Nevada prevailing wage rates: NV20260002
Building, Heavy, Highway construction in Clark, Lincoln, Nye Counties.
NV20260002, modification 3, published 06/01/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 2
- changed ASBESTOS/INSULATOR WORKER: MECHANIC base $62.85 → $67.19 (+$4.34), fringe $26.75 → $19.88 (−$6.87) Now listed under rate group ASBE0135-004, effective 10/01/2025 (was PLUM0525-007, effective 10/01/2025).
- changed BOILERMAKER: BLACKSMITH base $49.66 → $44.31 (−$5.35), fringe $31.50 → $28.96 (−$2.54) Now listed under rate group BOIL0092-006, effective 10/01/2024 (was ELEC0396-004, effective 10/01/2025).
- changed BRICKLAYER base $52.44 → $52.79 (+$0.35), fringe $18.79 → $20.89 (+$2.10) Same effective date as before (10/01/2025).
- changed CARPENTER base $64.37 → $52.12 (−$12.25), fringe $28.81 → $28.08 (−$0.73) Now listed under rate group CARP1977-007, effective 10/01/2025 (was ELEC0357-005, effective 10/01/2025).
- changed CEMENT MASON base $62.85 → $43.27 (−$19.58), fringe $26.75 → $29.66 (+$2.91) Now listed under rate group PLAS0797-004, effective 10/01/2025 (was PLUM0525-007, effective 10/01/2025).
- changed ELECTRICIAN base $66.73 → $64.37 (−$2.36), fringe $30.01 → $28.81 (−$1.20) Now listed under rate group ELEC0357-005, effective 10/01/2025 (was SHEE0088-003, effective 10/01/2025).
- changed ELECTRICIAN: CABLE SPLICER base $62.85 → $61.22 (−$1.63), fringe $26.75 → $28.70 (+$1.95) Now listed under rate group ELEC0357-005, effective 10/01/2025 (was PLUM0525-007, effective 10/01/2025).
- changed ELECTRICIAN: COMMUNICATION TECHNICIAN ONLY base $39.74 → $64.37 (+$24.63), fringe $12.42 → $28.81 (+$16.39) Now listed under rate group ELEC0357-005, effective 10/01/2025 (was ROOF0162-003, effective 10/01/2025).
- changed IRONWORKER base $56.69 → $55.06 (−$1.63), fringe $28.62 → $37.26 (+$8.64) Now listed under rate group IRON0118-014, effective 10/01/2025 (was SFNV0669-003, effective 10/01/2025).
- changed LABORER: BULLGANG, MUCKER, TRACKMAN base $64.37 → $46.44 (−$17.93), fringe $28.81 → $27.27 (−$1.54) Now listed under rate group LABO0872-010, effective 10/01/2025 (was ELEC0357-005, effective 10/01/2025).
- changed LABORER: MINER-TUNNEL HARDROCK base $52.14 → $46.69 (−$5.45), fringe $24.18 → $27.27 (+$3.09) Now listed under rate group LABO0872-010, effective 10/01/2025 (was PAIN0159-002, effective 10/01/2025).
- changed LABORER: SHAFT, RAISE, STOPE MINER base $52.14 → $47.69 (−$4.45), fringe $24.18 → $27.27 (+$3.09) Now listed under rate group LABO0872-010, effective 10/01/2025 (was PAIN0159-002, effective 10/01/2025).
- changed LINE CONSTRUCTION: GROUNDMAN base $47.69 → $49.66 (+$1.97), fringe $27.27 → $31.50 (+$4.23) Now listed under rate group ELEC0396-004, effective 10/01/2025 (was LABO0872-010, effective 10/01/2025).
- changed LINE CONSTRUCTION: LINEMAN base $46.69 → $62.08 (+$15.39), fringe $27.27 → $31.99 (+$4.72) Now listed under rate group ELEC0396-004, effective 10/01/2025 (was LABO0872-010, effective 10/01/2025).
