Washington prevailing wage rates: WA20260126
Heavy construction in Kitsap County.
WA20260126, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
0 classifications added, 2 removed or reworded
- removed GRADE CHECKER was $48.64 + $18.82 fringe
- removed TRAFFIC CONTROL: Laborer-Cones/ Barricades/Barrels - Setter/Mover/Sweeper was $39.00 + $14.40 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER, EXCLUDES FORM WORK | $63.98 | $19.13 | $83.11 | CARP0206-008 eff. 06/01/2025 |
| ELECTRICIAN | $75.96 | $33.48 | $109.44 | ELEC0046-002 eff. 08/04/2025 |
| TREE TRIMMER: GROUND PERSON | $22.60 | $16.37 | $38.97 | ELEC0077-003 eff. 02/01/2023 |
| TREE TRIMMER | $42.57 | $17.97 | $60.54 | ELEC0077-003 eff. 02/01/2023 |
| OPERATOR: SCRAPER (SELF PROPELLED UNDER 45 YARDS) | $60.14 | $27.57 | $87.71 | ENGI0302-107 eff. 06/01/2025 |
| OPERATOR: OILER (TRUCK CRANE OILER/DRIVER: 100 TONS AND OVER) | $59.49 | $27.57 | $87.06 | ENGI0302-107 eff. 06/01/2025 |
| OPERATOR: OILER (DRILL OILERS: AUGER TYPE, TRUCK OR CRANE MOUNT) | $60.14 | $27.57 | $87.71 | ENGI0302-107 eff. 06/01/2025 |
| OPERATOR: LOADER (OVERHEAD UNDER 6 YARDS; PLANT FEED) | $60.14 | $27.57 | $87.71 | ENGI0302-107 eff. 06/01/2025 |
| OPERATOR: GRADER/BLADE | $60.93 | $27.57 | $88.50 | ENGI0302-107 eff. 06/01/2025 |
| OPERATOR: DRILL (HORIZONTAL/DIRECTIONAL DRILL OPERATOR) | $59.49 | $27.57 | $87.06 | ENGI0302-107 eff. 06/01/2025 |
| OPERATOR: DRILL (HORIZONTAL/DIRECTIONAL DRILL LOCATOR) | $60.14 | $27.57 | $87.71 | ENGI0302-107 eff. 06/01/2025 |
| OPERATOR: DRILL (DRILLING MACHINE) | $61.83 | $27.57 | $89.40 | ENGI0302-107 eff. 06/01/2025 |
| OPERATOR: CONCRETE PUMP | $59.49 | $27.57 | $87.06 | ENGI0302-107 eff. 06/01/2025 |
| OPERATOR: BULLDOZER (D-9 & UNDER) | $59.49 | $27.57 | $87.06 | ENGI0302-107 eff. 06/01/2025 |
| IRONWORKER | $57.94 | $34.52 | $92.46 | IRON0086-005 eff. 07/07/2025 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $50.38 | $16.96 | $67.34 | LABO0242-009 eff. 06/01/2025 |
| LABORER: NOZZLE PERSON | $52.31 | $17.01 | $69.32 | LABO0242-010 eff. 06/01/2025 |
| PAINTER | $41.24 | $14.70 | $55.94 | PAIN0300-002 eff. 07/01/2025 |
| CEMENT MASON/CONCRETE FINISHER | $54.16 | $21.27 | $75.43 | PLAS0528-008 eff. 06/01/2024 |
| TRUCK DRIVER: WATER TRUCK | $31.62 | $16.84 | $48.46 | SUWA2018-026 eff. 03/01/2024 |
| TRUCK DRIVER: DUMP TRUCK | $26.13 | $12.71 | $38.84 | SUWA2018-026 eff. 03/01/2024 |
| TRAFFIC CONTROL: FLAGGER | $35.09 | $0.00 | $35.09 | SUWA2018-026 eff. 03/01/2024 |
| OPERATOR: ROLLER | $46.21 | $12.18 | $58.39 | SUWA2018-026 eff. 03/01/2024 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $32.35 | $13.44 | $45.79 | SUWA2018-026 eff. 03/01/2024 |
| OPERATOR: MECHANIC | $53.10 | $4.41 | $57.51 | SUWA2018-026 eff. 03/01/2024 |
| OPERATOR: FORKLIFT | $49.89 | $0.00 | $49.89 | SUWA2018-026 eff. 03/01/2024 |
| OPERATOR: CRANE | $42.17 | $17.71 | $59.88 | SUWA2018-026 eff. 03/01/2024 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $51.50 | $0.00 | $51.50 | SUWA2018-026 eff. 03/01/2024 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $51.31 | $4.41 | $55.72 | SUWA2018-026 eff. 03/01/2024 |
| LABORER: FENCE ERECTOR | $29.70 | $0.00 | $29.70 | SUWA2018-026 eff. 03/01/2024 |
| LABORER: PIPELAYER | $39.04 | $10.31 | $49.35 | SUWA2018-026 eff. 03/01/2024 |
| LABORER: HOD CARRIER | $38.58 | $10.89 | $49.47 | SUWA2018-026 eff. 03/01/2024 |
| LABORER: CONCRETE SAW CHAIN | $36.41 | $10.89 | $47.30 | SUWA2018-026 eff. 03/01/2024 |
| LABORER: COMMON OR GENERAL | $38.68 | $0.00 | $38.68 | SUWA2018-026 eff. 03/01/2024 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $40.89 | $7.16 | $48.05 | SUWA2018-026 eff. 03/01/2024 |
| FORM WORKER | $48.26 | $14.59 | $62.85 | SUWA2018-026 eff. 03/01/2024 |
| TRUCK DRIVER: ASPHALT MIX | $55.43 | $27.52 | $82.95 | TEAM0313-001 eff. 06/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.