Washington prevailing wage rates: WA20260109
Building construction in Kitsap County.
WA20260109, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
0 classifications added, 1 removed or reworded
- removed OPERATOR: Drill was $56.42 + $21.15 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $75.37 | $18.82 | $94.19 | ASBE0007-007 eff. 06/01/2025 |
| TILE SETTER | $49.70 | $18.62 | $68.32 | BRWA0001-013 eff. 06/01/2025 |
| TILE FINISHER | $40.98 | $18.17 | $59.15 | BRWA0001-013 eff. 06/01/2025 |
| BRICKLAYER | $55.34 | $20.05 | $75.39 | BRWA0001-015 eff. 06/01/2025 |
| CARPENTER (INCLUDES DRYWALL HANGER) | $63.98 | $19.13 | $83.11 | CARP0206-007 eff. 06/01/2025 |
| ELECTRICIAN | $75.96 | $33.48 | $109.44 | ELEC0046-003 eff. 08/04/2025 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $60.93 | $27.57 | $88.50 | ENGI0302-098 eff. 06/01/2025 |
| OPERATOR: GRADER/BLADE | $60.93 | $27.57 | $88.50 | ENGI0302-098 eff. 06/01/2025 |
| OPERATOR: BULLDOZER (D9 & UNDER) | $59.49 | $27.57 | $87.06 | ENGI0302-098 eff. 06/01/2025 |
| OPERATOR: BLADE FINISH | $60.14 | $27.57 | $87.71 | ENGI0302-098 eff. 06/01/2025 |
| OPERATOR: ROLLER (PLANT MIX OR MULTI-LIFT MATERIALS) | $59.49 | $27.57 | $87.06 | ENGI0302-101 eff. 06/01/2025 |
| OPERATOR: ROLLER (OTHER THAN PLANT MIX) | $55.68 | $27.57 | $83.25 | ENGI0302-101 eff. 06/01/2025 |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | $59.49 | $27.57 | $87.06 | ENGI0302-101 eff. 06/01/2025 |
| OPERATOR: OILER (DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT; TRUCK CRANE OILER/DRIVER: UNDER 100 TONS) | $60.14 | $27.57 | $87.71 | ENGI0302-101 eff. 06/01/2025 |
| OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS) | $60.14 | $27.57 | $87.71 | ENGI0302-101 eff. 06/01/2025 |
| OPERATOR: LOADER (OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS) | $60.93 | $27.57 | $88.50 | ENGI0302-101 eff. 06/01/2025 |
| OPERATOR: CRANE (45 TONS THROUGH 99 TONS, UNDER 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | $60.93 | $27.57 | $88.50 | ENGI0302-101 eff. 06/01/2025 |
| OPERATOR: CRANE (20 TONS THROUGH 44 TONS WITH ATTACHMENTS; TRUCK CRANE OILER/DRIVER: 100 TONS) | $60.14 | $27.57 | $87.71 | ENGI0302-101 eff. 06/01/2025 |
| OPERATOR: CRANE (100 TONS THROUGH 199 TONS, OR 150' OF BOOM (INCLUDING JIB WITH ATTACHMENTS)) | $61.83 | $27.57 | $89.40 | ENGI0302-101 eff. 06/01/2025 |
| OPERATOR: CONCRETE PUMP (TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M) | $60.93 | $27.57 | $88.50 | ENGI0302-101 eff. 06/01/2025 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (UNDER 15 METRIC TONS) | $59.49 | $27.57 | $87.06 | ENGI0302-101 eff. 06/01/2025 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (OVER 30 METRIC TONS AND UP TO 50 METRIC TONS) | $60.93 | $27.57 | $88.50 | ENGI0302-101 eff. 06/01/2025 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (15 TO 30 METRIC TONS) | $60.14 | $27.57 | $87.71 | ENGI0302-101 eff. 06/01/2025 |
| IRONWORKER | $57.94 | $34.52 | $92.46 | IRON0086-006 eff. 07/07/2025 |
| LABORER: FORM STRIPPING | $50.38 | $16.96 | $67.34 | LABO0242-015 eff. 06/01/2025 |
| LABORER: GRADE CHECKER | $52.31 | $17.01 | $69.32 | LABO0242-017 eff. 06/01/2025 |
| LABORER: JACKHAMMER | $51.52 | $16.99 | $68.51 | LABO0242-018 eff. 06/01/2025 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $50.38 | $16.96 | $67.34 | LABO0242-019 eff. 06/01/2025 |
| LABORER: NOZZLE PERSON | $52.31 | $17.01 | $69.32 | LABO0242-020 eff. 06/01/2025 |
| LABORER: CONCRETE SAW CHAIN | $51.52 | $16.99 | $68.51 | LABO0252-015 eff. 06/01/2025 |
| LABORER, MASON TENDER BRICK | $50.38 | $16.96 | $67.34 | LABO0252-017 eff. 06/01/2025 |
| LABORER: FIRE WATCH | $40.56 | $15.60 | $56.16 | LABO0335-007 eff. 06/01/2025 |
| PAINTER | $41.24 | $14.70 | $55.94 | PAIN0300-003 eff. 07/01/2025 |
| DRYWALL FINISHER/TAPER | $53.59 | $23.65 | $77.24 | PAIN0364-001 eff. 07/01/2025 |
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 | $75.43 | PLAS0528-009 eff. 06/01/2024 |
| PLASTERER | $52.50 | $20.67 | $73.17 | PLAS0528-010 eff. 06/01/2024 |
| PIPEFITTER | $60.72 | $34.15 | $94.87 | PLUM0026-015 eff. 06/01/2025 |
| PLUMBER | $60.72 | $34.15 | $94.87 | PLUM0026-018 eff. 06/01/2025 |
| ROOFER | $48.01 | $16.44 | $64.45 | ROOF0153-006 eff. 02/01/2024 |
| SPRINKLER FITTER | $68.89 | $33.80 | $102.69 | SFWA0699-004 eff. 07/01/2025 |
| SHEET METAL WORKER | $69.86 | $33.39 | $103.25 | SHEE0066-014 eff. 06/01/2025 |
| TRUCK DRIVER: DUMP TRUCK | $45.47 | $7.05 | $52.52 | SUWA2018-009 eff. 03/01/2024 |
| OPERATOR: MECHANIC | $45.17 | $19.20 | $64.37 | SUWA2018-009 eff. 03/01/2024 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $40.53 | $9.56 | $50.09 | SUWA2018-009 eff. 03/01/2024 |
| LABORER: PIPELAYER | $35.83 | $10.89 | $46.72 | SUWA2018-009 eff. 03/01/2024 |
| LABORER: COMMON OR GENERAL | $36.24 | $10.89 | $47.13 | SUWA2018-009 eff. 03/01/2024 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $42.25 | $0.00 | $42.25 | SUWA2018-009 eff. 03/01/2024 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | $35.54 | $10.89 | $46.43 | SUWA2018-009 eff. 03/01/2024 |
| TRUCK DRIVER: CONCRETE TRUCK | $55.43 | $27.52 | $82.95 | TEAM0174-009 eff. 06/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.