Washington prevailing wage rates: WA20260130
Heavy construction in Spokane County.
WA20260130, modification 2, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ELECTRICIAN | $49.55 | $19.09 | $68.64 | ELEC0073-009 eff. 07/01/2025 |
| LINE CONSTRUCTION: LINE PERSON | $64.17 | $24.54 | $88.71 | ELEC0077-002 eff. 02/01/2024 |
| TREE TRIMMER: GROUND PERSON | $22.60 | $16.37 | $38.97 | ELEC0077-003 eff. 02/01/2023 |
| TREE TRIMMER | $42.57 | $17.97 | $60.54 | ELEC0077-003 eff. 02/01/2023 |
| POWER EQUIPMENT OPERATOR: Group 8 Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grader Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/Directional Dr | $42.36 | $23.40 | $65.76 | ENGI0302-142 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: Group 6 Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grader Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/Directional Dr | $40.05 | $23.40 | $63.45 | ENGI0302-142 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: Group 5 Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grader Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/Directional Dr | $39.71 | $23.40 | $63.11 | ENGI0302-142 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: Group 4 Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grader Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/Directional Dr | $39.51 | $23.40 | $62.91 | ENGI0302-142 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: Group 3 Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grader Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/Directional Dr | $39.31 | $23.40 | $62.71 | ENGI0302-142 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: Group 2 Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grader Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/Directional Dr | $38.56 | $23.40 | $61.96 | ENGI0302-142 eff. 06/01/2025 |
| POWER EQUIPMENT OPERATOR: Group 1 Power Equipment Operators Classifications Group 1: Roller Group 2: Truck Crane Oiler/Driver Group 3: Bobcat/Skid Steer/Skid Loader; Bulldozer (D9 & Under) Group 4: Concrete Pump-Squeeze-Crete, Flow-Crete, Whitman & Similar; Drill Oilers: Auger Type, Truck or Crane Mount Group 5: Grader Checker Group 6: Concrete Pump-Boom Truck; Grader/Blade; Paver (Asphalt, Aggregate, and Concrete); Scraper; Screed Group 8: Drilling Machine; Horizontal/Directional Dr | $38.17 | $23.40 | $61.57 | ENGI0302-142 eff. 06/01/2025 |
| IRONWORKER | $43.40 | $32.77 | $76.17 | IRON0014-010 eff. 07/07/2025 |
| LABORER: COMMON OR GENERAL | $37.13 | $16.90 | $54.03 | LABO0238-039 eff. 06/01/2025 |
| TRAFFIC CONTROL: FLAGGER | $34.03 | $16.90 | $50.93 | LABO0238-040 eff. 06/01/2025 |
| LABORER: NOZZLE PERSON | $52.31 | $17.01 | $69.32 | LABO0242-010 eff. 06/01/2025 |
| PAINTER | $41.24 | $14.70 | $55.94 | PAIN0300-002 eff. 07/01/2025 |
| CEMENT MASON/CONCRETE FINISHER | $40.89 | $18.64 | $59.53 | PLAS0072-005 eff. 06/01/2025 |
| TRUCK DRIVER: WATER TRUCK | $31.62 | $16.84 | $48.46 | SUWA2018-030 eff. 03/01/2024 |
| TRUCK DRIVER: DUMP TRUCK | $31.24 | $18.60 | $49.84 | SUWA2018-030 eff. 03/01/2024 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $30.61 | $10.89 | $41.50 | SUWA2018-030 eff. 03/01/2024 |
| PILEDRIVER PERSON | $36.50 | $10.16 | $46.66 | SUWA2018-030 eff. 03/01/2024 |
| OPERATOR: MECHANIC | $38.91 | $18.60 | $57.51 | SUWA2018-030 eff. 03/01/2024 |
| OPERATOR: LOADER | $34.44 | $13.37 | $47.81 | SUWA2018-030 eff. 03/01/2024 |
| OPERATOR: FORKLIFT | $45.93 | $19.20 | $65.13 | SUWA2018-030 eff. 03/01/2024 |
| OPERATOR: CRANE | $31.97 | $15.15 | $47.12 | SUWA2018-030 eff. 03/01/2024 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $34.52 | $12.78 | $47.30 | SUWA2018-030 eff. 03/01/2024 |
| LABORER: FENCE ERECTOR | $30.21 | $0.00 | $30.21 | SUWA2018-030 eff. 03/01/2024 |
| LABORER: PIPELAYER | $37.55 | $0.00 | $37.55 | SUWA2018-030 eff. 03/01/2024 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $27.51 | $2.96 | $30.47 | SUWA2018-030 eff. 03/01/2024 |
| LABORER: HOD CARRIER | $35.06 | $10.94 | $46.00 | SUWA2018-030 eff. 03/01/2024 |
| LABORER: CONCRETE SAW CHAIN | $36.24 | $10.89 | $47.13 | SUWA2018-030 eff. 03/01/2024 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $36.96 | $8.56 | $45.52 | SUWA2018-030 eff. 03/01/2024 |
| CARPENTER | $39.31 | $3.42 | $42.73 | SUWA2018-030 eff. 03/01/2024 |
| TRUCK DRIVER: ASPHALT MIX | $55.43 | $27.52 | $82.95 | TEAM0313-001 eff. 06/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.