PrevailCrew

Wisconsin prevailing wage rates: WI20260003

Building construction in La Crosse County.

WI20260003, modification 1, published 05/18/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 0

No existing rate changed amount.

7 classifications added, 8 removed or reworded
  • removed Laborer: Asbestos/hazardous material remover (Preparation, Removal and Encapsulation of Hazardous Materials from Non-Mechanical: Systems) was $36.65 + $19.97 fringe
  • added LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER $36.65 + $19.97 fringe
  • removed OPERATOR: Power Equipment: Group 1 was $50.53 + $27.89 fringe
  • removed OPERATOR: Power Equipment: Group 2 was $49.28 + $27.89 fringe
  • removed OPERATOR: Power Equipment: Group 3 was $45.73 + $27.89 fringe
  • removed OPERATOR: Power Equipment: Group 4 was $45.20 + $27.89 fringe
  • removed OPERATOR: Power Equipment: Group 5 was $43.13 + $27.89 fringe
  • removed OPERATOR: Power Equipment: Group 6 was $41.60 + $27.89 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS AND/OR JIB LENGTHS 176 FT OR LONGER $50.53 + $27.89 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOES (EXCAVATORS) WEIGHING 130,000 LBS & OVER; CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF 100 TONS OR LESS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS, AND/OR JIB LENGTHS 175 FT OR LESS; CAISSON RIGS; PILE DRIVER $49.28 + $27.89 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOES (EXCAVATORS) WEIGHING UNDER 130,000 LBS; TRAVELLING CRANE (BRIDGE TYPE); MILLING MACHINE; CONCRETE PAVER OVER 27 E; CONCRETE SPREADER AND DISTRIBUTOR; CONCRETE LASER SCREED; CONCRETE GRINDER AND PLANING MACHINE; SLIPFORM CURB AND GUTTER MACHINE; BORING MACHINE (DIRECTIONAL); DREDGE OPERATOR; SKID RIGS; OVER 46 METER CONCRETE PUMP $45.73 + $27.89 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 4 HYDRAULIC BACKHOE (TRACTOR OR TRUCK MOUNTED); HYDRAULIC CRANE, 10 TONS OR LESS; TRACTOR, BULLDOZER, OR END LOADER (OVER 40 HP); MOTOR PATROL; SCRAPER OPERATOR; BITUMINOUS PLANT AND PAVER OPERATOR; SCREED-MILLING MACHINE; ROLLER OVER 5 TONS; CONCRETE PUMPS 46 METER & UNDER; GROUT PUMPS; ROTEC TYPE MACHINE; HYDRO BLASTER, 10,000 PSI AND OVER; ROTARY DRILL OPERATOR; PERCUSSION DRILLING MACHINE; AIR TRACK DRILL WITH OR WITHOUT INTEGRAL HAMMER; BLASTER; BORING MACHINE (VERTICAL OR HORIZONTAL); SIDE BOOM; TRENCHER, WHEEL TYPE OR CHAIN TYPE HAVING 8 INCH OR LARGER BUCKET; RAIL LEVELING MACHINE (RAILROAD); TIE PLACER; TIE EXTRACTOR; TIE TAMPER; STONE LEVELER; STRADDLE CARRIER; MATERIAL HOISTS; STACK HOIST; MAN HOISTS; MECHANIC AND WELDER; OFF ROAD MATERIAL HAULERS $45.20 + $27.89 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 5 TRACTOR, BULLDOZER, OR ENDLOADER (UNDER 40 HP); TAMPERS -COMPACTORS, RIDING TYPE; STUMP CHIPPER, LARGE; ROLLER, RUBBER TIRE; BACKFILLER; TRENCHER, CHAIN TYPE (BUCKET UNDER 8 INCH); CONCRETE AUTO BREAKER, LARGE; CONCRETE FINISHING MACHINE (ROAD TYPE); CONCRETE BATCH HOPPER; CONCRETE CONVEYOR SYSTEMS; CONCRETE MIXERS, 14S OR OVER; PUMPS, SCREW TYPE AND GYPSUM); HYDROHAMMERS, SMALL; BROOMS AND SWEEEPRS; LIFT SLAB MACHINE; ROLLER UNDER 5 TONS; INDUSTRIAL LOCOMOTIVES; FIREMAN (PILE DRIVERS AND DERRICKS); PUMPS (WELL POINTS); HOISTS, AUTOMATIC; A-FRAMES AND WINCH TRUCKS; HOISTS (TUGGERS); BOATS (TUG, SAFETY, WORK BARGES AND LAUNCHES); ASSISTANT ENGINEER HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR $43.13 + $27.89 fringe
  • added POWER EQUIPMENT OPERATOR: GROUP 6 SHOULDERING MACHINE OPERATOR; FARM OR INDUSTRIAL TRACTOR MOUNTED EQUIPMENT; POST HOLE DIGGER; AUGER (VERTICAL AND HORIZONTAL); SKID STEER LOADER WITH OR WITHOUT ATTACHMENTS; ROBOTIC TOOL CARRIER WITH OR WITHOUT ATTACHMENTS; POWER PACK VIBRATORY/ULTRA SOUND DRIVER AND EXTRACTOR; FIREMAN (ASPHALT PLANTS); SCREED OPERATOR; STONE CRUSHERS AND SCREENING PLANTS; AIR, ELECTRIC, HYDRAULIC JACKS (SLIP FORM); PRESTRESS MACHINES; AIR COMPRESSOR, 400 CFM OR OVER; REFRIGERATION PLANT/FREESE MACHINE; BOILER OPERATORS (TEMPORARY HEAT); FORKLIFTS; WELDING MACHINES; GENERATORS; PUMPS OVER 3"; COMPRESSORS, UNDER 400 CFM; HEATERS, MECHANICAL; COMBINATION SMALL EQUIPMENT OPERATOR; WINCHES, SMALL ELECTRIC; OILER; GREASER; ROTARY DRILL TENDER; CONVEYOR; ELEVATOR OPERATOR $41.60 + $27.89 fringe
  • removed TRUCK DRIVER: 1 & 2 Axles was $39.57 + $28.70 fringe

