West Virginia prevailing wage rates: WV20260013
Building construction in Lewis County.
WV20260013, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
No existing rate changed amount.
2 classifications added, 15 removed or reworded
- removed CARPENTER (Form Work Only) was $29.81 + $23.45 fringe
- removed CEMENT MASON/CONCRETE FINISHER was $30.29 + $19.29 fringe
- removed LABORER (Carpenter Tender) was $24.19 + $16.23 fringe
- removed LABORER (Chipping Gun) was $24.78 + $16.25 fringe
- removed LABORER (Concrete Worker) was $24.29 + $16.27 fringe
- removed LABORER (Grade Checker) was $24.24 + $16.27 fringe
- removed LABORER (Landscape) was $23.63 + $16.43 fringe
- removed LABORER (Mortar Mixer) was $24.35 + $16.20 fringe
- removed LABORER (Pipelayer) was $24.34 + $16.41 fringe
- removed LABORER (Scaffold Builder) was $24.04 + $16.35 fringe
- removed LABORER (Tamper - Hand Held) was $25.79 + $16.19 fringe
- added LABORER GROUP 2 (Airtool Operator, Asbestos Abatement (Removal from Floors, Walls, and Ceiling), Bobcat Operator (Clean up/Demolition), Dewatering, Rodman, Skytrak Forklift Operator) $34.77 + $26.66 fringe
- added LABORER GROUP 2 (Concrete Saw (Hand Held/Walk Behind), Grouting) $31.97 + $25.36 fringe
- removed LABORER: Grouting was $22.11 + $17.25 fringe
- removed PLASTERER was $31.97 + $25.36 fringe
- removed PLUMBER was $36.58 + $24.58 fringe
- removed SHEET METAL WORKER (Includes HVAC Duct Installation) was $30.10 + $22.51 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.05 | $30.87 | $68.92 | ASBE0080-002 eff. 02/24/2025 |
| BOILERMAKER | $47.13 | $28.93 | $76.06 | BOIL0667-005 eff. 01/01/2025 |
| BRICK POINTER/CAULKER/CLEANER | $31.65 | $25.56 | $57.21 | BRWV0009-001 eff. 12/01/2022 |
| MASON - STONE | $33.00 | $26.18 | $59.18 | BRWV0015-010 eff. 06/01/2024 |
| CARPENTER (INCLUDING DRYWALL HANGING, SCAFFOLD BUILDER; FLOOR LAYING-CARPET,HARDWOOD, RESILIENT AND VINYL) | $33.05 | $26.50 | $59.55 | CARP0436-011 eff. 12/01/2024 |
| MILLWRIGHT | $37.40 | $26.06 | $63.46 | CARP0443-009 eff. 06/01/2023 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, ROLLER, OILER | $34.71 | $22.05 | $56.76 | ENGI0132-007 eff. 12/01/2024 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, ALL OTHER CRANES | $45.21 | $22.05 | $67.26 | ENGI0132-007 eff. 12/01/2024 |
| POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 | $68.26 | ENGI0132-007 eff. 12/01/2024 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAPACITY OF 100 TONS OR MORE AND HOISTS WITH 30,000 POUND LINE PULL OR MORE | $46.56 | $22.05 | $68.61 | ENGI0132-007 eff. 12/01/2024 |
| IRONWORKER: ORNAMENTAL | $35.19 | $25.66 | $60.85 | IRON0549-006 eff. 12/01/2022 |
| IRONWORKER: REINFORCING | $36.10 | $24.65 | $60.75 | IRON0787-006 eff. 12/01/2025 |
| LABORER (WACKER ROLLER OPERATOR) | $28.02 | $16.80 | $44.82 | LABO0379-019 eff. 12/01/2023 |
| LABORER: CONCRETE SAW (HAND HELD/WALK BEHIND) | $22.76 | $16.75 | $39.51 | LABO0453-003 eff. 12/01/2017 |
| LABORER: ASPHALT RAKER, JACK HAMMER, MOTORIZED BUGGY OPERATOR, WATER BOY | $25.41 | $16.75 | $42.16 | LABO0543-003 eff. 06/01/2020 |
| LABORER: GROUP 2 AIRTOOL OPERATOR, BOBCAT OPERATOR (CLEAN UP/DEMOLITION), DEWATERING, RODMAN, SKYTRAK FORKLIFT OPERATOR | $24.13 | $16.05 | $40.18 | LABO0984-006 eff. 12/01/2023 |
| LABORER: GROUP 1 COMMON OR GENERAL | $24.13 | $16.05 | $40.18 | LABO0984-006 eff. 12/01/2023 |
| PAINTER: DRYWALL FINISHING/TAPING | $30.57 | $20.06 | $50.63 | PAIN0970-007 eff. 12/01/2024 |
| GLAZIER | $32.89 | $13.38 | $46.27 | PAIN1195-002 eff. 12/01/2024 |
| LABORER GROUP 2 (Concrete Saw (Hand Held/Walk Behind), Grouting) | $31.97 | $25.36 | $57.33 | PLAS0926-008 eff. 06/01/2024 |
| LABORER GROUP 2 (Airtool Operator, Asbestos Abatement (Removal from Floors, Walls, and Ceiling), Bobcat Operator (Clean up/Demolition), Dewatering, Rodman, Skytrak Forklift Operator) | $34.77 | $26.66 | $61.43 | PLAS0926-008 eff. 06/01/2024 |
| CEMENT MASON/CONCRETE FINISHER | $34.77 | $26.66 | $61.43 | PLAS0926-008 eff. 06/01/2024 |
| TRUCK DRIVER: SINGLE AND DOUBLE AXLE DUMP TRUCKS | $28.52 | $3.00 | $31.52 | SUWV2012-011 eff. 08/13/2012 |
| ROOFER | $24.28 | $9.32 | $33.60 | SUWV2012-011 eff. 08/13/2012 |
| PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $27.64 | $18.09 | $45.73 | SUWV2012-011 eff. 08/13/2012 |
| PAINTER: BRUSH, ROLLER AND SPRAY | $22.03 | $9.95 | $31.98 | SUWV2012-011 eff. 08/13/2012 |
| OPERATOR: FORKLIFT | $33.09 | $3.00 | $36.09 | SUWV2012-011 eff. 08/13/2012 |
| OPERATOR: EXCAVATOR | $30.31 | $10.81 | $41.12 | SUWV2012-011 eff. 08/13/2012 |
| OPERATOR: BULLDOZER | $30.24 | $10.26 | $40.50 | SUWV2012-011 eff. 08/13/2012 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $22.05 | $8.54 | $30.59 | SUWV2012-011 eff. 08/13/2012 |
| LABORER: MASON TENDER - BRICK | $21.47 | $8.29 | $29.76 | SUWV2012-011 eff. 08/13/2012 |
| LABORER: DEMOLITION | $20.58 | $9.47 | $30.05 | SUWV2012-011 eff. 08/13/2012 |
| LABORER: ASBESTOS ABATEMENT (REMOVAL FROM FLOORS, WALLS, & CEILINGS) | $23.85 | $10.95 | $34.80 | SUWV2012-011 eff. 08/13/2012 |
| IRONWORKER, STRUCTURAL | $26.27 | $15.85 | $42.12 | SUWV2012-011 eff. 08/13/2012 |
| ELECTRICIAN | $28.16 | $15.11 | $43.27 | SUWV2012-011 eff. 08/13/2012 |
| BRICKLAYER | $27.50 | $12.35 | $39.85 | SUWV2012-011 eff. 08/13/2012 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.