What changed since modification 1

No existing rate changed amount.

8 classifications added, 8 removed or reworded
  • removed POWER EQUIPMENT OPERATOR: Group 1 was $41.17 + $23.40 fringe
  • added POWER EQUIPMENT OPERATOR: Group 1Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul $41.17 + $23.40 fringe
  • removed POWER EQUIPMENT OPERATOR: Group 2 was $41.56 + $23.40 fringe
  • added POWER EQUIPMENT OPERATOR: Group 2Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul $41.56 + $23.40 fringe
  • removed POWER EQUIPMENT OPERATOR: Group 3 was $42.31 + $23.40 fringe
  • added POWER EQUIPMENT OPERATOR: Group 3Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul $42.31 + $23.40 fringe
  • removed POWER EQUIPMENT OPERATOR: Group 4 was $42.51 + $23.40 fringe
  • added POWER EQUIPMENT OPERATOR: Group 4Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul $42.51 + $23.40 fringe
  • removed POWER EQUIPMENT OPERATOR: Group 5 was $42.71 + $23.40 fringe
  • added POWER EQUIPMENT OPERATOR: Group 5Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul $42.71 + $23.40 fringe
  • removed POWER EQUIPMENT OPERATOR: Group 6 was $43.05 + $23.40 fringe
  • added POWER EQUIPMENT OPERATOR: Group 6Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul $43.05 + $23.40 fringe
  • removed POWER EQUIPMENT OPERATOR: Group 8 was $45.36 + $23.40 fringe
  • added POWER EQUIPMENT OPERATOR: Group 8Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul $45.36 + $23.40 fringe
  • removed POWER EQUIPMENT OPERATOR: Group 9 was $46.34 + $23.40 fringe
  • added POWER EQUIPMENT OPERATOR: Group 9Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul $46.34 + $23.40 fringe

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

WA20260131 wage rates
ClassificationBaseFringeTotalRate ID
ELECTRICIAN$49.55$19.09$68.64ELEC0073-009
eff. 07/01/2025
LINE CONSTRUCTION: LINE PERSON$64.17$24.54$88.71ELEC0077-002
eff. 02/01/2024
TREE TRIMMER: GROUND PERSON$22.60$16.37$38.97ELEC0077-003
eff. 02/01/2023
TREE TRIMMER$42.57$17.97$60.54ELEC0077-003
eff. 02/01/2023
POWER EQUIPMENT OPERATOR: Group 9Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul$46.34$23.40$69.74ENGI0302-139
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: Group 8Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul$45.36$23.40$68.76ENGI0302-139
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: Group 6Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul$43.05$23.40$66.45ENGI0302-139
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: Group 5Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul$42.71$23.40$66.11ENGI0302-139
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: Group 4Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul$42.51$23.40$65.91ENGI0302-139
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: Group 3Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul$42.31$23.40$65.71ENGI0302-139
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: Group 2Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul$41.56$23.40$64.96ENGI0302-139
eff. 06/01/2025
POWER EQUIPMENT OPERATOR: Group 1Power Equipment Operators Classifications Group 1: Roller Group 3: Dozer-Up to D-5 or Equivalent Group 4: Loader-Overhead Under 4 Yards Group 5: Crane-25 Tons & Under, All Attachments Included Group 6: Crane-25 to 44 Tons, All Attachments Included; Dozer-D-6 to D-9; Grader/Blade; Loader-Overhead 4 Yards, Including 8 Yards; Paver (Asphalt, Aggregate, and Concrete) Group 7: Blade Finish; Crane-45 to 55 Tons, All Attachments Included; Mechanic (90% of the Regul$41.17$23.40$64.57ENGI0302-139
eff. 06/01/2025
IRONWORKER$43.40$32.77$76.17IRON0014-010
eff. 07/07/2025
TRAFFIC CONTROL: FLAGGER$34.03$16.90$50.93LABO0238-040
eff. 06/01/2025
LABORER: NOZZLE PERSON$52.31$17.01$69.32LABO0242-010
eff. 06/01/2025
PAINTER$41.24$14.70$55.94PAIN0300-002
eff. 07/01/2025
CEMENT MASON/CONCRETE FINISHER$40.89$18.64$59.53PLAS0072-005
eff. 06/01/2025
TRUCK DRIVER: WATER TRUCK$31.62$16.84$48.46SUWA2018-031
eff. 03/01/2024
TRUCK DRIVER: DUMP TRUCK$31.24$18.60$49.84SUWA2018-031
eff. 03/01/2024
TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER$30.61$10.89$41.50SUWA2018-031
eff. 03/01/2024
PILEDRIVER PERSON$36.50$10.16$46.66SUWA2018-031
eff. 03/01/2024
OPERATOR: MECHANIC$34.97$15.31$50.28SUWA2018-031
eff. 03/01/2024
OPERATOR: LOADER$33.61$13.62$47.23SUWA2018-031
eff. 03/01/2024
OPERATOR: FORKLIFT$45.93$19.20$65.13SUWA2018-031
eff. 03/01/2024
OPERATOR: CRANE$31.97$15.15$47.12SUWA2018-031
eff. 03/01/2024
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$33.72$13.15$46.87SUWA2018-031
eff. 03/01/2024
LABORER: FENCE ERECTOR$30.21$0.00$30.21SUWA2018-031
eff. 03/01/2024
LABORER: PIPELAYER$37.55$0.00$37.55SUWA2018-031
eff. 03/01/2024
LABORER: MASON TENDER - CEMENT/CONCRETE$27.51$2.96$30.47SUWA2018-031
eff. 03/01/2024
LABORER: HOD CARRIER$35.06$10.94$46.00SUWA2018-031
eff. 03/01/2024
LABORER: CONCRETE SAW CHAIN$36.24$10.89$47.13SUWA2018-031
eff. 03/01/2024
LABORER: COMMON OR GENERAL$37.01$0.00$37.01SUWA2018-031
eff. 03/01/2024
LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR$36.96$8.56$45.52SUWA2018-031
eff. 03/01/2024
CARPENTER$39.31$3.42$42.73SUWA2018-031
eff. 03/01/2024
TRUCK DRIVER: ASPHALT MIX$55.43$27.52$82.95TEAM0313-001
eff. 06/01/2025

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.