Washington prevailing wage rates: WA20260028

Building construction in Island County.

WA20260028, modification 1, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 0

No existing rate changed amount.

9 classifications added, 10 removed or reworded
  • removed ELECTRICIAN: DOUGLAS, CHELAN, and OKANOGAN Counties was $46.15 + $26.10 fringe
  • added LABORER: ZONE 1: GROUP 4 PIPE LAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL $51.52 + $16.99 fringe
  • added LABORER: ZONE 1: GROUP 5 MASON TENDER-BRICK; MASON TENDER-CEMENT/CONCRETE; GRADE CHECKER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL $52.31 + $17.01 fringe
  • removed Laborers: GROUP 4 was $51.52 + $16.99 fringe
  • removed Laborers: GROUP 5 was $52.31 + $17.01 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 30 METRIC TONS TO 50 METRIC TONS; LOADER- OVERHEAD 6 YARDS TO, BUT NOT INCLUDING 8 YARDS; DOZER D-10 $60.67 + $27.57 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC TONS TO 90 METRIC TONS $61.56 + $27.57 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 90 METRIC TONS $62.47 + $27.57 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) $63.35 + $27.57 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 2 CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; LOADERS-OVERHEAD UNDER 6 YARDS; MECHANIC $59.88 + $27.57 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; DOZERS-D-9 AND UNDER; ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHMENTS $59.23 + $27.57 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS $55.43 + $27.57 fringe
  • removed Power equipment operators: Group 1 was $60.67 + $27.57 fringe
  • removed Power equipment operators: Group 1A was $61.56 + $27.57 fringe
  • removed Power equipment operators: Group 1AA was $62.47 + $27.57 fringe
  • removed Power equipment operators: Group 1AAA was $63.35 + $27.57 fringe
  • removed Power equipment operators: Group 2 was $59.88 + $27.57 fringe
  • removed Power equipment operators: Group 3 was $59.23 + $27.57 fringe
  • removed Power equipment operators: Group 4 was $55.43 + $27.57 fringe

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

WA20260028 wage rates
ClassificationBaseFringeTotalRate ID
ASBESTOS WORKER/HEAT & FROST INSULATOR (PIPE INSULATION)$75.37$18.82$94.19ASBE0007-003
eff. 06/01/2025
TILE SETTER$49.70$18.62$68.32BRWA0001-013
eff. 06/01/2025
TILE FINISHER$40.98$18.17$59.15BRWA0001-013
eff. 06/01/2025
BRICKLAYER$55.34$20.05$75.39BRWA0001-015
eff. 06/01/2025
MILLWRIGHT$55.39$22.38$77.77CARP0096-001
eff. 06/01/2025
CARPENTER (INCLUDES ACOUSTICAL CEILING MECHANIC, DRYWALL HANGER & FORM WORK)$63.98$19.13$83.11CARP0425-003
eff. 06/01/2025
ELECTRICIAN (ISLAND, SAN JUAN, SKAGIT, SNOHOMISH AND WHATCOM COUNTIES)$53.20$27.51$80.71ELEC0191-013
eff. 06/01/2022
POWER EQUIPMENT OPERATOR: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS$55.43$27.57$83.00ENGI0302-023
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; DOZERS-D-9 AND UNDER; ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHMENTS$59.23$27.57$86.80ENGI0302-023
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 2 CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; LOADERS-OVERHEAD UNDER 6 YARDS; MECHANIC$59.88$27.57$87.45ENGI0302-023
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS)$63.35$27.57$90.92ENGI0302-023
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 90 METRIC TONS$62.47$27.57$90.04ENGI0302-023
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC TONS TO 90 METRIC TONS$61.56$27.57$89.13ENGI0302-023
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 30 METRIC TONS TO 50 METRIC TONS; LOADER- OVERHEAD 6 YARDS TO, BUT NOT INCLUDING 8 YARDS; DOZER D-10$60.67$27.57$88.24ENGI0302-023
eff. 06/01/2025
IRONWORKER (REINFORCING, STRUCTURAL AND ORNAMENTAL)$57.94$34.52$92.46IRON0086-011
eff. 07/07/2025
LABORER: ZONE 1: GROUP 5 MASON TENDER-BRICK; MASON TENDER-CEMENT/CONCRETE; GRADE CHECKER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL$52.31$17.01$69.32LABO0292-004
eff. 06/01/2025
LABORER: ZONE 1: GROUP 4 PIPE LAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL$51.52$16.99$68.51LABO0292-004
eff. 06/01/2025
GLAZIER$61.14$23.76$84.90PAIN0188-001
eff. 07/01/2025
PAINTER (BRUSH AND ROLLER, EXCLUDES SPRAY AND DRYWALL FINISHING/TAPING)$41.24$14.70$55.94PAIN0300-004
eff. 07/01/2025
DRYWALL FINISHER/TAPER$53.59$23.65$77.24PAIN0364-001
eff. 07/01/2025
SOFT FLOOR LAYER (INCLUDING VINYL AND CARPET)$42.01$20.20$62.21PAIN1238-002
eff. 07/01/2025
CEMENT MASON/CONCRETE FINISHER$54.16$21.27$75.43PLAS0528-004
eff. 06/01/2024
PIPEFITTER$60.72$34.15$94.87PLUM0026-014
eff. 06/01/2025
ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS)$44.50$16.45$60.95ROOF0054-010
eff. 06/01/2023
SPRINKLER FITTER (FIRE SPRINKLERS)$68.89$33.80$102.69SFWA0699-002
eff. 07/01/2025
SHEETMETAL WORKER (HVAC DUCT WORK ONLY)$66.05$29.41$95.46SHEE0066-032
eff. 06/01/2025
TRUCK DRIVER: DUMP TRUCK$23.50$6.87$30.37SUWA2002-008
eff. 06/18/2009
SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION$24.83$0.00$24.83SUWA2002-008
eff. 06/18/2009
PLUMBER$35.00$0.00$35.00SUWA2002-008
eff. 06/18/2009
PAINTER: SPRAY$17.80$4.18$21.98SUWA2002-008
eff. 06/18/2009
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$27.94$0.00$27.94SUWA2002-008
eff. 06/18/2009
LABORER: COMMON OR GENERAL$17.75$4.23$21.98SUWA2002-008
eff. 06/18/2009

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.