58 | SUVA2013-038 eff. 01/11/2016 |
| ROOFER | $17.40 | $1.55 | $18.95 | SUVA2013-038 eff. 01/11/2016 |
| SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION) | $19.72 | $1.83 | $21.55 | SUVA2013-038 eff. 01/11/2016 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $20.50 | $2.93 | $23.43 | SUVA2013-038 eff. 01/11/2016 |
| TILE FINISHER | $23.40 | $0.00 | $23.40 | SUVA2013-038 eff. 01/11/2016 |
| TILE SETTER | $27.80 | $10.25 | $38.05 | SUVA2013-038 eff. 01/11/2016 |
| TRUCK DRIVER: DUMP TRUCK | $14.88 | $0.00 | $14.88 | SUVA2013-038 eff. 01/11/2016 |
| WATERPROOFER | $21.17 | $3.41 | $24.58 | SUVA2013-038 eff. 01/11/2016 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 2 published 10/15/2026. We format and check the official text; the determination in your contract is what applies.