Nevada prevailing wage rates: NV20260002

Building, Heavy, Highway construction in Clark, Lincoln, Nye Counties.

NV20260002, modification 3, published 06/01/2026. Official source on SAM.gov

Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.

What changed since modification 2

  • changed ASBESTOS/INSULATOR WORKER: MECHANIC base $62.85 → $67.19 (+$4.34), fringe $26.75 → $19.88 (−$6.87) Now listed under rate group ASBE0135-004, effective 10/01/2025 (was PLUM0525-007, effective 10/01/2025).
  • changed BOILERMAKER: BLACKSMITH base $49.66 → $44.31 (−$5.35), fringe $31.50 → $28.96 (−$2.54) Now listed under rate group BOIL0092-006, effective 10/01/2024 (was ELEC0396-004, effective 10/01/2025).
  • changed BRICKLAYER base $52.44 → $52.79 (+$0.35), fringe $18.79 → $20.89 (+$2.10) Same effective date as before (10/01/2025).
  • changed CARPENTER base $64.37 → $52.12 (−$12.25), fringe $28.81 → $28.08 (−$0.73) Now listed under rate group CARP1977-007, effective 10/01/2025 (was ELEC0357-005, effective 10/01/2025).
  • changed CEMENT MASON base $62.85 → $43.27 (−$19.58), fringe $26.75 → $29.66 (+$2.91) Now listed under rate group PLAS0797-004, effective 10/01/2025 (was PLUM0525-007, effective 10/01/2025).
  • changed ELECTRICIAN base $66.73 → $64.37 (−$2.36), fringe $30.01 → $28.81 (−$1.20) Now listed under rate group ELEC0357-005, effective 10/01/2025 (was SHEE0088-003, effective 10/01/2025).
  • changed ELECTRICIAN: CABLE SPLICER base $62.85 → $61.22 (−$1.63), fringe $26.75 → $28.70 (+$1.95) Now listed under rate group ELEC0357-005, effective 10/01/2025 (was PLUM0525-007, effective 10/01/2025).
  • changed ELECTRICIAN: COMMUNICATION TECHNICIAN ONLY base $39.74 → $64.37 (+$24.63), fringe $12.42 → $28.81 (+$16.39) Now listed under rate group ELEC0357-005, effective 10/01/2025 (was ROOF0162-003, effective 10/01/2025).
  • changed IRONWORKER base $56.69 → $55.06 (−$1.63), fringe $28.62 → $37.26 (+$8.64) Now listed under rate group IRON0118-014, effective 10/01/2025 (was SFNV0669-003, effective 10/01/2025).
  • changed LABORER: BULLGANG, MUCKER, TRACKMAN base $64.37 → $46.44 (−$17.93), fringe $28.81 → $27.27 (−$1.54) Now listed under rate group LABO0872-010, effective 10/01/2025 (was ELEC0357-005, effective 10/01/2025).
  • changed LABORER: MINER-TUNNEL HARDROCK base $52.14 → $46.69 (−$5.45), fringe $24.18 → $27.27 (+$3.09) Now listed under rate group LABO0872-010, effective 10/01/2025 (was PAIN0159-002, effective 10/01/2025).
  • changed LABORER: SHAFT, RAISE, STOPE MINER base $52.14 → $47.69 (−$4.45), fringe $24.18 → $27.27 (+$3.09) Now listed under rate group LABO0872-010, effective 10/01/2025 (was PAIN0159-002, effective 10/01/2025).
  • changed LINE CONSTRUCTION: GROUNDMAN base $47.69 → $49.66 (+$1.97), fringe $27.27 → $31.50 (+$4.23) Now listed under rate group ELEC0396-004, effective 10/01/2025 (was LABO0872-010, effective 10/01/2025).
  • changed LINE CONSTRUCTION: LINEMAN base $46.69 → $62.08 (+$15.39), fringe $27.27 → $31.99 (+$4.72) Now listed under rate group ELEC0396-004, effective 10/01/2025 (was LABO0872-010, effective 10/01/2025).
  • changed MILLWRIGHT base $43.27 → $54.16 (+$10.89), fringe $29.66 → $27.84 (−$1.82) Now listed under rate group CARP1607-006, effective 10/01/2025 (was PLAS0797-004, effective 10/01/2025).
  • changed PAINTER, SPRAY AND PAPERHANGER SIGN base $46.44 → $52.14 (+$5.70), fringe $27.27 → $24.18 (−$3.09) Now listed under rate group PAIN0159-002, effective 10/01/2025 (was LABO0872-010, effective 10/01/2025).
  • changed PAINTER, TAPER, FLUSHER AND DETAILER base $62.08 → $52.14 (−$9.94), fringe $31.99 → $24.18 (−$7.81) Now listed under rate group PAIN0159-002, effective 10/01/2025 (was ELEC0396-004, effective 10/01/2025).
  • changed PAINTER: FLOORCOVERER, CARPET, LINOLEUM AND TILE GLAZIER base $52.79 → $52.40 (−$0.39), fringe $20.89 → $24.18 (+$3.29) Now listed under rate group PAIN0159-002, effective 10/01/2025 (was BRNV0013-003, effective 10/01/2025).
  • changed PIPEFITTER: INCLUDING INERT GAS WELDER base $52.40 → $62.85 (+$10.45), fringe $24.18 → $26.75 (+$2.57) Now listed under rate group PLUM0525-007, effective 10/01/2025 (was PAIN0159-002, effective 10/01/2025).
  • changed PLUMBER: INCLUDLING LEAD BURNER base $67.19 → $62.85 (−$4.34), fringe $19.88 → $26.75 (+$6.87) Now listed under rate group PLUM0525-007, effective 10/01/2025 (was ASBE0135-004, effective 10/01/2025).
  • changed REFRIGERATION MECHANIC base $61.22 → $62.85 (+$1.63), fringe $28.70 → $26.75 (−$1.95) Now listed under rate group PLUM0525-007, effective 10/01/2025 (was ELEC0357-005, effective 10/01/2025).
  • changed ROOFER (INCLUDING WATERPROOFING) base $37.07 → $39.74 (+$2.67), fringe $14.74 → $12.42 (−$2.32) Now listed under rate group ROOF0162-003, effective 10/01/2025 (was BRNV0013-003, effective 10/01/2025).
  • changed SHEET METAL WORKER base $62.08 → $66.73 (+$4.65), fringe $31.99 → $30.01 (−$1.98) Now listed under rate group SHEE0088-003, effective 10/01/2025 (was ELEC0396-004, effective 10/01/2025).
  • changed SPRINKLER FITTER base $44.31 → $56.69 (+$12.38), fringe $28.96 → $28.62 (−$0.34) Now listed under rate group SFNV0669-003, effective 10/01/2025 (was BOIL0092-006, effective 10/01/2024).
  • changed TILE FINISHER base $52.44 → $37.07 (−$15.37), fringe $18.79 → $14.74 (−$4.05) Same effective date as before (10/01/2025).
  • changed TILE SETTER base $69.43 → $49.74 (−$19.69), fringe $38.44 → $18.79 (−$19.65) Now listed under rate group BRNV0013-003, effective 10/01/2025 (was ELEV0018-003, effective 01/01/2025).
4 classifications added, 4 removed or reworded
  • removed CAULKER was $54.16 + $27.84 fringe
  • added ELEVATOR MACHANIC $69.43 + $38.44 fringe
  • removed LINE CONSTRUCTION (HEAVY EQUIPMENT OPERATOR) was $49.74 + $18.79 fringe
  • added LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR $62.08 + $31.99 fringe
  • added MARBLE SETTER $52.44 + $18.79 fringe
  • removed PAINTER was $52.12 + $28.08 fringe
  • removed PLASTERER was $55.06 + $37.26 fringe
  • added TERRAZZO WORKER/SETTER $52.44 + $18.79 fringe

