West Virginia prevailing wage rates: WV20260047
Building construction in Putnam County.
WV20260047, modification 1, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 0
- changed CEMENT MASON/CONCRETE FINISHER base $32.06 → $32.52 (+$0.46), fringe $21.99 → $22.34 (+$0.35) Same effective date as before (12/01/2024).
2 classifications added, 4 removed or reworded
- removed LABORER (Power Tool Operator) was $23.10 + $16.75 fringe
- removed PLASTERER was $32.52 + $22.34 fringe
- added TRUCK DRIVER: GROUP 2 DUMP TRUCK (UP TO 5 CU. YDS.), WATER TANK TRUCK (STRAIGHT) $29.81 + $22.50 fringe
- added TRUCK DRIVER: GROUP 3 DUMP TRUCK (5 CU. YDS. & OVER), TRACTOR HAUL TRUCK, WATER TANK TRUCK (SEMI) $29.96 + $22.50 fringe
- removed Truck drivers: GROUP 2 was $29.81 + $22.50 fringe
- removed Truck drivers: GROUP 3 was $29.96 + $22.50 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $46.50 | $29.43 | $75.93 | ASBE0002-002 eff. 08/01/2024 |
| BOILERMAKER | $47.13 | $28.93 | $76.06 | BOIL0667-005 eff. 01/01/2025 |
| BRICKLAYER (BRICKLAYER & BRICK POINTER/CAULKER/CLEANER) | $31.65 | $25.56 | $57.21 | BRWV0009-006 eff. 12/01/2022 |
| TILE SETTER | $31.65 | $25.56 | $57.21 | BRWV0009-007 eff. 12/01/2022 |
| MASON - STONE | $31.65 | $25.56 | $57.21 | BRWV0009-008 eff. 12/01/2022 |
| TILE FINISHER | $27.00 | $22.57 | $49.57 | BRWV0015-014 eff. 06/01/2024 |
| CARPENTER (INCLUDING DRYWALL HANGING, FORM WORK, SCAFFOLD BUILDER AND FLOOR LAYING - CARPET, HARDWOOD, RESILIENT AND VINYL) | $33.84 | $25.51 | $59.35 | CARP0439-003 eff. 12/01/2024 |
| MILLWRIGHT | $37.40 | $26.06 | $63.46 | CARP0443-009 eff. 06/01/2023 |
| ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING) | $39.00 | $23.45 | $62.45 | ELEC0466-010 eff. 06/01/2023 |
| POWER EQUIPMENT OPERATOR: GROUP 4 BOBCAT/SKID STEER/SKID LOADER, FARM TYPE TRACTOR, LOADER | $34.71 | $22.05 | $56.76 | ENGI0132-011 eff. 12/01/2024 |
| POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOE, BULLDOZER, EXCAVATOR, FORKLIFT, NON-FARM TYPE TRACTOR, ALL OTHER CRANES, ALL OTHER MECHANICS | $45.21 | $22.05 | $67.26 | ENGI0132-011 eff. 12/01/2024 |
| POWER EQUIPMENT OPERATOR: GROUP 2 OPERATING CRANES AND TOWER CRANES WITH A LIFTING CAPACITY OF 15 TONS AND OVER | $46.21 | $22.05 | $68.26 | ENGI0132-011 eff. 12/01/2024 |
| POWER EQUIPMENT OPERATOR: GROUP 1 ALL FRICTION CRANES, TOWER CRANES AND ALL CRANES WITH 180 FT. OR MORE OF BOOM INCLUDING MAST AND JIBS OR LIFTING CAPACITY OF 100 TONS OR MORE AND HOISTS WITH 30,000 POUND LINE PULL OR MORE, MECHANICS WITH TOOLS WITH 3/4 INCH DRIVE AND BELOW | $46.56 | $22.05 | $68.61 | ENGI0132-011 eff. 12/01/2024 |
| IRONWORKER: ORNAMENTAL | $35.19 | $25.66 | $60.85 | IRON0549-006 eff. 12/01/2022 |
| IRONWORKER (REINFORCING AND STRUCTURAL) | $36.10 | $24.65 | $60.75 | IRON0787-004 eff. 12/01/2025 |
| LABORER: GROUP 2 BOBCAT OPERATOR (CLEAN UP/DEMOLITION), CHIPPING GUNS, CONCRETE SAW (HAND HELD/WALK BEHIND), CONCRETE WORKER, FENCE ERECTION, GRADE CHECKER, JACK HAMMER, MASON TENDER-BRICK, MASON TENDER-CEMENT/CONCRETE, MORTAR MIXER, SCAFFOLD BUILDER (BRICK AND MASONRY), SKYTRAK FORKLIFT OPERATOR, TAMPER (HAND HELD), WACKER ROLLER OPERATOR | $24.78 | $17.25 | $42.03 | LABO1353-006 eff. 12/01/2020 |
| LABORER: GROUP 1 CARPENTER TENDER, COMMON OR GENERAL, DEMOLITION, LANDSCAPE, WATER BOY | $24.16 | $17.25 | $41.41 | LABO1353-006 eff. 12/01/2020 |
| PAINTER (DRYWALL FINISHING/TAPING; BRUSH, ROLLER AND SPRAY) | $30.85 | $17.80 | $48.65 | PAIN0970-008 eff. 12/01/2022 |
| GLAZIER | $32.89 | $13.38 | $46.27 | PAIN1195-002 eff. 12/01/2024 |
| CEMENT MASON/CONCRETE FINISHER | $32.52 | $22.34 | $54.86 | PLAS0926-010 eff. 12/01/2024 |
| PLASTERER (EIFS) | $32.52 | $22.34 | $54.86 | PLAS0926-011 eff. 06/01/2024 |
| CEMENT MASON/CONCRETE FINISHER | $34.77 | $26.66 | $61.43 | PLAS0926-011 eff. 06/01/2024 |
| PIPEFITTER | $38.04 | $39.72 | $77.76 | PLUM0083-004 eff. 07/01/2025 |
| PLUMBER | $41.00 | $37.63 | $78.63 | PLUM0565-004 eff. 07/01/2025 |
| ROOFER | $29.75 | $16.71 | $46.46 | ROOF0034-003 eff. 05/01/2023 |
| SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION) | $32.07 | $27.52 | $59.59 | SHEE0033-013 eff. 06/01/2023 |
| LABORER: PIPELAYER | $23.76 | $10.73 | $34.49 | SUWV2012-045 eff. 08/13/2012 |
| TRUCK DRIVER: GROUP 3 DUMP TRUCK (5 CU. YDS. & OVER), TRACTOR HAUL TRUCK, WATER TANK TRUCK (SEMI) | $29.96 | $22.50 | $52.46 | TEAM0175-005 eff. 10/01/2024 |
| TRUCK DRIVER: GROUP 2 DUMP TRUCK (UP TO 5 CU. YDS.), WATER TANK TRUCK (STRAIGHT) | $29.81 | $22.50 | $52.31 | TEAM0175-005 eff. 10/01/2024 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.