Washington prevailing wage rates: WA20260032
Building construction in Lewis County.
WA20260032, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
10 classifications added, 10 removed or reworded
- removed LABORER: GROUP 3 was $50.38 + $16.96 fringe
- removed LABORER: GROUP 4 was $51.52 + $16.99 fringe
- removed LABORER: GROUP 5 was $52.31 + $17.01 fringe
- added LABORER: ZONE 1: GROUP 3 GENERAL OR COMMON LABORER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL $50.38 + $16.96 fringe
- added LABORER: ZONE 1: GROUP 4 PIPE LAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL $51.52 + $16.99 fringe
- added LABORER: ZONE 1: GROUP 5 MASON TENDER-BRICK; MASON TENDER-CEMENT/CONCRETE; GRADE CHECKER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL $52.31 + $17.01 fringe
- removed POWER EQUIPMENT OPERATOR: GROUP 1 was $60.32 + $27.32 fringe
- removed POWER EQUIPMENT OPERATOR: GROUP 1A was $61.22 + $27.32 fringe
- removed POWER EQUIPMENT OPERATOR: GROUP 1AA was $62.12 + $27.32 fringe
- removed POWER EQUIPMENT OPERATOR: GROUP 1AAA was $62.99 + $27.32 fringe
- removed POWER EQUIPMENT OPERATOR: GROUP 2 was $59.56 + $27.32 fringe
- removed POWER EQUIPMENT OPERATOR: GROUP 3 was $58.89 + $27.32 fringe
- removed POWER EQUIPMENT OPERATOR: GROUP 4 was $55.13 + $27.32 fringe
- added POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOE: OVER 30 METRIC TONS TO 50 METRIC TONS; DOZER-D-10; LOADERS- 6 YARDS TO, BUT NOT INCLUDING, 8 YARDS ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR $60.32 + $27.32 fringe
- added POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOE: OVER 50 METRIC TONS TO 90 METRIC TONS; LOADERS-8 YARDS AND OVER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR $61.22 + $27.32 fringe
- added POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOE: OVER 90 METRIC TONS ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR $62.12 + $27.32 fringe
- added POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR $62.99 + $27.32 fringe
- added POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 2 CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; MECHANIC; LOADER- UNDER 6 YARDS ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR $59.56 + $27.32 fringe
- added POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHMENTS; OUTSIDE HOIST (ELEVATORS AND MANLIFTS); DOZER-D-9 AND UNDER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR $58.89 + $27.32 fringe
- added POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR $55.13 + $27.32 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (PIPE INSULATION) | $75.37 | $18.82 | $94.19 | ASBE0007-005 eff. 06/01/2025 |
| TILE SETTER | $49.70 | $18.62 | $68.32 | BRWA0001-007 eff. 06/01/2025 |
| BRICKLAYER | $55.34 | $20.05 | $75.39 | BRWA0001-015 eff. 06/01/2025 |
| CARPENTER (INCLUDING FORMWORK AND DRYWALL HANGING) | $63.98 | $19.13 | $83.11 | CARP0360-011 eff. 06/01/2025 |
| ELECTRICIAN | $65.14 | $26.56 | $91.70 | ELEC0076-005 eff. 08/31/2025 |
| POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | $55.13 | $27.32 | $82.45 | ENGI0612-018 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHMENTS; OUTSIDE HOIST (ELEVATORS AND MANLIFTS); DOZER-D-9 AND UNDER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | $58.89 | $27.32 | $86.21 | ENGI0612-018 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 2 CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; MECHANIC; LOADER- UNDER 6 YARDS ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | $59.56 | $27.32 | $86.88 | ENGI0612-018 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | $62.99 | $27.32 | $90.31 | ENGI0612-018 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOE: OVER 90 METRIC TONS ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | $62.12 | $27.32 | $89.44 | ENGI0612-018 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOE: OVER 30 METRIC TONS TO 50 METRIC TONS; DOZER-D-10; LOADERS- 6 YARDS TO, BUT NOT INCLUDING, 8 YARDS ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | $60.32 | $27.32 | $87.64 | ENGI0612-018 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: ZONE 1: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOE: OVER 50 METRIC TONS TO 90 METRIC TONS; LOADERS-8 YARDS AND OVER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 (26-45 RADIUS MILES) = $1.00 ZONE 3 (OVER 45 RADIUS MILES) - $1.30 BASEPOINTS: CENTRALIA, OLYMPIA, TACOMA HANDLING OF HAZARDOUS WASTE MATERIALS: PERSONNEL IN ALL CRAFT CLASSIFICATIONS SUBJECT TO WORKING INSIDE A FEDERALLY DESIGNATED HAZARDOUS PERIMETER SHALL BE ELGIBLE FOR COMPENSATION IN ACCORDANCE WITH THE FOLLOWING GROUP SCHEDULE RELATIVE TO THE LEVEL OF HAZARDOUS WASTE AS OUTLINED IN THE SPECIFIC HAZARDOUS WASTE PROJECT SITE SAFETY PLAN. H-1 BASE WAGE RATE WHEN ON A HAZARDOUS WASTE SITE WHEN NOT OUTFITTED WITH PROTECTIVE CLOTHING, CLASS "D" SUIT - BASE WAGE RATE PLUS $0.50 PER HOUR. H-2 CLASS "C" SUIT - BASE WAGE RATE PLUS $1.00 PER HOUR. H-3 CLASS "B" SUIT - BASE WAGE RATE PLUS $1.50 PER HOUR. H-4 CLASS "A" SUIT - BASE WAGE RATE PLUS $2.00 PER HOUR | $61.22 | $27.32 | $88.54 | ENGI0612-018 eff. 06/01/2025 |
| IRONWORKER (REINFORCING, STRUCTURAL AND ORNAMENTAL) | $57.94 | $34.52 | $92.46 | IRON0086-003 eff. 07/07/2025 |
| LABORER: ZONE 1: GROUP 5 MASON TENDER-BRICK; MASON TENDER-CEMENT/CONCRETE; GRADE CHECKER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | $52.31 | $17.01 | $69.32 | LABO0252-008 eff. 06/01/2025 |
| LABORER: ZONE 1: GROUP 4 PIPE LAYER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | $51.52 | $16.99 | $68.51 | LABO0252-008 eff. 06/01/2025 |
| LABORER: ZONE 1: GROUP 3 GENERAL OR COMMON LABORER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $1.00 ZONE 3 - $1.30 BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON ZONE 1 - PROJECTS WITHIN 25 RADIUS MILES OF THE RESPECTIVE CITY HALL ZONE 2 - MORE THAN 25 BUT LESS THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL ZONE 3 - MORE THAN 45 RADIUS MILES FROM THE RESPECTIVE CITY HALL | $50.38 | $16.96 | $67.34 | LABO0252-008 eff. 06/01/2025 |
| PAINTER (BRUSH AND ROLLER, EXCLUDES SPRAY) | $41.24 | $14.70 | $55.94 | PAIN0300-006 eff. 07/01/2025 |
| SOFT FLOOR LAYER (INCLUDING VINYL AND CARPET) | $42.01 | $20.20 | $62.21 | PAIN1238-002 eff. 07/01/2025 |
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 | $75.43 | PLAS0528-004 eff. 06/01/2024 |
| PIPEFITTER | $60.72 | $34.15 | $94.87 | PLUM0026-010 eff. 06/01/2025 |
| ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS) | $47.98 | $16.47 | $64.45 | ROOF0153-001 eff. 06/01/2024 |
| SHEET METAL WORKER (INCLUDING HVAC DUCT WORK) | $69.86 | $33.39 | $103.25 | SHEE0066-017 eff. 06/01/2025 |
| TRUCK DRIVER, INCLUDES DUMP TRUCK | $23.50 | $6.87 | $30.37 | SUWA2002-012 eff. 06/18/2009 |
| PLUMBER | $35.00 | $0.00 | $35.00 | SUWA2002-012 eff. 06/18/2009 |
| PAINTER: SPRAY | $17.80 | $4.18 | $21.98 | SUWA2002-012 eff. 06/18/2009 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $27.94 | $0.00 | $27.94 | SUWA2002-012 eff. 06/18/2009 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.