- changed MILLWRIGHT base $43.27 → $54.16 (+$10.89), fringe $29.66 → $27.84 (−$1.82) Now listed under rate group CARP1607-006, effective 10/01/2025 (was PLAS0797-004, effective 10/01/2025).
- changed PAINTER, SPRAY AND PAPERHANGER SIGN base $46.44 → $52.14 (+$5.70), fringe $27.27 → $24.18 (−$3.09) Now listed under rate group PAIN0159-002, effective 10/01/2025 (was LABO0872-010, effective 10/01/2025).
- changed PAINTER, TAPER, FLUSHER AND DETAILER base $62.08 → $52.14 (−$9.94), fringe $31.99 → $24.18 (−$7.81) Now listed under rate group PAIN0159-002, effective 10/01/2025 (was ELEC0396-004, effective 10/01/2025).
- changed PAINTER: FLOORCOVERER, CARPET, LINOLEUM AND TILE GLAZIER base $52.79 → $52.40 (−$0.39), fringe $20.89 → $24.18 (+$3.29) Now listed under rate group PAIN0159-002, effective 10/01/2025 (was BRNV0013-003, effective 10/01/2025).
- changed PIPEFITTER: INCLUDING INERT GAS WELDER base $52.40 → $62.85 (+$10.45), fringe $24.18 → $26.75 (+$2.57) Now listed under rate group PLUM0525-007, effective 10/01/2025 (was PAIN0159-002, effective 10/01/2025).
- changed PLUMBER: INCLUDLING LEAD BURNER base $67.19 → $62.85 (−$4.34), fringe $19.88 → $26.75 (+$6.87) Now listed under rate group PLUM0525-007, effective 10/01/2025 (was ASBE0135-004, effective 10/01/2025).
- changed REFRIGERATION MECHANIC base $61.22 → $62.85 (+$1.63), fringe $28.70 → $26.75 (−$1.95) Now listed under rate group PLUM0525-007, effective 10/01/2025 (was ELEC0357-005, effective 10/01/2025).
- changed ROOFER (INCLUDING WATERPROOFING) base $37.07 → $39.74 (+$2.67), fringe $14.74 → $12.42 (−$2.32) Now listed under rate group ROOF0162-003, effective 10/01/2025 (was BRNV0013-003, effective 10/01/2025).
- changed SHEET METAL WORKER base $62.08 → $66.73 (+$4.65), fringe $31.99 → $30.01 (−$1.98) Now listed under rate group SHEE0088-003, effective 10/01/2025 (was ELEC0396-004, effective 10/01/2025).
- changed SPRINKLER FITTER base $44.31 → $56.69 (+$12.38), fringe $28.96 → $28.62 (−$0.34) Now listed under rate group SFNV0669-003, effective 10/01/2025 (was BOIL0092-006, effective 10/01/2024).
- changed TILE FINISHER base $52.44 → $37.07 (−$15.37), fringe $18.79 → $14.74 (−$4.05) Same effective date as before (10/01/2025).
- changed TILE SETTER base $69.43 → $49.74 (−$19.69), fringe $38.44 → $18.79 (−$19.65) Now listed under rate group BRNV0013-003, effective 10/01/2025 (was ELEV0018-003, effective 01/01/2025).