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

WI20260003 wage rates
ClassificationBaseFringeTotalRate ID
ASBESTOS REMOVAL WORKER/HAZARDOUS MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT)$45.88$38.15$84.03ASBE0019-001
eff. 06/01/2025
BOILERMAKER (BOILERMAKER)$46.52$34.63$81.15BOIL0107-001
eff. 01/01/2025
BRICKLAYER & TILE SETTER$40.09$28.10$68.19BRWI0001-004
eff. 06/01/2025
MILLWRIGHT$42.00$28.85$70.85CARP1056-001
eff. 06/01/2024
SOFT FLOOR LAYER$41.43$29.99$71.42CARP1143-005
eff. 06/01/2025
CARPENTER (INCLUDING ACOUSTICAL WORK, DRYWALL HANGING, PILEDRIVERMAN; EXCLUDING BATT INSULATION)$41.43$29.99$71.42CARP1143-005
eff. 06/01/2025
ELECTRICIAN$44.29$25.21$69.50ELEC0014-004
eff. 05/25/2025
ELECTRICIANS: TELEDATA SYSTEM INSTALLER/TECHNICIAN. LOW VOLTAGE CONSTRUCTION, INSTALLATION, MAINTENANCE AND REMOVAL OF TELEDATA FACILITIES (VOICE, DATA, AND VIDEO) INCLUDING OUTSIDE PLANT, TELEPHONE AND DATA INSIDE WIRE, INTERCONNECT, TERMINAL EQUIPMENT, CENTRAL OFFICES, PABX, FIBER OPTIC CABLE AND EQUIPMENT, MICRO WAVES, V-SAT, BYPASS, CATV, WAN (WIDE AREA NETWORKS), LAN (LOCAL AREA NETWORKS), AND ISDN (INTEGRATED SYSTEMS DIGITAL NETWORK)$31.17$20.08$51.25ELEC0014-005
eff. 05/25/2025
ELEVATOR MECHANIC.
Scope and notes

FOOTNOTE: A. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE AS VACATION PAY FOR EMPLOYEES WITH MORE THAN 5 YEARS OR MORE OF SERVICE, AND 6% FOR LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY

