Washington prevailing wage rates: WA20260026
Building construction in Grant County.
WA20260026, modification 2, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| BRICKLAYER | $33.95 | $19.33 | $53.28 | BRWA0003-002 eff. 06/01/2021 |
| TILE SETTER | $29.86 | $13.95 | $43.81 | BRWA0003-009 eff. 06/01/2021 |
| CARPENTER (INCLUDING DRYWALL HANGING AND FORM WORK) | $44.21 | $17.28 | $61.49 | CARP0059-022 eff. 06/01/2025 |
| ELECTRICIAN | $46.15 | $26.10 | $72.25 | ELEC0191-015 eff. 06/01/2020 |
| POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) | $45.36 | $23.40 | $68.76 | ENGI0302-132 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.) | $43.39 | $23.40 | $66.79 | ENGI0302-132 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC | $43.05 | $23.40 | $66.45 | ENGI0302-132 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER) | $42.71 | $23.40 | $66.11 | ENGI0302-132 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T) | $42.51 | $23.40 | $65.91 | ENGI0302-132 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT) | $42.31 | $23.40 | $65.71 | ENGI0302-132 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT | $41.56 | $23.40 | $64.96 | ENGI0302-132 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS | $41.17 | $23.40 | $64.57 | ENGI0302-132 eff. 06/01/2025 |
| IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL | $43.40 | $32.77 | $76.17 | IRON0014-012 eff. 07/07/2025 |
| LABORER, MASON TENDER BRICK | $38.05 | $16.75 | $54.80 | LABO0238-007 eff. 06/01/2025 |
| LABORER: A-2: GROUP 10 GRADE CHECKER | $43.21 | $16.90 | $60.11 | LABO0238-025 eff. 06/01/2025 |
| LABORER: A-2: GROUP 3 CEMENT/CONCRETE; PIPELAYER | $40.46 | $16.90 | $57.36 | LABO0238-025 eff. 06/01/2025 |
| LABORER: A-2: GROUP 2 COMMON OR GENERAL LABORER | $40.13 | $16.90 | $57.03 | LABO0238-025 eff. 06/01/2025 |
| PAINTER (BRUSH & SPRAY ONLY) | $33.95 | $15.65 | $49.60 | PAIN0427-004 eff. 07/01/2025 |
| CEMENT MASON/CONCRETE FINISHER: ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0 - 45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 | PLAS0072-008 eff. 06/01/2025 |
| PIPEFITTER | $65.20 | $34.91 | $100.11 | PLUM0598-018 eff. 06/01/2025 |
| ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) | $35.75 | $14.40 | $50.15 | ROOF0189-001 eff. 07/01/2025 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $44.30 | $28.58 | $72.88 | SFWA0699-005 eff. 04/01/2025 |
| SHEETMETAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $45.83 | $27.92 | $73.75 | SHEE0055-012 eff. 06/01/2025 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $23.50 | $6.87 | $30.37 | SUWA2002-006 eff. 06/18/2009 |
| PLUMBER | $35.00 | $0.00 | $35.00 | SUWA2002-006 eff. 06/18/2009 |
| PIPE INSULATOR/WRAPPER | $24.21 | $4.07 | $28.28 | SUWA2002-006 eff. 06/18/2009 |
| PAINTER: ROLLER | $22.06 | $2.72 | $24.78 | SUWA2002-006 eff. 06/18/2009 |
| PAINTER: DRYWALL FINISHING/TAPING | $25.17 | $4.41 | $29.58 | SUWA2002-006 eff. 06/18/2009 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $27.94 | $0.00 | $27.94 | SUWA2002-006 eff. 06/18/2009 |
| METAL BUILDING ERECTOR | $11.30 EO 13658 minimum $13.65 may apply | $3.58 | $14.88 | SUWA2002-006 eff. 06/18/2009 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.