4 classifications added, 4 removed or reworded
- removed CAULKER was $54.16 + $27.84 fringe
- added ELEVATOR MACHANIC $69.43 + $38.44 fringe
- removed LINE CONSTRUCTION (HEAVY EQUIPMENT OPERATOR) was $49.74 + $18.79 fringe
- added LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR $62.08 + $31.99 fringe
- added MARBLE SETTER $52.44 + $18.79 fringe
- removed PAINTER was $52.12 + $28.08 fringe
- removed PLASTERER was $55.06 + $37.26 fringe
- added TERRAZZO WORKER/SETTER $52.44 + $18.79 fringe
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
ASBESTOS/INSULATOR WORKER: MECHANICScope and notes(ZONE PAY (0-19 MILES, LAS VEGAS): $0.00 ZONE PAY (20-45 MILES): $4.00 ZONE PAY (46-75 MILES, MERCURY): $5.00 ZONE PAY (76-150 MILES, FORWARD AREAS): $7.00 ZONE PAY (150+ MILES, NTTR): $8.00) | $67.19 | $19.88 | $87.07 | ASBE0135-004 eff. 10/01/2025 |
BOILERMAKER: BLACKSMITHScope and notesZONE PAY (ZONE A - LAS VEGAS $0.00 ZONE B - MERCURY & FORWARD AREAS $2.00 ZONE C - NTTR $2.50) | $44.31 | $28.96 | $73.27 | BOIL0092-006 eff. 10/01/2024 |
TILE FINISHERScope and notes(ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $37.07 | $14.74 | $51.81 | BRNV0013-003 eff. 10/01/2025 |
TILE SETTERScope and notes(ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $49.74 | $18.79 | $68.53 | BRNV0013-003 eff. 10/01/2025 |
TERRAZZO WORKER/SETTERScope and notes(ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $52.44 | $18.79 | $71.23 | BRNV0013-003 eff. 10/01/2025 |
MARBLE SETTERScope and notes(ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $52.44 | $18.79 | $71.23 | BRNV0013-003 eff. 10/01/2025 |
CAULKERScope and notes(ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $52.79 | $20.89 | $73.68 | BRNV0013-003 eff. 10/01/2025 |
BRICKLAYERScope and notes(ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00) | $52.79 | $20.89 | $73.68 | BRNV0013-003 eff. 10/01/2025 |
MILLWRIGHTScope and notes(ZONE PAY: ZONE A: LAS VEGAS- FREE ZONE: ZONE B: MERCURY, FORWARD & NTTR AREAS-$4.25) | $54.16 | $27.84 | $82.00 | CARP1607-006 eff. 10/01/2025 |
CARPENTERScope and notes(ZONE PAY: ZONE A: LAS VEGAS - FREE ZONE: ZONE B: MERCURY, FORWARD & NTTR AREAS - $4.25) | $52.12 | $28.08 | $80.20 | CARP1977-007 eff. 10/01/2025 |
ELECTRICIAN: CABLE SPLICERScope and notes(ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50) | $61.22 | $28.70 | $89.92 | ELEC0357-005 eff. 10/01/2025 |
ELECTRICIAN: COMMUNICATION TECHNICIAN ONLYScope and notes(ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50) | $64.37 | $28.81 | $93.18 | ELEC0357-005 eff. 10/01/2025 |
ELECTRICIANScope and notes(ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50) | $64.37 | $28.81 | $93.18 | ELEC0357-005 eff. 10/01/2025 |
LINE CONSTRUCTION: LINEMANScope and notes(ZONE PAY -NNSS $5.00; NTTR $5.00) | $62.08 | $31.99 | $94.07 | ELEC0396-004 eff. 10/01/2025 |
LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATORScope and notes(ZONE PAY -NNSS $5.00; NTTR $5.00) | $62.08 | $31.99 | $94.07 | ELEC0396-004 eff. 10/01/2025 |
LINE CONSTRUCTION: GROUNDMANScope and notes(ZONE PAY -NNSS $5.00; NTTR $5.00) | $49.66 | $31.50 | $81.16 | ELEC0396-004 eff. 10/01/2025 |
ELEVATOR MACHANICScope and notes(ZONE PAY: ZONE A- LAS VEGAS. ZONE B-MERCURY $2.00. ZONE C- NTTR $2.50. FOOTNOTE: ADDITIONAL FRINGE BENEFITS TO BE PAID A: PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 0 MONTHS TO 5 YEARS OF SERVICE. B: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY.) | $69.43 | $38.44 | $107.87 | ELEV0018-003 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 9 COMBINATION HEAVY DUTY REPAIRMAN AND WELDER; RUBBER-TIRED ANYTANDEM, MULTIPLE ENGINE EARTH-MOVING EQUIPMENT OPERATORScope and notes(ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $58.74 | $34.00 | $92.74 | ENGI0012-023 eff. 10/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 8 EXCAVATOR/TRACKHOE OR SIMILARScope and notes(ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $58.92 | $34.00 | $92.92 | ENGI0012-023 eff. 10/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 7 HEAVY DUTY REPAIRMAN; HEAVY DUTY WELDER; LIGHT DUTY REPAIRMAN (HYBRID/ALL ELECTRIC)Scope and notes(ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $57.99 | $34.00 | $91.99 | ENGI0012-023 eff. 10/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 6 BATCH PLANT OPERATOR; BULK PLANT OPERATOR; CONCRETE MIXER OPERATOR (PAVING); CONCRETE MOBILE MIXER OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN OPERATOR; CRUSHING PLANT ENGINEER; DANDY DIGGER; DRILLER (ROTATRY/CORE); ELEVATING GRADE OPERATOR; FORKLIFT OPERATOR (OVER 5 TIMES); GRADE-ALL OPERATOR; HIGHLINE CABLEWAY OPERATOR; HOIST OPERATOR; JUMBO PIPE CARRIER; KOLMAN BELT LOADER, AND SIMILAR TYPE; LIFT SLAB MACHINE OPERATOR; LOADER OPERATOR; MACHINIST OPERATOR; MICRO TUNNEL SYSTEM (BELOW GROUND); MOTOR PATROL OPERATOR (ANY TYPE OR SIZE); OZZIE PADDER (OR SIMILAR TYPE); PNEUMATIC CONCRETE PLACING MACHINE OPERATOR (OR SIMILAR TYPE); PNEUMATIC PIPE RAMMING TOOL (AND SIMILAR TYPES); ROTOMIL OPERATOR; SEWER PLANT OPERATOR; SHOVEL, CRANE, BACKHOE, DRAGLINE, CLAMSHELL; DERRICK, DERRICK BARGE, PILE DRIVER, AND MUCKING MACHINE OPERATOR; SHUTTLE BUGGY; SKIPLOADER (WHEEL TYPE OVER 1 1/2 YARDS); SURFACE HEATER AND PLANER OPERATOR; TRACTOR LOADER OPERATOR, (CRAWLER TYPE- ALL TYPES AND SIZES); TRACTOR OPERATOR (WITH BOOM ATTACHMENTS); TRAVELING PIPE WRAPPING, CLEANING AND BENDING MACHINE OPERATOR; TRENCHING MACHINE OPERATOR (OVER 6-FT DEPTH); TUNNEL BORING MACHINE; WATER PULL (COMPACTION); WATER WELL DRILLERScope and notes(ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $57.74 | $34.00 | $91.74 | ENGI0012-023 eff. 10/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 5 ASPHALT OR CONCRETE SPREADING MECHANICAL TAMPING OR FINISHING MACHINE OPERATOR-ROLLER (ALL TYPES AND SIZES), SOIL CEMENT, ASPHALT FINISH; ASPHALT