$65.17$38.44$103.61ELEV0132-001
eff. 01/01/2025
POWER EQUIPMENT OPERATOR: GROUP 6 SHOULDERING MACHINE OPERATOR; FARM OR INDUSTRIAL TRACTOR MOUNTED EQUIPMENT; POST HOLE DIGGER; AUGER (VERTICAL AND HORIZONTAL); SKID STEER LOADER WITH OR WITHOUT ATTACHMENTS; ROBOTIC TOOL CARRIER WITH OR WITHOUT ATTACHMENTS; POWER PACK VIBRATORY/ULTRA SOUND DRIVER AND EXTRACTOR; FIREMAN (ASPHALT PLANTS); SCREED OPERATOR; STONE CRUSHERS AND SCREENING PLANTS; AIR, ELECTRIC, HYDRAULIC JACKS (SLIP FORM); PRESTRESS MACHINES; AIR COMPRESSOR, 400 CFM OR OVER; REFRIGERATION PLANT/FREESE MACHINE; BOILER OPERATORS (TEMPORARY HEAT); FORKLIFTS; WELDING MACHINES; GENERATORS; PUMPS OVER 3"; COMPRESSORS, UNDER 400 CFM; HEATERS, MECHANICAL; COMBINATION SMALL EQUIPMENT OPERATOR; WINCHES, SMALL ELECTRIC; OILER; GREASER; ROTARY DRILL TENDER; CONVEYOR; ELEVATOR OPERATOR
Scope and notes

HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR

$41.60$27.89$69.49ENGI0139-002
eff. 06/02/2025
POWER EQUIPMENT OPERATOR: GROUP 5 TRACTOR, BULLDOZER, OR ENDLOADER (UNDER 40 HP); TAMPERS -COMPACTORS, RIDING TYPE; STUMP CHIPPER, LARGE; ROLLER, RUBBER TIRE; BACKFILLER; TRENCHER, CHAIN TYPE (BUCKET UNDER 8 INCH); CONCRETE AUTO BREAKER, LARGE; CONCRETE FINISHING MACHINE (ROAD TYPE); CONCRETE BATCH HOPPER; CONCRETE CONVEYOR SYSTEMS; CONCRETE MIXERS, 14S OR OVER; PUMPS, SCREW TYPE AND GYPSUM); HYDROHAMMERS, SMALL; BROOMS AND SWEEEPRS; LIFT SLAB MACHINE; ROLLER UNDER 5 TONS; INDUSTRIAL LOCOMOTIVES; FIREMAN (PILE DRIVERS AND DERRICKS); PUMPS (WELL POINTS); HOISTS, AUTOMATIC; A-FRAMES AND WINCH TRUCKS; HOISTS (TUGGERS); BOATS (TUG, SAFETY, WORK BARGES AND LAUNCHES); ASSISTANT ENGINEER HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR$43.13$27.89$71.02ENGI0139-002
eff. 06/02/2025
POWER EQUIPMENT OPERATOR: GROUP 4 HYDRAULIC BACKHOE (TRACTOR OR TRUCK MOUNTED); HYDRAULIC CRANE, 10 TONS OR LESS; TRACTOR, BULLDOZER, OR END LOADER (OVER 40 HP); MOTOR PATROL; SCRAPER OPERATOR; BITUMINOUS PLANT AND PAVER OPERATOR; SCREED-MILLING MACHINE; ROLLER OVER 5 TONS; CONCRETE PUMPS 46 METER & UNDER; GROUT PUMPS; ROTEC TYPE MACHINE; HYDRO BLASTER, 10,000 PSI AND OVER; ROTARY DRILL OPERATOR; PERCUSSION DRILLING MACHINE; AIR TRACK DRILL WITH OR WITHOUT INTEGRAL HAMMER; BLASTER; BORING MACHINE (VERTICAL OR HORIZONTAL); SIDE BOOM; TRENCHER, WHEEL TYPE OR CHAIN TYPE HAVING 8 INCH OR LARGER BUCKET; RAIL LEVELING MACHINE (RAILROAD); TIE PLACER; TIE EXTRACTOR; TIE TAMPER; STONE LEVELER; STRADDLE CARRIER; MATERIAL HOISTS; STACK HOIST; MAN HOISTS; MECHANIC AND WELDER; OFF ROAD MATERIAL HAULERS
Scope and notes

HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR

$45.20$27.89$73.09ENGI0139-002
eff. 06/02/2025
POWER EQUIPMENT OPERATOR: GROUP 3 BACKHOES (EXCAVATORS) WEIGHING UNDER 130,000 LBS; TRAVELLING CRANE (BRIDGE TYPE); MILLING MACHINE; CONCRETE PAVER OVER 27 E; CONCRETE SPREADER AND DISTRIBUTOR; CONCRETE LASER SCREED; CONCRETE GRINDER AND PLANING MACHINE; SLIPFORM CURB AND GUTTER MACHINE; BORING MACHINE (DIRECTIONAL); DREDGE OPERATOR; SKID RIGS; OVER 46 METER CONCRETE PUMP
Scope and notes

HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR

$45.73$27.89$73.62ENGI0139-002
eff. 06/02/2025
POWER EQUIPMENT OPERATOR: GROUP 2 BACKHOES (EXCAVATORS) WEIGHING 130,000 LBS & OVER; CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF 100 TONS OR LESS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS, AND/OR JIB LENGTHS 175 FT OR LESS; CAISSON RIGS; PILE DRIVER
Scope and notes

HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR

$49.28$27.89$77.17ENGI0139-002
eff. 06/02/2025
POWER EQUIPMENT OPERATOR: GROUP 1 CRANES, TOWER CRANES AND DERRICKS WITH OR WITHOUT ATTACHMENTS WITH A LIFTING CAPACITY OF OVER 100 TONS; CRANES, TOWER CRANES, AND DERRICKS WITH BOOM, LEADS AND/OR JIB LENGTHS 176 FT OR LONGER
Scope and notes

HAZARDOUS WASTE PREMIUMS: EPA LEVEL "A" PROTECTION: $3.00 PER HOUR EPA LEVEL "B" PROTECTION: $2.00 PER HOUR EPA LEVEL "C" PROTECTION: $1.00 PER HOUR

$50.53$27.89$78.42ENGI0139-002
eff. 06/02/2025
IRONWORKER$44.00$32.66$76.66IRON0383-002
eff. 06/01/2025
LABORER: ASBESTOS/HAZARDOUS MATERIAL REMOVER
Scope and notes

NOTE: MASON TENDER $1.00 OVER GENERAL LABORER SCALE; PIPELAYER $1.00 OVER GENERAL LABORER SCALE

$36.65$19.97$56.62LABO0140-001
eff. 06/01/2025
LABORER, GENERAL
Scope and notes

NOTE: MASON TENDER $1.00 OVER GENERAL LABORER SCALE; PIPELAYER $1.00 OVER GENERAL LABORER SCALE

$37.70$19.97$57.67LABO0140-001
eff. 06/01/2025
PAINTER$22.99$13.29$36.28PAIN0259-005
eff. 05/01/2017
PLASTERER$39.75$25.10$64.85PLAS0599-006
eff. 06/01/2025
CEMENT MASON/CONCRETE FINISHER$37.25$27.84$65.09PLAS0599-006
eff. 06/01/2025
PLUMBER/PIPEFITTER (INCLUDING HVAC WORK)$50.94$25.98$76.92PLUM0434-001
eff. 06/01/2025
SPRINKLER FITTER$51.68$29.73$81.41SFWI0669-002
eff. 04/01/2025
SHEET METAL WORKER (INCLUDING HVAC DUCT WORK AND TECHNICIANS)$45.63$29.02$74.65SHEE0018-008
eff. 06/01/2025
TILE & MARBLE FINISHER$13.89$8.33$22.22SUWI2002-004
eff. 01/23/2002
ROOFER$18.01$3.28$21.29SUWI2002-004
eff. 01/23/2002
LABORERS: LANDSCAPE$8.73
EO 13658 minimum $13.65 may apply
$4.90$13.63SUWI2002-004
eff. 01/23/2002
LABORERS: (CONCRETE WORKERS)$16.34$3.59$19.93SUWI2002-004
eff. 01/23/2002
ASBESTOS WORKER/HEAT AND FROST INSULATOR$25.36$8.37$33.73SUWI2002-004
eff. 01/23/2002
TRUCK DRIVER (3 OR MORE AXLES)$39.72$28.70$68.42TEAM0662-003
eff. 06/01/2025

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 1 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.