Virginia prevailing wage rates: VA20260167
Building construction in Virginia Beach* County.
VA20260167, modification 2, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
No existing rate changed amount.
0 classifications added, 1 removed or reworded
- removed BRICKLAYER was $22.44 + $10.23 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) A.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MARTIN LUTHER KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY,THE DAY AFTER THANKSGIVING AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE REGULAR WORK DAY BEFORE AND AFTER THE PAID HOLIDAY | $40.77 | $20.17 | $60.94 | ASBE0024-006 eff. 10/01/2024 |
| BOILERMAKER | $38.97 | $27.39 | $66.36 | BOIL0045-003 eff. 01/01/2025 |
ELEVATOR MECHANIC A.Scope and notesPAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING DAY AND CHRISTMAS DAY. B. VACATIONS: 6% MEN UNDER 5 YEARS BASED ON REGULAR HOURLY RATE AND 8% MEN OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED | $52.06 | $38.44 | $90.50 | ELEV0052-005 eff. 01/01/2025 |
| POWER EQUIPMENT OPERATOR (CRANES UNDER 90 TONS) | $39.99 | $18.05 | $58.04 | ENGI0147-019 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR (CRANES 90 TONS & OVER CAPACITY; TOWER & CLIMBING CRANES WITH CONTROLS 100 FT. ABOVE GROUND) | $40.99 | $18.05 | $59.04 | ENGI0147-019 eff. 06/01/2025 |
| IRONWORKER, RIGGER | $30.22 | $17.56 | $47.78 | IRON0028-006 eff. 05/01/2023 |
| IRONWORKER: STRUCTURAL AND ORNAMENTAL | $31.00 | $18.28 | $49.28 | IRON0028-007 eff. 05/01/2024 |
| PLUMBER | $36.92 | $18.25 | $55.17 | PLUM0110-008 eff. 11/01/2025 |
| PIPEFITTER (INCLUDES HVAC PIPE, UNIT AND TEMPERATURE CONTROLS INSTALLATIONS) | $36.92 | $18.25 | $55.17 | PLUM0110-008 eff. 11/01/2025 |
| TRUCK DRIVER: DUMP TRUCK | $15.50 | $0.75 | $16.25 | SUVA2013-052 eff. 01/11/2016 |
| TILE SETTER | $27.80 | $10.25 | $38.05 | SUVA2013-052 eff. 01/11/2016 |
| TILE FINISHER | $23.40 | $0.00 | $23.40 | SUVA2013-052 eff. 01/11/2016 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $18.91 | $4.67 | $23.58 | SUVA2013-052 eff. 01/11/2016 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $19.24 | $2.80 | $22.04 | SUVA2013-052 eff. 01/11/2016 |
| ROOFER | $17.50 | $2.20 | $19.70 | SUVA2013-052 eff. 01/11/2016 |
| PAINTER: SPRAY | $18.10 | $5.43 | $23.53 | SUVA2013-052 eff. 01/11/2016 |
| PAINTER (BRUSH AND ROLLER) | $18.00 | $0.00 | $18.00 | SUVA2013-052 eff. 01/11/2016 |
| OPERATOR: ROLLER | $16.25 | $4.88 | $21.13 | SUVA2013-052 eff. 01/11/2016 |
| OPERATOR: LOADER | $21.28 | $3.17 | $24.45 | SUVA2013-052 eff. 01/11/2016 |
| OPERATOR: FORKLIFT | $19.40 | $7.00 | $26.40 | SUVA2013-052 eff. 01/11/2016 |
| OPERATOR: BULLDOZER | $18.07 | $3.50 | $21.57 | SUVA2013-052 eff. 01/11/2016 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $18.95 | $4.03 | $22.98 | SUVA2013-052 eff. 01/11/2016 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.25 | $2.72 | $21.97 | SUVA2013-052 eff. 01/11/2016 |
| LABORER: COMMON OR GENERAL, INCLUDING DEMOLITION | $12.90 EO 13658 minimum $13.65 may apply | $0.96 | $13.86 | SUVA2013-052 eff. 01/11/2016 |
| LABORER: PIPELAYER | $12.40 EO 13658 minimum $13.65 may apply | $1.96 | $14.36 | SUVA2013-052 eff. 01/11/2016 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $12.96 EO 13658 minimum $13.65 may apply | $3.12 | $16.08 | SUVA2013-052 eff. 01/11/2016 |
| LABORER: MASON TENDER - BRICK | $13.48 EO 13658 minimum $13.65 may apply | $3.27 | $16.75 | SUVA2013-052 eff. 01/11/2016 |
| IRONWORKER, REINFORCING | $27.18 | $4.13 | $31.31 | SUVA2013-052 eff. 01/11/2016 |
| GLAZIER | $19.36 | $4.68 | $24.04 | SUVA2013-052 eff. 01/11/2016 |
| ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING AND ALARM INSTALLATION | $22.94 | $1.94 | $24.88 | SUVA2013-052 eff. 01/11/2016 |
| CEMENT MASON/CONCRETE FINISHER | $17.13 | $0.00 | $17.13 | SUVA2013-052 eff. 01/11/2016 |
| CAULKER | $18.49 | $1.33 | $19.82 | SUVA2013-052 eff. 01/11/2016 |
| CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK | $17.93 | $4.41 | $22.34 | SUVA2013-052 eff. 01/11/2016 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.