PLANT ENGINEER; DECK ENGINE OPERATOOR; GRADE CHECKER; PAVEMENT-BREAKER OPERATOR; PNEUMATIC HEADING SHIELD- TUNNEL; ROAD OIL MIXING MACHINE OPEREATOR; FORKLIFT (UNDER (5) TONS); RUBBER TIRED, HEAVY DUTY EQUIPMENT OPERATOR; SKIPLOADER (WHEELTYPE, OVER 3-4 YARDS); SLIP FORM PUMP OPERATOR; TRACKOR OPERATOR, DRAG-TYPE SHOVEL, BULLDOZER, TAMPER, SCRAPER, AND PUSH TRACTORScope and notes(ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $57.62 | $34.00 | $91.62 | ENGI0012-023 eff. 10/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 4 ASPHALT PLANT FIREMAN; BORING MACHINE OPERATOR; BORING SYSTEMS ELECTRONIC TRACKING LOCATOR; BOXMAN OR MIXER BOX OPERATOR (CONCRETE OR ASPHALT PLANT); FISHING TOOL ENGINEER; HIGHLINE CABLEWAY SIGNALMAN; HORIZONTAL DIRECTIONAL DRILLING MACHINE; INSTRUMENTMAN; LOCOMOTIVE ENGINEER; MICO-TUNNELING (ABOVE GROUND TUNNEL); MINI EXCAVATOR OPERATOR; MUD PLANT OPERATOR; POWER SWEEPER OPERATOR; ROLLER OPERATOR (COMPACTING); SCREED OPERATOR; SEEDER; TRENCHING MACHINE OPERATOR, VACCUM TRUCKScope and notes(ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $56.52 | $34.00 | $90.52 | ENGI0012-023 eff. 10/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 3 A-FRAME OR WINCH TRUCK OPERATOR; BOBCAT OR SIMILAR TYPE (SKIDSTEER); DERRICKMAN (ROTARY AND CORE); DINKY LOCOMOTIVE OR TUNNEL MOTOR OPERATOR; ELEVATOR HOIST OPERATOR; EQUIPMENT GREASER; FORD, FERGUSON OR SIMILAR TYPE (WITH DRAG-TYPE ATTACHMENTS); HYDRA-HAMMER OR SIMILAR TYPE EQUIPMENT; MATERIAL HOIST/OUTSIDE MANLIFT OPERATOR; POWER CONCRETE CURING MACHINE; PPOWER CONCRETE SAW OPERATOR (OR SIMILAR TYPE); POWER DRIVEN JUMBO FORM SETTER OPERATOR; RODMAN & CHAINMAN; ROSS CARRIER OPERATOR; SELF-CLIMBING SCAFFOLD (OR SIMILAR TYPE); SELF-PROPELLED TAR PIPELINING MACHINE OPERATOR; STATIONARY PIPE WRAPPING AND CLEANING MACHINE OPERATOR; STEAM AND WATER PLANT OPERATOR; TOWBLADE OPERATORScope and notes(ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $55.03 | $34.00 | $89.03 | ENGI0012-023 eff. 10/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 2 CONCRETE MIXER OPERATOR (SKID TYPE); CONVEYOR AND BELTMAN; FIREMAN; GENERATOR PUMP OR COMPRESSOR OPERATOR; GENERATOR, PUMP OR COMPRESSOR PLANT OPERATOR; HYDROSTATIC PUMP MOTORMAN (ROTARY AND CORE); PJU SIDEDUMP JACK; SCREENING AND CONVEYOR MACHINE (SIMILAR TYPE); SKIPLOADER (WHEELTYPE, FORD, FERGUSON, JEEP OR SIMILAR TYPE, 3/4 YARDS OR LESS, WITHOUT DRAG-TYPE ATTACHMENTS); TEMPORARY HEATING PLANT OPERATOR; TRUCK CRANE OILERScope and notes(ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $54.74 | $34.00 | $88.74 | ENGI0012-023 eff. 10/01/2025 |
POWER EQUIPMENT OPERATOR GROUP 1 AIR COMPRESSOR, PUMP OR GENERATOR OPERATOR; BLADE OPERATOR, ENGINEER-OILER AND SIGNALMAN; RAIL MOUNTED JLG; ROTARY DRILL TENDER (ROTARY AND CORE); STEAM CLEANER/PRESSURE WASHER; SWITCHMAN OR BRAKEMANScope and notes(ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50) | $53.79 | $34.00 | $87.79 | ENGI0012-023 eff. 10/01/2025 |
