Nevada Davis-Bacon wage rates
58 current general wage determinations cover 17 Nevada counties. Find your county and construction type, then open the determination for base, fringe and total per trade. Latest modification published 11/05/2026.
Source: Nevada general wage determinations, U.S. Department of Labor. Official list on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
Find the determination for your county
All Nevada determinations
| Determination | Construction types | Counties | Modification | Published | Changes |
|---|---|---|---|---|---|
| NV20260001 50 classifications | Building, Heavy, Highway | Clark, Lincoln, Nye | 2 | 05/26/2026 | 25 |
| NV20260002 50 classifications | Building, Heavy, Highway | Clark, Lincoln, Nye | 3 | 06/01/2026 | 34 |
| NV20260041 16 classifications | Residential | Carson City | 2 | 05/18/2026 | – |
| NV20260042 21 classifications | Residential | Clark | 2 | 05/18/2026 | – |
| NV20260043 16 classifications | Residential | Storey | 2 | 05/18/2026 | – |
| NV20260044 16 classifications | Residential | Washoe | 2 | 05/18/2026 | – |
| NV20260045 10 classifications | Residential | Churchill, Douglas, Elko, Esmeralda, Eureka, Humboldt, Lander, Lincoln and 5 more | 1 | 05/18/2026 | – |
| NV20260060 87 classifications | Heavy | Churchill | 2 | 11/05/2026 | 105 |
| NV20260061 87 classifications | Heavy | Elko | 2 | 11/05/2026 | 105 |
| NV20260062 88 classifications | Heavy | Eureka | 2 | 11/05/2026 | 106 |
| NV20260063 87 classifications | Heavy | Humboldt | 2 | 11/05/2026 | 105 |
| NV20260064 87 classifications | Heavy | Lander | 2 | 11/05/2026 | 105 |
| NV20260065 106 classifications | Heavy | Lincoln | 3 | 11/05/2026 | 136 |
| NV20260066 87 classifications | Heavy | Pershing | 2 | 11/05/2026 | 105 |
| NV20260067 87 classifications | Heavy | White Pine | 2 | 11/05/2026 | 105 |
| NV20260068 88 classifications | Heavy | Douglas | 2 | 11/05/2026 | 106 |
| NV20260069 87 classifications | Heavy | Lyon | 2 | 11/05/2026 | 105 |
| NV20260070 87 classifications | Heavy | Carson City | 2 | 11/05/2026 | 107 |
| NV20260071 106 classifications | Heavy | Clark | 3 | 11/05/2026 | 141 |
| NV20260072 87 classifications | Heavy | Storey | 2 | 11/05/2026 | 105 |
| NV20260073 83 classifications | Heavy | Washoe | 2 | 11/05/2026 | 96 |
| NV20260074 106 classifications | Heavy | Nye | 3 | 11/05/2026 | 139 |
| NV20260075 106 classifications | Heavy | Esmeralda | 2 | 11/05/2026 | 139 |
| NV20260076 87 classifications | Heavy | Mineral | 2 | 11/05/2026 | 105 |
| NV20260077 100 classifications | Building | Churchill | 2 | 11/05/2026 | 115 |
| NV20260078 100 classifications | Building | Douglas | 2 | 11/05/2026 | 114 |
| NV20260079 101 classifications | Building | Humboldt | 2 | 11/05/2026 | 115 |
| NV20260080 107 classifications | Building | Lincoln | 3 | 11/05/2026 | 131 |
| NV20260081 101 classifications | Building | Lyon | 2 | 11/05/2026 | 115 |
| NV20260082 107 classifications | Building | Nye | 3 | 11/05/2026 | 130 |
| NV20260083 100 classifications | Building | Elko | 2 | 11/05/2026 | 115 |
| NV20260084 102 classifications | Building | Eureka | 2 | 11/05/2026 | 116 |
| NV20260085 107 classifications | Building | Esmeralda | 2 | 11/05/2026 | 131 |
| NV20260086 100 classifications | Building | Lander | 2 | 11/05/2026 | 114 |
| NV20260087 101 classifications | Building | Mineral | 2 | 11/05/2026 | 115 |
