Washington prevailing wage rates: WA20260062
Heavy construction in Ferry, Garfield Counties.
WA20260062, modification 2, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
No existing rate changed amount.
8 classifications added, 9 removed or reworded
- removed GROUP 1 was $38.17 + $23.40 fringe
- removed GROUP 2 was $36.28 + $22.45 fringe
- removed GROUP 3 was $39.31 + $23.40 fringe
- removed GROUP 4 was $39.51 + $23.40 fringe
- removed GROUP 5 was $39.71 + $23.40 fringe
- removed GROUP 6 was $40.05 + $23.40 fringe
- removed GROUP 7 was $40.39 + $23.40 fringe
- removed GROUP 8 was $42.36 + $23.40 fringe
- removed POWER EQUIPMENT OPERATOR was $38.56 + $23.40 fringe
- added POWER EQUIPMENT OPERATOR: GARFIELD COUNTY $38.56 + $23.40 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS (GARFIELD COUNTY) $38.17 + $23.40 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT): (GARFIELD COUNTY) $39.31 + $23.40 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T); OILER; DRILL (CHURN, CORE, CALYX OR DIAMOND) (GARFIELD COUNTY) $39.51 + $23.40 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER); DRILLING EQUIPMENT (8 UNCH BIT AND OVER) (ROBBINS, REVERSE CIRCULATION AND SIMILAR); BOOM TRUCK (UNDER 25 TONS): (GARFIELD COUNTY) $39.71 + $23.40 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC: (GARFIELD COUNTY) $40.05 + $23.40 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.); GRADER/BLADE: (GARFIELD COUNTY) $40.39 + $23.40 fringe
- added POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER): (GARFIELD COUNTY) $42.36 + $23.40 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ELECTRICIAN (FERRY COUNTY) | $49.55 | $19.09 | $68.64 | ELEC0073-005 eff. 07/01/2025 |
| LINE CONSTRUCTION: LINEMEN | $60.54 | $24.88 | $85.42 | ELEC0077-001 eff. 02/01/2023 |
| ELECTRICIAN | $60.00 | $27.78 | $87.78 | ELEC0112-014 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) (FERRY COUNTY) | $45.36 | $23.40 | $68.76 | ENGI0302-130 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.); GRADER/BLADE (FERRY COUNTY) | $43.39 | $23.40 | $66.79 | ENGI0302-130 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC: (FERRY COUNTY) | $43.05 | $23.40 | $66.45 | ENGI0302-130 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER); DRILLING EQUIPMENT (8 UNCH BIT AND OVER) (ROBBINS, REVERSE CIRCULATION AND SIMILAR); BOOM TRUCK (UNDER 25 TONS): (FERRY COUNTY) | $42.71 | $23.40 | $66.11 | ENGI0302-130 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T); OILER; DRILL (CHURN, CORE, CALYX OR DIAMOND) (FERRY COUNTY) | $42.51 | $23.40 | $65.91 | ENGI0302-130 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT): (FERRY COUNTY) | $42.31 | $23.40 | $65.71 | ENGI0302-130 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT (FERRY COUNTY) | $41.56 | $23.40 | $64.96 | ENGI0302-130 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS: (FERRY COUNTY) | $41.17 | $23.40 | $64.57 | ENGI0302-130 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER): (GARFIELD COUNTY) | $42.36 | $23.40 | $65.76 | ENGI0302-131 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.); GRADER/BLADE: (GARFIELD COUNTY) | $40.39 | $23.40 | $63.79 | ENGI0302-131 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC: (GARFIELD COUNTY) | $40.05 | $23.40 | $63.45 | ENGI0302-131 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER); DRILLING EQUIPMENT (8 UNCH BIT AND OVER) (ROBBINS, REVERSE CIRCULATION AND SIMILAR); BOOM TRUCK (UNDER 25 TONS): (GARFIELD COUNTY) | $39.71 | $23.40 | $63.11 | ENGI0302-131 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T); OILER; DRILL (CHURN, CORE, CALYX OR DIAMOND) (GARFIELD COUNTY) | $39.51 | $23.40 | $62.91 | ENGI0302-131 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT): (GARFIELD COUNTY) | $39.31 | $23.40 | $62.71 | ENGI0302-131 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS (GARFIELD COUNTY) | $38.17 | $23.40 | $61.57 | ENGI0302-131 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: GARFIELD COUNTY | $38.56 | $23.40 | $61.96 | ENGI0302-131 eff. 06/01/2025 |
| IRONWORKER (REINFORCING AND STRUCTURAL) | $43.40 | $32.77 | $76.17 | IRON0014-001 eff. 07/07/2025 |
| LABORER, MASON TENDER BRICK | $38.05 | $16.75 | $54.80 | LABO0238-007 eff. 06/01/2025 |
| LABORER: A-1: GROUP 10 GRADE CHECKER: (GARFIELD COUNTY) | $40.21 | $16.90 | $57.11 | LABO0238-045 eff. 06/01/2025 |
| LABORER: A-1: GROUP 3 CEMENT/CONCRETE; PIPELAYER; CHIPPING GUNS: (GARFIELD COUNTY) | $37.46 | $16.90 | $54.36 | LABO0238-045 eff. 06/01/2025 |
| LABORER: A-1: GROUP 2 COMMON OR GENERAL LABORER (GARFIELD COUNTY) | $37.13 | $16.90 | $54.03 | LABO0238-045 eff. 06/01/2025 |
| LABORER: A-1: GROUP 1 FLAGGER: (GARFIELD COUNTY) | $34.03 | $16.90 | $50.93 | LABO0238-045 eff. 06/01/2025 |
| LABORER: A-2: GROUP 10 GRADE CHECKER: (FERRY COUNTY) | $43.21 | $16.90 | $60.11 | LABO0238-046 eff. 06/01/2025 |
| LABORER: A-2: GROUP 3 CEMENT/CONCRETE; PIPELAYER; CHIPPING GUNS: (FERRY COUNTY) | $40.46 | $16.90 | $57.36 | LABO0238-046 eff. 06/01/2025 |
| LABORER: A-2: GROUP 2 COMMON OR GENERAL LABORER: (FERRY COUNTY) | $40.13 | $16.90 | $57.03 | LABO0238-046 eff. 06/01/2025 |
| LABORER: A-2: GROUP 1 FLAGGER: (FERRY COUNTY) | $37.03 | $16.90 | $53.93 | LABO0238-046 eff. 06/01/2025 |
| PAINTER (BRUSH, ROLLER, AND SPRAY.) | $36.26 | $17.01 | $53.27 | PAIN0427-003 eff. 07/01/2025 |
| TRUCK DRIVER: 10 YARD TRUCK | $24.61 | $8.34 | $32.95 | SUWA2024-001 eff. 08/07/2009 |
| TRUCK DRIVER: WATER TRUCK | $24.36 | $8.30 | $32.66 | SUWA2024-001 eff. 08/07/2009 |
| TRUCK DRIVER: DUMP TRUCK | $19.67 | $0.00 | $19.67 | SUWA2024-001 eff. 08/07/2009 |
| LABORER: LANDSCAPE | $14.67 | $0.00 | $14.67 | SUWA2024-001 eff. 08/07/2009 |
| CEMENT MASON/CONCRETE FINISHER | $17.21 | $0.00 | $17.21 | SUWA2024-001 eff. 08/07/2009 |
| CARPENTER | $24.03 | $6.50 | $30.53 | SUWA2024-001 eff. 08/07/2009 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.