Washington prevailing wage rates: WA20260062

Heavy construction in Ferry, Garfield Counties.

WA20260062, modification 2, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 1

No existing rate changed amount.

8 classifications added, 9 removed or reworded
  • removed GROUP 1 was $38.17 + $23.40 fringe
  • removed GROUP 2 was $36.28 + $22.45 fringe
  • removed GROUP 3 was $39.31 + $23.40 fringe
  • removed GROUP 4 was $39.51 + $23.40 fringe
  • removed GROUP 5 was $39.71 + $23.40 fringe
  • removed GROUP 6 was $40.05 + $23.40 fringe
  • removed GROUP 7 was $40.39 + $23.40 fringe
  • removed GROUP 8 was $42.36 + $23.40 fringe
  • removed POWER EQUIPMENT OPERATOR was $38.56 + $23.40 fringe
  • added POWER EQUIPMENT OPERATOR: GARFIELD COUNTY $38.56 + $23.40 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS (GARFIELD COUNTY) $38.17 + $23.40 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT): (GARFIELD COUNTY) $39.31 + $23.40 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T); OILER; DRILL (CHURN, CORE, CALYX OR DIAMOND) (GARFIELD COUNTY) $39.51 + $23.40 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER); DRILLING EQUIPMENT (8 UNCH BIT AND OVER) (ROBBINS, REVERSE CIRCULATION AND SIMILAR); BOOM TRUCK (UNDER 25 TONS): (GARFIELD COUNTY) $39.71 + $23.40 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC: (GARFIELD COUNTY) $40.05 + $23.40 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.); GRADER/BLADE: (GARFIELD COUNTY) $40.39 + $23.40 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER): (GARFIELD COUNTY) $42.36 + $23.40 fringe