| NV20260088 100 classifications | Building | Pershing | 2 | 11/05/2026 | 115 |
| NV20260089 100 classifications | Building | White Pine | 2 | 11/05/2026 | 115 |
| NV20260090 100 classifications | Building | Carson City | 2 | 11/05/2026 | 114 |
| NV20260091 111 classifications | Building | Clark | 3 | 11/05/2026 | 132 |
| NV20260092 101 classifications | Building | Storey | 2 | 11/05/2026 | 116 |
| NV20260093 103 classifications | Building | Washoe | 2 | 11/05/2026 | 114 |
| NV20260094 61 classifications | Highway | Churchill | 2 | 11/05/2026 | 78 |
| NV20260095 63 classifications | Highway | Douglas | 2 | 11/05/2026 | 80 |
| NV20260096 63 classifications | Highway | Humboldt | 2 | 11/05/2026 | 80 |
| NV20260097 63 classifications | Highway | Lander | 2 | 11/05/2026 | 80 |
| NV20260098 62 classifications | Highway | Lyon | 2 | 11/05/2026 | 79 |
| NV20260099 61 classifications | Highway | Mineral | 2 | 11/05/2026 | 78 |
| NV20260100 96 classifications | Highway | Nye | 3 | 11/05/2026 | 126 |
| NV20260101 61 classifications | Highway | Pershing | 2 | 11/05/2026 | 78 |
| NV20260102 63 classifications | Highway | White Pine | 2 | 11/05/2026 | 80 |
| NV20260103 63 classifications | Highway | Elko | 2 | 11/05/2026 | 80 |
| NV20260104 63 classifications | Highway | Eureka | 2 | 11/05/2026 | 80 |
| NV20260105 95 classifications | Highway | Esmeralda | 2 | 11/05/2026 | 125 |
| NV20260106 96 classifications | Highway | Lincoln | 3 | 11/05/2026 | 126 |
| NV20260107 63 classifications | Highway | Carson City | 2 | 11/05/2026 | 80 |
| NV20260108 94 classifications | Highway | Clark | 3 | 11/05/2026 | 124 |
| NV20260109 63 classifications | Highway | Storey | 2 | 11/05/2026 | 80 |
| NV20260110 74 classifications | Highway | Washoe | 2 | 11/05/2026 | 87 |
Rate changes in the latest modifications
- changed NV20260060 Boilermaker: Journeyman base $76.62 → $79.07 (+$2.45), fringe $0.00 → $0.00 Same effective date as before (10/01/2025).
- changed NV20260060 Cement Mason: Journeyman base $43.06 → $46.47 (+$3.41), fringe $13.86 → $14.45 (+$0.59) Same effective date as before (10/01/2025).
- changed NV20260060 Electrician-Lineman: Equipment Specialist base $54.50 → $55.59 (+$1.09), fringe $22.88 → $23.04 (+$0.16) Same effective date as before (10/01/2025).
- changed NV20260060 Electrician-Lineman: Groundman base $41.68 → $42.51 (+$0.83), fringe $22.23 → $22.37 (+$0.14) Same effective date as before (10/01/2025).
- changed NV20260060 Electrician-Lineman: Lineman base $72.26 → $74.43 (+$2.17), fringe $26.05 → $26.76 (+$0.71) Same effective date as before (10/01/2025).
- changed NV20260060 Electrician-Neon Sign: Journeyman base $63.15 → $65.17 (+$2.02), fringe $0.00 → $0.00 Same effective date as before (10/01/2025).
- changed NV20260060 Electrician-Wireman: Cable Splicer base $55.78 → $59.80 (+$4.02), fringe $30.66 → $31.81 (+$1.15) Same effective date as before (10/01/2025).
- changed NV20260060 Electrician-Wireman: Wireman base $48.50 → $52.00 (+$3.50), fringe $29.99 → $31.81 (+$1.82) Same effective date as before (10/01/2025).
- changed NV20260060 Flagperson: Journeyman base $33.58 → $37.58 (+$4.00), fringe $17.58 → $17.83 (+$0.25) Same effective date as before (10/01/2025).
- changed NV20260060 Highway Stripers: Journeyman base $38.20 → $41.20 (+$3.00), fringe $17.58 → $17.83 (+$0.25) Same effective date as before (10/01/2025).