IRONWORKERScope and notes(ZONE PAY- NNSS $5.50; NTTR $5.50) | $55.06 | $37.26 | $92.32 | IRON0118-014 eff. 10/01/2025 |
LABORER GROUP 3 ASBESTOS ABATEMENT; HAZARDOUS WASTE; LEAD ABATEMENT; MICROBIAL REMEDIATION WHICH INCLUDES HANTAVIRUS; PETROCHEMICAL HANDLER; RADIATION WORKERScope and notes(ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $5.55 SHOULD BE ADDED TO THE BASE RATE) | $41.57 | $27.22 | $68.79 | LABO0872-009 eff. 10/01/2025 |
LABORER GROUP 2 ASPHALT RAKER, IRONER, SPREADER; BUGGYMOBILE MAN; CEMENT DUMPER; CONCRETE CORE CUTTER, SAWMAN AND CEMENT GRINDING OPERATOR; CONCRETE CURER; CRIBBER OR SHORER; CUTTING TORCH OPERATOR (DEMOLITION); DRILLER; DRY PACKING CONCRETE & FILLING OF FORM BOLT HOLES; GAS & OIL PIPELINE WRAPPER; HEAD ROCK SLINGER; JACKHAMMER, DRILLER AND/OR PAVEMENT BREAKER; LAYING OF ALL NONMETALLIC PIPE, INCLUDING SEWER PIPE, DRAIN PIPE AND UNDERGROUND TILE; MACHINE TOOL OPERATOR (OPERATORS AND TENDERS OF PNEUMATIC & ELECTRIC TOOLS, VIBRATING MACHINES AND SIMILAR MECHANICAL TOOLS NOT SEPARATELY CLASSIFIED HEREIN, INCLUDING HAND GUIDED DITCH WITCH AND HAND-TYPE ROLLER); PAVING, AIRPORT RUNWAYS & SIMILAR WORK; PESTICIDE, HERBICIDE, INSECTICIDE APPLICATOR; POTHOLER; POWDERMAN; ROCK SLINGER; SANDBLASTER (NOZZLEMAN); SANDBLASTER (POT TENDER); SHOTCRETE (NOZZLEMAN); SHOTCRETE (POT TENDER); STEEL HEADERBOARD MANScope and notes(ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $5.55 SHOULD BE ADDED TO THE BASE RATE) | $41.39 | $27.22 | $68.61 | LABO0872-009 eff. 10/01/2025 |
LABORER GROUP 1 BUILDING/OFFICE CLEANUP: CESSPOOL DIGGER & INSTALLER; DRINKING WATER; FENCE BUILDER; FINE GRADER, HIGHWAY & STREET; FLAGPERSON; GAS & OIL PIPELINE LABORER; GAS & OIL PIPELINE WRAPPER - POT TENDER AND FORM MAN; GUINEA CHASER; PACKING ROD STEEL AND PLANS; GENERAL (CONSTRUCTION CLEANUP); DEMOLITION; LANDSCAPE GARDENER, NURSERYMAN AND GROUNDS KEEPER; MAKING & CAULKING OF ALL NONMETALLIC PIPE JOINTS; RIP RAP STONE PAVER; ROTO-SCRAPER; SCALER; SEPTIC TANK DIGGER & INSTALLER (LEADMAN); TANK SCALER AND CLEANER; TOOL ATTENDANT (JOBSITE ONLY); TREE CLIMBER, FALLER, CHAIN SAW OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE OF BRUSH SHEDDERS; WINDOW CLEANERScope and notes(ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $5.55 SHOULD BE ADDED TO THE BASE RATE) | $41.13 | $27.22 | $68.35 | LABO0872-009 eff. 10/01/2025 |
LABORER: BULLGANG, MUCKER, TRACKMANScope and notes(ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE) | $46.44 | $27.27 | $73.71 | LABO0872-010 eff. 10/01/2025 |
LABORER: MINER-TUNNEL HARDROCKScope and notes(ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE) | $46.69 | $27.27 | $73.96 | LABO0872-010 eff. 10/01/2025 |
LABORER: SHAFT, RAISE, STOPE MINERScope and notes(ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE) | $47.69 | $27.27 | $74.96 | LABO0872-010 eff. 10/01/2025 |
