WA20260035, modification 2, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 1

No existing rate changed amount.

7 classifications added, 7 removed or reworded
  • added POWER EQUIPMENT OPERATOR: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 30 METRIC TONS TO 50 METRIC TONS; LOADER- OVERHEAD 6 YARDS TO, BUT NOT INCLUDING 8 YARDS; DOZER D-10 (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $60.67 + $27.57 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC TONS TO 90 METRIC TONS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $61.56 + $27.57 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 90 METRIC TONS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $62.47 + $27.57 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $63.35 + $27.57 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 2 CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; LOADERS-OVERHEAD UNDER 6 YARDS; MECHANIC (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.88 + $27.57 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; DOZERS-D-9 AND UNDER; ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHMENTS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $59.23 + $27.57 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) $55.43 + $27.57 fringe
  • removed Power equipment operators: Group 1 was $60.67 + $27.57 fringe
  • removed Power equipment operators: Group 1A was $61.56 + $27.57 fringe
  • removed Power equipment operators: Group 1AA was $62.47 + $27.57 fringe
  • removed Power equipment operators: Group 1AAA was $63.35 + $27.57 fringe
  • removed Power equipment operators: Group 2 was $59.88 + $27.57 fringe
  • removed Power equipment operators: Group 3 was $59.23 + $27.57 fringe
  • removed Power equipment operators: Group 4 was $55.43 + $27.57 fringe

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

WA20260035 wage rates
ClassificationBaseFringeTotalRate ID
BRICKLAYER$33.95$19.33$53.28BRWA0003-002
eff. 06/01/2021
TILE SETTER$29.86$13.95$43.81BRWA0003-009
eff. 06/01/2021
CARPENTER (DRYWALL HANGING AND FORM WORK ONLY)$44.21$17.28$61.49CARP0059-023
eff. 06/01/2025
ELECTRICIAN$46.15$26.10$72.25ELEC0191-015
eff. 06/01/2020
POWER EQUIPMENT OPERATOR: GROUP 4 ROLLER-OTHER THAN PLANT MIX; FORKLIFT: UNDER 3000 LBS WITH ATTACHMENTS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$55.43$27.57$83.00ENGI0302-022
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 3 CRANES-THRU 19 TONS WITH ATTACHMENTS; DOZERS-D-9 AND UNDER; ROLLER-PLANT MIX; EXCAVATOR/TRACKHOE, BACKHOE: UNDER 15 METRIC TONS; FORKLIFT: 3000 LBS AND OVER WITH ATTACHMENTS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$59.23$27.57$86.80ENGI0302-022
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 2 CRANES, 20 TONS THRU 44 TONS WITH ATTACHMENTS; EXCAVATOR/TRACKHOE, BACKHOE: 15 TO 30 METRIC TONS; LOADERS-OVERHEAD UNDER 6 YARDS; MECHANIC (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$59.88$27.57$87.45ENGI0302-022
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 1 CRANES 45 TONS THRU 99 TONS, UNDER 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 30 METRIC TONS TO 50 METRIC TONS; LOADER- OVERHEAD 6 YARDS TO, BUT NOT INCLUDING 8 YARDS; DOZER D-10 (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$60.67$27.57$88.24ENGI0302-022
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 1AAA CRANES-OVER 300 TONS, OR 300 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS) (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$63.35$27.57$90.92ENGI0302-022
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 1AA CRANES 200 TO 300 TONS, OR 250 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); EXCAVATOR/TRACKHOE, BACKHOES: OVER 90 METRIC TONS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$62.47$27.57$90.04ENGI0302-022
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 1A CRANES, 100 TONS THRU 199 TONS, OR 150 FT OF BOOM (INCLUDING JIB WITH ATTACHMENTS); LOADERS-OVERHEAD, 8 YARDS AND OVER; EXCAVATOR/TRACKHOE, BACKHOES: OVER 50 METRIC TONS TO 90 METRIC TONS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$61.56$27.57$89.13ENGI0302-022
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN)$45.36$23.40$68.76ENGI0302-135
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.) (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN)$43.39$23.40$66.79ENGI0302-135
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN)$43.05$23.40$66.45ENGI0302-135
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER) (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN)$42.71$23.40$66.11ENGI0302-135
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T) (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN)$42.51$23.40$65.91ENGI0302-135
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT) (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN)$42.31$23.40$65.71ENGI0302-135
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN)$41.56$23.40$64.96ENGI0302-135
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN)$41.17$23.40$64.57ENGI0302-135
eff. 06/01/2025
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL$43.40$32.77$76.17IRON0014-012
eff. 07/07/2025
LABORER, MASON TENDER BRICK$38.05$16.75$54.80LABO0238-007
eff. 06/01/2025
LABORER: A-2: GROUP 10 GRADE CHECKER$43.21$16.90$60.11LABO0238-025
eff. 06/01/2025
LABORER: A-2: GROUP 3 CEMENT/CONCRETE; PIPELAYER$40.46$16.90$57.36LABO0238-025
eff. 06/01/2025
LABORER: A-2: GROUP 2 COMMON OR GENERAL LABORER$40.13$16.90$57.03LABO0238-025
eff. 06/01/2025
PAINTER (BRUSH & SPRAY ONLY)$33.95$15.65$49.60PAIN0427-004
eff. 07/01/2025
CEMENT MASON/CONCRETE FINISHER: ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0 - 45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: 45 RADIUS MILES FROM THE MAIN POST OFFICE$40.89$18.64$59.53PLAS0072-008
eff. 06/01/2025
PIPEFITTER (OKANOGAN COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN)$75.21$33.88$109.09PLUM0032-004
eff. 06/01/2025
PIPEFITTER (OKANOGAN COUNTY WHICH LIES EAST OF THE 120TH MERIDIAN)$65.20$34.91$100.11PLUM0598-020
eff. 06/01/2025
ROOFER (INCLUDES ROOF TEAR OFF, WATERPROOFING, AND INSTALLATION OF METAL ROOFS)$35.75$14.40$50.15ROOF0189-001
eff. 07/01/2025
SPRINKLER FITTER (FIRE SPRINKLERS)$44.30$28.58$72.88SFWA0699-005
eff. 04/01/2025
SHEETMETAL WORKER (INCLUDING HVAC DUCT INSTALLATION)$45.83$27.92$73.75SHEE0055-012
eff. 06/01/2025
TRUCK DRIVER, INCLUDES DUMP TRUCK$23.50$6.87$30.37SUWA2002-015
eff. 06/18/2009
PLUMBER$35.00$0.00$35.00SUWA2002-015
eff. 06/18/2009
PIPE INSULATOR/WRAPPER$24.21$4.07$28.28SUWA2002-015
eff. 06/18/2009
PAINTER: ROLLER$22.06$2.72$24.78SUWA2002-015
eff. 06/18/2009
PAINTER: DRYWALL FINISHING/TAPING$25.17$4.41$29.58SUWA2002-015
eff. 06/18/2009
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$27.94$0.00$27.94SUWA2002-015
eff. 06/18/2009
METAL BUILDING ERECTOR$11.30
EO 13658 minimum $13.65 may apply
$3.58$14.88SUWA2002-015
eff. 06/18/2009
CARPENTER, EXCLUDES DRYWALL HANGING, AND FORM WORK$23.81$2.91$26.72SUWA2002-015
eff. 06/18/2009

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.