- changed NV20260060 Laborers: Furniture Mover base $31.79 → $34.79 (+$3.00), fringe $17.58 → $17.83 (+$0.25) Same effective date as before (10/01/2025).
- changed NV20260060 Laborers: Landscape base $30.29 → $33.29 (+$3.00), fringe $17.58 → $17.83 (+$0.25) Same effective date as before (10/01/2025).
- changed NV20260060 Lubrication and Service Engineer: Lubrication and Service Engineer (mobile and grease rack) base $43.33 → $52.58 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers Steel Fabricator & Erector: Group 1 Oiler base $45.48 → $54.73 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers Steel Fabricator & Erector: Group 1 Truck Crane Oiler base $47.44 → $56.69 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers Steel Fabricator & Erector: Group 2 (Cranes over 45 tons up to and including 100 tons; Derrick, 100 tons and under; S… base $52.10 → $61.35 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers Steel Fabricator & Erector: Group 2 Oiler base $45.27 → $54.52 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers Steel Fabricator & Erector: Group 2 Truck Crane Oiler base $47.19 → $56.44 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers Steel Fabricator & Erector: Group 3 (Cranes, 45 tons and under; Self-Propelled Boom Type Lifting Device, 45 tons and … base $50.86 → $60.11 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers Steel Fabricator & Erector: Group 3 Hydraulic base $46.64 → $55.89 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers Steel Fabricator & Erector: Group 3 Oiler base $45.05 → $54.30 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers Steel Fabricator & Erector: Group 3 Truck Crane Oiler base $46.97 → $56.22 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers Steel Fabricator & Erector: Group 5 (Boom Cat) base $48.03 → $57.28 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers-Cranes & Piledriver: Group 1 (Derrick Barge Pedestal Mounted over 100 tons; Clamshells over 7 cu. yds.; Self-Propelle… base $53.08 → $62.23 (+$9.15), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers-Cranes & Piledriver: Group 1 Oiler base $45.68 → $54.95 (+$9.27), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers-Cranes & Piledriver: Group 1 Truck Crane Oiler base $47.57 → $56.87 (+$9.30), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers-Cranes & Piledriver: Group 2 Oiler base $45.50 → $54.75 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers-Cranes & Piledriver: Group 2 Truck Crane Oiler base $47.41 → $56.66 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers-Cranes & Piledriver: Group 3 (Derrick Barge Pedestal mounted under 45 tons; Self-Propelled Boom Type Lifting Device 4… base $50.09 → $59.34 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers-Cranes & Piledriver: Group 3 Oiler base $45.27 → $54.52 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers-Cranes & Piledriver: Group 3 Truck Crane Oiler base $47.19 → $56.44 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers-Cranes & Piledriver: Group 4 (Assistant Operator in lieu of Assistant to Engineer; Forklift, 10 tons and over; Heavy … base $48.58 → $57.83 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers-Cranes & Piledriver: Group 6 (Deck Engineer) base $44.19 → $53.44 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers-Cranes & Piledriver: Group 8 (Deckhand, Fireman) base $44.44 → $53.69 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers: Group 11B (Holland Loader or similar or Loader (over 18 cu. yds.)) base $47.47 → $56.72 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Operating Engineers: Group 1A (Oiler (Construction); Partsman (heavy duty repair shop parts room when needed)) base $41.07 → $50.32 (+$9.25), fringe $34.85 → $29.60 (−$5.25) Same effective date as before (10/01/2025).
- changed NV20260060 Painter: Brush/Roller Painter base $39.43 → $42.10 (+$2.67), fringe $16.71 → $17.04 (+$0.33) Same effective date as before (10/01/2025).
- changed NV20260060 Painter: Paperhanger base $42.19 → $45.05 (+$2.86), fringe $16.71 → $17.04 (+$0.33) Same effective date as before (10/01/2025).
- changed NV20260060 Painter: Protective Coating - Application Brush base $41.93 → $45.10 (+$3.17), fringe $16.71 → $17.04 (+$0.33) Same effective date as before (10/01/2025).
- changed NV20260060 Painter: Protective Coating - Application Industrial Spray base $43.93 → $47.10 (+$3.17), fringe $16.71 → $17.04 (+$0.33) Same effective date as before (10/01/2025).