Wisconsin prevailing wage rates: WI20260037
Residential construction in Eau Claire, La Crosse, Pierce, St Croix Counties.
WI20260037, modification 2, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| CARPENTER (PIERCE & ST CROIX COUNTIES (WEST OF HWY 65)) | $46.00 | $20.84 | $66.84 | CARP0068-014 eff. 05/05/2025 |
| CARPENTER: INCLUDING ACCOUSTICAL WORK & DRYWALL HANGING (EAU CLAIRE, PIERCE (E. OF HWY. 29 & 65) AND ST. CROIX (E. OF HWY. 65) COUNTIES) | $30.21 | $22.26 | $52.47 | CARP1074-005 eff. 06/01/2025 |
| CARPENTER (LA CROSSE COUNTY) | $30.21 | $22.26 | $52.47 | CARP1143-004 eff. 06/01/2025 |
| ELECTRICIAN | $44.29 | $25.21 | $69.50 | ELEC0014-003 eff. 05/25/2025 |
| OPERATOR: POWER EQUIPMENT (BULLDOZER UNDER 40 H.P.; ROLLER 5 TONS AND UNDER; RUBBER TIRE ROLLER) | $44.62 | $27.35 | $71.97 | ENGI0139-006 eff. 06/01/2025 |
| OPERATOR: POWER EQUIPMENT (BULLDOZER OVER 40 H.P.; ROLLER OVER 5 TONS) | $45.67 | $27.35 | $73.02 | ENGI0139-006 eff. 06/01/2025 |
| OPERATOR: POWER EQUIPMENT (BACKHOE/EXCAVATOR UNDER 130,000 LBS.) | $44.92 | $27.35 | $72.27 | ENGI0139-006 eff. 06/01/2025 |
| OPERATOR: POWER EQUIPMENT (BACKHOE/EXCAVATOR 130,000 LBS. AND OVER) | $45.67 | $27.35 | $73.02 | ENGI0139-006 eff. 06/01/2025 |
| LABORER: COMMON OR GENERAL; MASON TENDER - BRICK (LA CROSSE COUNTY) | $23.90 | $16.48 | $40.38 | LABO0140-006 eff. 06/01/2025 |
| LABORER: COMMON OR GENERAL; MASON TENDER - BRICK (EAU CLAIRE, PIERCE & ST. CROIX COUNTIES) | $23.90 | $16.48 | $40.38 | LABO0268-004 eff. 06/01/2025 |
| PLUMBER | $41.29 | $25.98 | $67.27 | PLUM0434-003 eff. 06/01/2025 |
| ROOFER (EAU CLAIRE & LA CROSSE COUNTIES) | $33.73 | $16.34 | $50.07 | ROOF0096-011 eff. 11/01/2025 |
ROOFER (PIERCE & ST. CROIX COUNTIES).Scope and notesFOOTNOTE: PAID HOLIDAY - LABOR DAY | $48.32 | $25.63 | $73.95 | ROOF0096-017 eff. 05/05/2025 |
| SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (LA CROSSE COUNTY) | $45.63 | $29.02 | $74.65 | SHEE0018-011 eff. 06/01/2025 |
| SHEET METAL WORKER: INCLUDING HVAC DUCT INSTALLATION (EAU CLAIRE, PIERCE & ST. CROIX COUNTIES) | $36.50 | $30.29 | $66.79 | SHEE0018-027 eff. 06/01/2025 |
| OPERATOR: LOADER | $25.70 | $9.58 | $35.28 | SUWI2012-021 eff. 04/04/2012 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $24.95 | $9.05 | $34.00 | SUWI2012-021 eff. 04/04/2012 |
| CEMENT MASON/CONCRETE FINISHER | $24.37 | $7.29 | $31.66 | SUWI2012-021 eff. 04/04/2012 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.