What changed since modification 0
No existing rate changed amount.
0 classifications added, 2 removed or reworded
- removed GRADE CHECKER was $49.16 + $18.87 fringe
- removed TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper was $39.00 + $14.40 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| BRICKLAYER | $55.34 | $20.05 | $75.39 | BRWA0001-024 eff. 06/01/2025 |
| PILEDRIVER PERSON | $65.53 | $19.13 | $84.66 | CARP0196-002 eff. 06/01/2025 |
| CARPENTER | $63.98 | $19.13 | $83.11 | CARP0206-005 eff. 06/01/2025 |
| ELECTRICIAN | $75.96 | $33.48 | $109.44 | ELEC0046-002 eff. 08/04/2025 |
| LINE CONSTRUCTION: LINE PERSON | $64.17 | $24.54 | $88.71 | ELEC0077-002 eff. 02/01/2024 |
| TREE TRIMMER: GROUND PERSON | $22.60 | $16.37 | $38.97 | ELEC0077-003 eff. 02/01/2023 |
| TREE TRIMMER | $42.57 | $17.97 | $60.54 | ELEC0077-003 eff. 02/01/2023 |
| LINE CONSTRUCTION: (CABLE SPLICER) | $64.17 | $24.77 | $88.94 | ELEC0077-004 eff. 02/01/2024 |
| LINE CONSTRUCTION: EQUIPMENT OPERATOR | $55.19 | $20.94 | $76.13 | ELEC0077-005 eff. 02/01/2024 |
| LINE CONSTRUCTION: (GROUND PERSON) | $37.53 | $17.74 | $55.27 | ELEC0077-006 eff. 02/01/2023 |
| OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS) | $61.14 | $27.57 | $88.71 | ENGI0302-079 eff. 06/01/2025 |
| OPERATOR: LOADER (OVERHEAD 8 YARDS & OVER) | $61.93 | $27.57 | $89.50 | ENGI0302-079 eff. 06/01/2025 |
| OPERATOR: LOADER (OVERHEAD 6 YARDS BUT NOT INCLUDING 8 YARDS) | $62.85 | $27.57 | $90.42 | ENGI0302-079 eff. 06/01/2025 |
| OPERATOR: SCREED | $61.93 | $27.57 | $89.50 | ENGI0302-088 eff. 06/01/2025 |
| OPERATOR: ROLLER (PLANT MIX OR MULTI-LIFT MATERIALS) | $60.46 | $27.57 | $88.03 | ENGI0302-088 eff. 06/01/2025 |
| OPERATOR: ROLLER (OTHER THAN PLANT MIX) | $56.63 | $27.57 | $84.20 | ENGI0302-088 eff. 06/01/2025 |
| OPERATOR: CRANE GROUP III THROUGH 19 TONS WITH ATTACHMENTS, A-FRAME OVER 10 TONS | $60.46 | $27.57 | $88.03 | ENGI0302-091 eff. 06/01/2025 |
| OPERATOR: CRANE GROUP II 20 TONS THROUGH 44 TONS WITH ATTACHMENTS | $61.14 | $27.57 | $88.71 | ENGI0302-091 eff. 06/01/2025 |
| OPERATOR: CRANE GROUP IAAA 300 TONS AND OVER OR 300' OF BOOM (INCLUDING JIB WITH ATTACHMENTS) | $64.66 | $27.57 | $92.23 | ENGI0302-091 eff. 06/01/2025 |
| OPERATOR: CRANE GROUP IAA: 200 TONS THROUGH 299 TONS, OR 250 OF BOOM (INCLUDING JIB WITH ATTACHMENTS) | $63.75 | $27.57 | $91.32 | ENGI0302-091 eff. 06/01/2025 |
| OPERATOR: CRANE GROUP IA: 100 TONS THROUGH 199 TONS, OR 150? OF BOOM (INCLUDING JIB WITH ATTACHMENTS) | $62.85 | $27.57 | $90.42 | ENGI0302-091 eff. 06/01/2025 |
| OPERATOR: CRANE GROUP I: 45 TONS THROUGH 99 TONS, UNDER 150? OF BOOM (INCLUDING JIB WITH ATTACHMENTS) | $61.93 | $27.57 | $89.50 | ENGI0302-091 eff. 06/01/2025 |
| OPERATOR: SCRAPER (SELF PROPELLED UNDER 45) | $61.14 | $27.57 | $88.71 | ENGI0302-100 eff. 06/01/2025 |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | $60.46 | $27.57 | $88.03 | ENGI0302-100 eff. 06/01/2025 |
| OPERATOR: OILER (DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT) | $61.14 | $27.57 | $88.71 | ENGI0302-100 eff. 06/01/2025 |