PAINTER: FLOORCOVERER, CARPET, LINOLEUM AND TILE GLAZIERScope and notes(ZONE PAY- NNSS $5.00; NTTR $5.00) | $52.40 | $24.18 | $76.58 | PAIN0159-002 eff. 10/01/2025 |
PAINTERScope and notes(ZONE PAY- NNSS $5.00; NTTR $5.00) | $51.79 | $24.18 | $75.97 | PAIN0159-002 eff. 10/01/2025 |
PAINTER, SPRAY AND PAPERHANGER SIGNScope and notes(ZONE PAY- NNSS $5.00; NTTR $5.00) | $52.14 | $24.18 | $76.32 | PAIN0159-002 eff. 10/01/2025 |
PAINTER, TAPER, FLUSHER AND DETAILERScope and notes(ZONE PAY- NNSS $5.00; NTTR $5.00) | $52.14 | $24.18 | $76.32 | PAIN0159-002 eff. 10/01/2025 |
PLASTERERScope and notes(ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50) | $42.03 | $28.05 | $70.08 | PLAS0797-004 eff. 10/01/2025 |
CEMENT MASONScope and notes(ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50) | $43.27 | $29.66 | $72.93 | PLAS0797-004 eff. 10/01/2025 |
PIPEFITTER: INCLUDING INERT GAS WELDERScope and notes(ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25) | $62.85 | $26.75 | $89.60 | PLUM0525-007 eff. 10/01/2025 |
PLUMBER: INCLUDLING LEAD BURNERScope and notes(ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25) | $62.85 | $26.75 | $89.60 | PLUM0525-007 eff. 10/01/2025 |
REFRIGERATION MECHANICScope and notes(ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25) | $62.85 | $26.75 | $89.60 | PLUM0525-007 eff. 10/01/2025 |
| ROOFER (INCLUDING WATERPROOFING) | $39.74 | $12.42 | $52.16 | ROOF0162-003 eff. 10/01/2025 |
SPRINKLER FITTERScope and notesZONE PAY ZONE A: LAS VEGAS - $0.00 ZONE B: NNSS - $4.50 ZONE C: NTTR - $4.50 | $56.69 | $28.62 | $85.31 | SFNV0669-003 eff. 10/01/2025 |
SHEET METAL WORKERScope and notes(ZONE PAY: NNSS $5.50; NTTR $5.50) | $66.73 | $30.01 | $96.74 | SHEE0088-003 eff. 10/01/2025 |
TRUCK DRIVER, GROUP 5 TIREMANScope and notes(ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $44.26 | $28.37 | $72.63 | TEAM0631-007 eff. 10/01/2025 |
TRUCK DRIVER, GROUP 4 BOOTMAN, OFF-ROAD AND SPECIAL EQUIPMENT DRIVERScope and notes(ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $44.78 | $28.37 | $73.15 | TEAM0631-007 eff. 10/01/2025 |
TRUCK DRIVER, GROUP 3 EXTRA HEAVY DUTY DRIVER, FORKLIFT DRIVER (OVER 15 TONS)Scope and notes(ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $44.06 | $28.37 | $72.43 | TEAM0631-007 eff. 10/01/2025 |
TRUCK DRIVER, GROUP 2 EQUIPMENT PARTS CLERK, FLEET OPERATIONS DISPATCHER, FORKLIFT DRIVER (UNDER 15 TONS), HEAVY DUTY DRIVER, WAREHOUSEMANScope and notes(ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $43.86 | $28.37 | $72.23 | TEAM0631-007 eff. 10/01/2025 |
TRUCK DRIVER, GROUP 1 LIGHT DUTY DRIVER, LIGHT VEHICLE DISPATCHER, TRUCK GREASERScope and notes(ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES) | $43.69 | $28.37 | $72.06 | TEAM0631-007 eff. 10/01/2025 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 3 published 06/01/2026. We format and check the official text; the determination in your contract is what applies.