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

WA20260062 wage rates
ClassificationBaseFringeTotalRate ID
ELECTRICIAN (FERRY COUNTY)$49.55$19.09$68.64ELEC0073-005
eff. 07/01/2025
LINE CONSTRUCTION: LINEMEN$60.54$24.88$85.42ELEC0077-001
eff. 02/01/2023
ELECTRICIAN$60.00$27.78$87.78ELEC0112-014
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER) (FERRY COUNTY)$45.36$23.40$68.76ENGI0302-130
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.); GRADER/BLADE (FERRY COUNTY)$43.39$23.40$66.79ENGI0302-130
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC: (FERRY COUNTY)$43.05$23.40$66.45ENGI0302-130
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER); DRILLING EQUIPMENT (8 UNCH BIT AND OVER) (ROBBINS, REVERSE CIRCULATION AND SIMILAR); BOOM TRUCK (UNDER 25 TONS): (FERRY COUNTY)$42.71$23.40$66.11ENGI0302-130
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T); OILER; DRILL (CHURN, CORE, CALYX OR DIAMOND) (FERRY COUNTY)$42.51$23.40$65.91ENGI0302-130
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT): (FERRY COUNTY)$42.31$23.40$65.71ENGI0302-130
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 2 FORK LIFT (FERRY COUNTY)$41.56$23.40$64.96ENGI0302-130
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS: (FERRY COUNTY)$41.17$23.40$64.57ENGI0302-130
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 8 CRANES (85 TONS AND OVER, AND ALL CLIMBING, OVERHEAD,RAIL AND TOWER); LOADERS (OVERHEAD AND FRONT-END, 10 YARDS AND OVER): (GARFIELD COUNTY)$42.36$23.40$65.76ENGI0302-131
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 7 BACKHOE (OVER 110,000); TRACKHOE/EXCAVATOR (3 YDS & OVER); CRANES (OVER 45 TONS TO BUT NOT INCLUDING 85 TONS); LOADERS (OVERHEAD & FRONT-END, OVER 8 YDS. TO 10 YDS.); GRADER/BLADE: (GARFIELD COUNTY)$40.39$23.40$63.79ENGI0302-131
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 6 ASPHALT ROLLER; BACKHOE (45,000 GW AND OVER TO 110,000 GW); TRACKHOE/EXCAVATOR (3/4 YD. TO 3 YD.); CRANES (OVER 25 TONS, TO AND INCLUDING 45 TONS), BULLDOZER, 834 R/T & SIMILAR; LOADER OPERATOR (FRONT-END & OVERHEAD, 4 YDS. INCL. 8 YDS.); MECHANIC: (GARFIELD COUNTY)$40.05$23.40$63.45ENGI0302-131
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 5 BACKHOE (UNDER 45,000 GW); TRACKHOE/EXCAVATOR (UNDER 3/4 YD.); CRANES (25 TONS & UNDER); DRILLING EQUIPMENT (8 UNCH BIT AND OVER) (ROBBINS, REVERSE CIRCULATION AND SIMILAR); BOOM TRUCK (UNDER 25 TONS): (GARFIELD COUNTY)$39.71$23.40$63.11ENGI0302-131
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 4 LOADERS (OVERHEAD & FRONT-END, UNDER 4 YDS. R/T); OILER; DRILL (CHURN, CORE, CALYX OR DIAMOND) (GARFIELD COUNTY)$39.51$23.40$62.91ENGI0302-131
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 3 BULLDOZER (UP TO D-6 OR EQUIVALENT): (GARFIELD COUNTY)$39.31$23.40$62.71ENGI0302-131
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GROUP 1 ROLLERS, ALL TYPES ON SUBGRADE, INCLUDING SEAL AND CHIP COATINGS (GARFIELD COUNTY)$38.17$23.40$61.57ENGI0302-131
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: GARFIELD COUNTY$38.56$23.40$61.96ENGI0302-131
eff. 06/01/2025
IRONWORKER (REINFORCING AND STRUCTURAL)$43.40$32.77$76.17IRON0014-001
eff. 07/07/2025
LABORER, MASON TENDER BRICK$38.05$16.75$54.80LABO0238-007
eff. 06/01/2025
LABORER: A-1: GROUP 10 GRADE CHECKER: (GARFIELD COUNTY)$40.21$16.90$57.11LABO0238-045
eff. 06/01/2025
LABORER: A-1: GROUP 3 CEMENT/CONCRETE; PIPELAYER; CHIPPING GUNS: (GARFIELD COUNTY)$37.46$16.90$54.36LABO0238-045
eff. 06/01/2025
LABORER: A-1: GROUP 2 COMMON OR GENERAL LABORER (GARFIELD COUNTY)$37.13$16.90$54.03LABO0238-045
eff. 06/01/2025
LABORER: A-1: GROUP 1 FLAGGER: (GARFIELD COUNTY)$34.03$16.90$50.93LABO0238-045
eff. 06/01/2025
LABORER: A-2: GROUP 10 GRADE CHECKER: (FERRY COUNTY)$43.21$16.90$60.11LABO0238-046
eff. 06/01/2025
LABORER: A-2: GROUP 3 CEMENT/CONCRETE; PIPELAYER; CHIPPING GUNS: (FERRY COUNTY)$40.46$16.90$57.36LABO0238-046
eff. 06/01/2025
LABORER: A-2: GROUP 2 COMMON OR GENERAL LABORER: (FERRY COUNTY)$40.13$16.90$57.03LABO0238-046
eff. 06/01/2025
LABORER: A-2: GROUP 1 FLAGGER: (FERRY COUNTY)$37.03$16.90$53.93LABO0238-046
eff. 06/01/2025
PAINTER (BRUSH, ROLLER, AND SPRAY.)$36.26$17.01$53.27PAIN0427-003
eff. 07/01/2025
TRUCK DRIVER: 10 YARD TRUCK$24.61$8.34$32.95SUWA2024-001
eff. 08/07/2009
TRUCK DRIVER: WATER TRUCK$24.36$8.30$32.66SUWA2024-001
eff. 08/07/2009
TRUCK DRIVER: DUMP TRUCK$19.67$0.00$19.67SUWA2024-001
eff. 08/07/2009
LABORER: LANDSCAPE$14.67$0.00$14.67SUWA2024-001
eff. 08/07/2009
CEMENT MASON/CONCRETE FINISHER$17.21$0.00$17.21SUWA2024-001
eff. 08/07/2009
CARPENTER$24.03$6.50$30.53SUWA2024-001
eff. 08/07/2009

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.