| OPERATOR: GRADER/BLADE | $61.93 | $27.57 | $89.50 | ENGI0302-100 eff. 06/01/2025 |
| OPERATOR: CONCRETE PUMP | $61.14 | $27.57 | $88.71 | ENGI0302-100 eff. 06/01/2025 |
| OPERATOR: BULLDOZER (D9 & UNDER) | $60.46 | $27.57 | $88.03 | ENGI0302-100 eff. 06/01/2025 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (OVER 30 METRIC TONS AND UP TO 50 METRIC TONS) | $61.93 | $27.57 | $89.50 | ENGI0302-100 eff. 06/01/2025 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE (15 TO 30 METRIC TONS) | $61.14 | $27.57 | $88.71 | ENGI0302-100 eff. 06/01/2025 |
| OPERATOR: MECHANIC | $62.85 | $27.57 | $90.42 | ENGI0302-108 eff. 06/01/2025 |
| OPERATOR: DRILL (HORIZONTAL/DIRECTIONAL DRILL OPERATOR) | $60.46 | $27.57 | $88.03 | ENGI0302-108 eff. 06/01/2025 |
| OPERATOR: DRILL (HORIZONTAL/DIRECTIONAL DRILL LOCATOR) | $61.14 | $27.57 | $88.71 | ENGI0302-108 eff. 06/01/2025 |
| OPERATOR: DRILL (DRILLING MACHINE) | $62.85 | $27.57 | $90.42 | ENGI0302-108 eff. 06/01/2025 |
| IRONWORKER | $57.94 | $34.52 | $92.46 | IRON0086-005 eff. 07/07/2025 |
| LABORER: COMMON OR GENERAL | $50.38 | $16.96 | $67.34 | LABO0242-005 eff. 06/01/2025 |
| TRAFFIC CONTROL: FLAGGER | $40.88 | $16.72 | $57.60 | LABO0242-006 eff. 06/01/2025 |
| LABORER: FENCE ERECTOR | $40.88 | $16.72 | $57.60 | LABO0242-006 eff. 06/01/2025 |
| LABORER: PIPELAYER | $51.52 | $16.99 | $68.51 | LABO0242-007 eff. 06/01/2025 |
| LABORER: CONCRETE SAW CHAIN | $51.52 | $16.99 | $68.51 | LABO0242-007 eff. 06/01/2025 |
| LABORER: HOD CARRIER | $52.31 | $17.01 | $69.32 | LABO0242-008 eff. 06/01/2025 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $50.38 | $16.96 | $67.34 | LABO0242-009 eff. 06/01/2025 |
| LABORER: NOZZLE PERSON | $52.31 | $17.01 | $69.32 | LABO0242-010 eff. 06/01/2025 |
| PAINTER | $41.24 | $14.70 | $55.94 | PAIN0300-002 eff. 07/01/2025 |
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 | $75.43 | PLAS0528-008 eff. 06/01/2024 |
| PLUMBER | $60.72 | $34.15 | $94.87 | PLUM0026-005 eff. 06/01/2025 |
| PIPEFITTER | $75.21 | $33.88 | $109.09 | PLUM0032-002 eff. 06/01/2025 |
| SHEET METAL WORKER | $69.86 | $33.39 | $103.25 | SHEE0066-011 eff. 06/01/2025 |
| TRUCK DRIVER: WATER TRUCK | $31.62 | $16.84 | $48.46 | SUWA2018-025 eff. 03/01/2024 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $32.35 | $13.44 | $45.79 | SUWA2018-025 eff. 03/01/2024 |
| OPERATOR: MILLING MACHINE | $48.95 | $10.33 | $59.28 | SUWA2018-025 eff. 03/01/2024 |
| OPERATOR: FORKLIFT | $49.89 | $0.00 | $49.89 | SUWA2018-025 eff. 03/01/2024 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $50.49 | $0.00 | $50.49 | SUWA2018-025 eff. 03/01/2024 |
| MILLWRIGHT | $51.09 | $8.85 | $59.94 | SUWA2018-025 eff. 03/01/2024 |
| LABORER: LANDSCAPE | $27.40 | $0.00 | $27.40 | SUWA2018-025 eff. 03/01/2024 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $41.71 | $6.33 | $48.04 | SUWA2018-025 eff. 03/01/2024 |
| TRUCK DRIVER: DUMP TRUCK | $55.48 | $27.52 | $83.00 | TEAM0174-008 eff. 06/01/2025 |
| TRUCK DRIVER: ASPHALT MIX | $55.43 | $27.52 | $82.95 | TEAM0313-001 eff. 06/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.