Virginia prevailing wage rates: VA20260179
Highway construction in Loudoun County.
VA20260179, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ELECTRICIAN, INCLUDES TRAFFIC SIGNALIZATION | $36.85 | $14.13 | $50.98 | ELEC0080-011 eff. 06/01/2025 |
| TRUCK DRIVER: MULTI AXLE | $20.11 | $0.00 | $20.11 | SUVA2016-064 eff. 07/02/2018 |
| TRUCK DRIVER: HEAVY OVER 7 CY | $18.05 | $0.00 | $18.05 | SUVA2016-064 eff. 07/02/2018 |
| TRUCK DRIVER: FUEL AND LUBRICANT SERVICE | $18.25 | $0.00 | $18.25 | SUVA2016-064 eff. 07/02/2018 |
| TRUCK DRIVER: 1/SINGLE AXLE TRUCK | $19.22 | $0.00 | $19.22 | SUVA2016-064 eff. 07/02/2018 |
| TRUCK DRIVER : HEAVY 7CY & UNDER | $15.53 | $0.00 | $15.53 | SUVA2016-064 eff. 07/02/2018 |
| TRAFFIC CONTROL: FLAGGER | $13.64 EO 13658 minimum $13.65 may apply | $0.00 | $13.64 | SUVA2016-064 eff. 07/02/2018 |
| PAVEMENT MARKING TRUCK DRIVER | $18.78 | $0.00 | $18.78 | SUVA2016-064 eff. 07/02/2018 |
| PAVEMENT MARKING OPERATOR | $22.15 | $0.00 | $22.15 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: BULLDOZER, INCLUDING UTILITY | $20.64 | $0.00 | $20.64 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: ASPHALT SPREADER AND DISTRIBUTOR | $20.58 | $2.31 | $22.89 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: SCREED | $22.13 | $4.89 | $27.02 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: ROLLER (FINISHING) | $18.73 | $3.23 | $21.96 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: ROLLER | $18.92 | $0.00 | $18.92 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: PILEDRIVER | $21.83 | $4.08 | $25.91 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.47 | $0.00 | $23.47 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: PAVEMENT PLANER GROUNDSMEN | $19.75 | $0.00 | $19.75 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: PAVEMENT PLANER | $21.14 | $0.00 | $21.14 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: MILLING MACHINE | $23.19 | $2.94 | $26.13 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: MECHANIC | $22.84 | $0.00 | $22.84 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: LOADER | $19.00 | $0.00 | $19.00 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: HYDROSEEDER | $16.64 | $0.00 | $16.64 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: GRADER/BLADE | $23.21 | $0.00 | $23.21 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: GRADALL | $19.26 | $0.00 | $19.26 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: DRILL | $24.89 | $0.00 | $24.89 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: CRANE | $29.46 | $0.00 | $29.46 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: BROOM/SWEEPER | $17.40 | $2.01 | $19.41 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $19.00 | $3.49 | $22.49 | SUVA2016-064 eff. 07/02/2018 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $28.28 | $0.00 | $28.28 | SUVA2016-064 eff. 07/02/2018 |
| LABORER: POWER TOOL OPERATOR | $15.69 | $0.00 | $15.69 | SUVA2016-064 eff. 07/02/2018 |
| LABORER: PIPELAYER | $20.44 | $0.00 | $20.44 | SUVA2016-064 eff. 07/02/2018 |
| LABORER: GRADE CHECKER | $14.88 | $0.00 | $14.88 | SUVA2016-064 eff. 07/02/2018 |
| LABORER: COMMON OR GENERAL | $16.35 | $0.00 | $16.35 | SUVA2016-064 eff. 07/02/2018 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $18.00 | $0.00 | $18.00 | SUVA2016-064 eff. 07/02/2018 |
| IRONWORKER, STRUCTURAL | $34.18 | $0.00 | $34.18 | SUVA2016-064 eff. 07/02/2018 |
| IRONWORKER, REINFORCING | $34.18 | $0.00 | $34.18 | SUVA2016-064 eff. 07/02/2018 |
| FENCE ERECTOR | $15.28 | $0.00 | $15.28 | SUVA2016-064 eff. 07/02/2018 |
| CEMENT MASON/CONCRETE FINISHER | $21.64 | $0.00 | $21.64 | SUVA2016-064 eff. 07/02/2018 |
| CARPENTER, INCLUDES FORM WORK | $20.97 | $0.00 | $20.97 | SUVA2016-064 eff. 07/02/2018 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.