Washington prevailing wage rates: WA20260122
Heavy construction in Chelan County.
WA20260122, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER | $44.21 | $17.28 | $61.49 | CARP0059-012 eff. 06/01/2025 |
| LINE CONSTRUCTION: LINE PERSON | $64.17 | $24.54 | $88.71 | ELEC0077-002 eff. 02/01/2024 |
| TREE TRIMMER: GROUND PERSON | $22.60 | $16.37 | $38.97 | ELEC0077-003 eff. 02/01/2023 |
| TREE TRIMMER | $42.57 | $17.97 | $60.54 | ELEC0077-003 eff. 02/01/2023 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | $55.19 | $20.94 | $76.13 | ELEC0077-005 eff. 02/01/2024 |
| LINE CONSTRUCTION: (GROUND PERSON) | $37.53 | $17.74 | $55.27 | ELEC0077-006 eff. 02/01/2023 |
| ELECTRICIAN | $53.20 | $29.15 | $82.35 | ELEC0191-002 eff. 01/01/2024 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE: OVER 30 METRIC TONS AND UP TO 50 METRIC TONS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $60.67 | $27.57 | $88.24 | ENGI0302-069 eff. 06/01/2025 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE: 15 TO 30 METRIC TONS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 | $87.45 | ENGI0302-069 eff. 06/01/2025 |
| OPERATOR: CRANE: 100 TONS THROUGH 199 TONS, OR 150? OF BOOM (INCLUDING JIB WITH ATTACHMENTS) (WEST OF THE 120TH MERIDIAN) | $61.56 | $27.57 | $89.13 | ENGI0302-090 eff. 06/01/2025 |
| OPERATOR: DRILL: HORIZONTAL/DIRECTIONAL DRILL OPERATOR (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.23 | $27.57 | $86.80 | ENGI0302-106 eff. 06/01/2025 |
| OPERATOR: DRILL: HORIZONTAL/DIRECTIONAL DRILL LOCATOR (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 | $87.45 | ENGI0302-106 eff. 06/01/2025 |
| OPERATOR: DRILL: DRILLING MACHINE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $60.67 | $27.57 | $88.24 | ENGI0302-106 eff. 06/01/2025 |
| OPERATOR: BULLDOZER: D9 & UNDER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.23 | $27.57 | $86.80 | ENGI0302-106 eff. 06/01/2025 |
| OPERATOR: SCRAPER: SELF PROPELLED UNDER 45 YARDS (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 | $87.45 | ENGI0302-111 eff. 07/07/2025 |
| OPERATOR: OILER: TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.23 | $27.57 | $86.80 | ENGI0302-111 eff. 07/07/2025 |
| OPERATOR: OILER: DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 | $87.45 | ENGI0302-111 eff. 07/07/2025 |
| OPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT UP TO 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.88 | $27.57 | $87.45 | ENGI0302-111 eff. 07/07/2025 |
| OPERATOR: CONCRETE PUMP: TRUCK MOUNT WITH BOOM ATTACHMENT OVER 42M (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $60.67 | $27.57 | $88.24 | ENGI0302-111 eff. 07/07/2025 |
| OPERATOR: CONCRETE PUMP: MOUNTED OR TRAILER HIGH PRESSURE LINE PUMP, PUMP HIGH PRESSURE (COUNTY WHICH LIES WEST OF THE 120TH MERIDIAN) | $59.23 | $27.57 | $86.80 | ENGI0302-111 eff. 07/07/2025 |
| IRONWORKER | $57.94 | $34.52 | $92.46 | IRON0086-005 eff. 07/07/2025 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $50.38 | $16.96 | $67.34 | LABO0242-009 eff. 06/01/2025 |
| LABORER: NOZZLE PERSON | $52.31 | $17.01 | $69.32 | LABO0242-010 eff. 06/01/2025 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $53.99 | $17.05 | $71.04 | LABO0292-009 eff. 06/01/2025 |
| TRAFFIC CONTROL: FLAGGER | $34.03 | $16.90 | $50.93 | LABO0348-011 eff. 06/01/2025 |
| PAINTER | $41.24 | $14.70 | $55.94 | PAIN0300-002 eff. 07/01/2025 |
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 | $75.43 | PLAS0528-008 eff. 06/01/2024 |
| TRUCK DRIVER: WATER TRUCK | $31.62 | $16.84 | $48.46 | SUWA2018-022 eff. 03/01/2024 |
| TRUCK DRIVER: DUMP TRUCK | $26.27 | $8.56 | $34.83 | SUWA2018-022 eff. 03/01/2024 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $30.61 | $10.89 | $41.50 | SUWA2018-022 eff. 03/01/2024 |
| OPERATOR: ROLLER | $45.11 | $11.08 | $56.19 | SUWA2018-022 eff. 03/01/2024 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $32.35 | $13.44 | $45.79 | SUWA2018-022 eff. 03/01/2024 |
| OPERATOR: MECHANIC | $34.39 | $14.95 | $49.34 | SUWA2018-022 eff. 03/01/2024 |
| OPERATOR: LOADER | $37.92 | $12.05 | $49.97 | SUWA2018-022 eff. 03/01/2024 |
| OPERATOR: GRADER/BLADE | $40.28 | $16.17 | $56.45 | SUWA2018-022 eff. 03/01/2024 |
| OPERATOR: FORKLIFT | $45.93 | $19.20 | $65.13 | SUWA2018-022 eff. 03/01/2024 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $43.60 | $0.00 | $43.60 | SUWA2018-022 eff. 03/01/2024 |
| LABORER: FENCE ERECTOR | $30.21 | $0.00 | $30.21 | SUWA2018-022 eff. 03/01/2024 |
| LABORER: PIPELAYER | $40.85 | $10.89 | $51.74 | SUWA2018-022 eff. 03/01/2024 |
| LABORER: HOD CARRIER | $35.06 | $10.94 | $46.00 | SUWA2018-022 eff. 03/01/2024 |
| LABORER: CONCRETE SAW CHAIN | $36.24 | $10.89 | $47.13 | SUWA2018-022 eff. 03/01/2024 |
| LABORER: COMMON OR GENERAL | $27.99 | $3.04 | $31.03 | SUWA2018-022 eff. 03/01/2024 |
| GRADE CHECKER | $34.79 | $13.87 | $48.66 | SUWA2018-022 eff. 03/01/2024 |
| TRUCK DRIVER: ASPHALT MIX | $55.43 | $27.52 | $82.95 | TEAM0313-001 eff. 06/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.