Washington prevailing wage rates: WA20260030
Building construction in Kittitas County.
WA20260030, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
10 classifications added, 10 removed or reworded
- removed LABORER: GROUP 3 was $38.40 + $16.66 fringe
- removed LABORER: GROUP 4 was $39.26 + $16.68 fringe
- removed LABORER: GROUP 5 was $39.89 + $16.70 fringe
- added LABORER: ZONE 1: GROUP 3 GENERAL OR COMMON LABORER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL $38.40 + $16.66 fringe
- added LABORER: ZONE 1: GROUP 4 PIPE LAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL $39.26 + $16.68 fringe
- added LABORER: ZONE 1: GROUP 5 MASON TENDER-BRICK; MASON TENDER-CEMENT/CONCRETE; GRADE CHECKER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL $39.89 + $16.70 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 30 METRIC TONS TO 50 METRIC TONS; LOADER- OVERHEAD 6 YARDS TO, BUT NOT INCLUDING 8 YARDS; DOZER D-10 (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $60.67 + $27.57 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC TONS TO 90 METRIC TONS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $61.56 + $27.57 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 90 METRIC TONS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $62.47 + $27.57 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $63.35 + $27.57 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 2 CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; LOADERS-OVERHEAD UNDER 6 YARDS; MECHANIC (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.88 + $27.57 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; DOZERS-D-9 AND UNDER; ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHMENTS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.23 + $27.57 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $55.43 + $27.57 fringe
- removed Power equipment operators: Group 1 was $60.67 + $27.57 fringe
- removed Power equipment operators: Group 1A was $61.56 + $27.57 fringe
- removed Power equipment operators: Group 1AA was $62.47 + $27.57 fringe
- removed Power equipment operators: Group 1AAA was $63.35 + $27.57 fringe
- removed Power equipment operators: Group 2 was $59.88 + $27.57 fringe
- removed Power equipment operators: Group 3 was $59.23 + $27.57 fringe
- removed Power equipment operators: Group 4 was $55.43 + $27.57 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| BRICKLAYER | $33.95 | $19.33 | $53.28 | BRWA0003-001 eff. 06/01/2021 |
| TILE SETTER | $29.86 | $13.95 | $43.81 | BRWA0003-006 eff. 06/01/2021 |
| CARPENTER (INCLUDING DRYWALL HANGING AND FORM WORK) | $44.21 | $17.28 | $61.49 | CARP0059-022 eff. 06/01/2025 |
| ELECTRICIAN | $60.00 | $27.78 | $87.78 | ELEC0112-014 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $55.43 | $27.57 | $83.00 | ENGI0302-022 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; DOZERS-D-9 AND UNDER; ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHMENTS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.23 | $27.57 | $86.80 | ENGI0302-022 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 2 CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; LOADERS-OVERHEAD UNDER 6 YARDS; MECHANIC (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 | $87.45 | ENGI0302-022 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 30 METRIC TONS TO 50 METRIC TONS; LOADER- OVERHEAD 6 YARDS TO, BUT NOT INCLUDING 8 YARDS; DOZER D-10 (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $60.67 | $27.57 | $88.24 | ENGI0302-022 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $63.35 | $27.57 | $90.92 | ENGI0302-022 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 90 METRIC TONS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $62.47 | $27.57 | $90.04 | ENGI0302-022 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC TONS TO 90 METRIC TONS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $61.56 | $27.57 | $89.13 | ENGI0302-022 eff. 06/01/2025 |
| IRONWORKER (REINFORCING, STRUCTURAL AND ORNAMENTAL) | $43.40 | $32.77 | $76.17 | IRON0086-001 eff. 07/07/2025 |
| LABORER: ZONE 1: GROUP 5 MASON TENDER-BRICK; MASON TENDER-CEMENT/CONCRETE; GRADE CHECKER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | $39.89 | $16.70 | $56.59 | LABO0348-007 eff. 06/01/2025 |
| LABORER: ZONE 1: GROUP 4 PIPE LAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | $39.26 | $16.68 | $55.94 | LABO0348-007 eff. 06/01/2025 |
| LABORER: ZONE 1: GROUP 3 GENERAL OR COMMON LABORER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | $38.40 | $16.66 | $55.06 | LABO0348-007 eff. 06/01/2025 |
| PAINTER (BRUSH & SPRAY ONLY) | $33.95 | $15.65 | $49.60 | PAIN0427-004 eff. 07/01/2025 |
| CEMENT MASON/CONCRETE FINISHER: ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0 - 45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 | $59.53 | PLAS0072-008 eff. 06/01/2025 |
| PIPEFITTER (KITTITAS (NORTHERN TIP) COUNTY) | $75.21 | $33.88 | $109.09 | PLUM0032-001 eff. 06/01/2025 |
| PIPEFITTER (KITTITAS (ALL BUT NORTHERN TIP)) | $65.20 | $34.91 | $100.11 | PLUM0598-002 eff. 06/01/2025 |
| ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) | $35.64 | $14.89 | $50.53 | ROOF0189-004 eff. 07/01/2025 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $44.13 | $26.40 | $70.53 | SFWA0699-006 eff. 01/01/2023 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT INSTALLATION) | $50.00 | $28.41 | $78.41 | SHEE0055-013 eff. 06/01/2025 |
| TRUCK DRIVER | $23.50 | $6.87 | $30.37 | SUWA2002-010 eff. 06/18/2009 |
| PLUMBER | $35.00 | $0.00 | $35.00 | SUWA2002-010 eff. 06/18/2009 |
| PIPE INSULATOR/WRAPPER | $24.21 | $4.07 | $28.28 | SUWA2002-010 eff. 06/18/2009 |
| PAINTER: ROLLER | $22.06 | $2.72 | $24.78 | SUWA2002-010 eff. 06/18/2009 |
| PAINTER: DRYWALL FINISHING/TAPING | $25.17 | $4.41 | $29.58 | SUWA2002-010 eff. 06/18/2009 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $27.94 | $0.00 | $27.94 | SUWA2002-010 eff. 06/18/2009 |
| METAL BUILDING ERECTOR | $11.30 EO 13658 minimum $13.65 may apply | $3.58 | $14.88 | SUWA2002-010 eff. 06/18/2009 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.