Rates per hour

Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.

NV20260002 wage rates
ClassificationBaseFringeTotalRate ID
ASBESTOS/INSULATOR WORKER: MECHANIC
Scope and notes

(ZONE PAY (0-19 MILES, LAS VEGAS): $0.00 ZONE PAY (20-45 MILES): $4.00 ZONE PAY (46-75 MILES, MERCURY): $5.00 ZONE PAY (76-150 MILES, FORWARD AREAS): $7.00 ZONE PAY (150+ MILES, NTTR): $8.00)

$67.19$19.88$87.07ASBE0135-004
eff. 10/01/2025
BOILERMAKER: BLACKSMITH
Scope and notes

ZONE PAY (ZONE A - LAS VEGAS $0.00 ZONE B - MERCURY & FORWARD AREAS $2.00 ZONE C - NTTR $2.50)

$44.31$28.96$73.27BOIL0092-006
eff. 10/01/2024
TILE FINISHER
Scope and notes

(ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00)

$37.07$14.74$51.81BRNV0013-003
eff. 10/01/2025
TILE SETTER
Scope and notes

(ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00)

$49.74$18.79$68.53BRNV0013-003
eff. 10/01/2025
TERRAZZO WORKER/SETTER
Scope and notes

(ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00)

$52.44$18.79$71.23BRNV0013-003
eff. 10/01/2025
MARBLE SETTER
Scope and notes

(ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00)

$52.44$18.79$71.23BRNV0013-003
eff. 10/01/2025
CAULKER
Scope and notes

(ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00)

$52.79$20.89$73.68BRNV0013-003
eff. 10/01/2025
BRICKLAYER
Scope and notes

(ZONE PAY: ZONE 1: FREE ZONE 0-40 MILES $0.00 ZONE 2: 41-50 MILES - $3.75 ZONE 3: 51-70 MILES - $5.00 ZONE 4: OVER 71 MILES - $10.00)

$52.79$20.89$73.68BRNV0013-003
eff. 10/01/2025
MILLWRIGHT
Scope and notes

(ZONE PAY: ZONE A: LAS VEGAS- FREE ZONE: ZONE B: MERCURY, FORWARD & NTTR AREAS-$4.25)

$54.16$27.84$82.00CARP1607-006
eff. 10/01/2025
CARPENTER
Scope and notes

(ZONE PAY: ZONE A: LAS VEGAS - FREE ZONE: ZONE B: MERCURY, FORWARD & NTTR AREAS - $4.25)

$52.12$28.08$80.20CARP1977-007
eff. 10/01/2025
ELECTRICIAN: CABLE SPLICER
Scope and notes

(ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50)

$61.22$28.70$89.92ELEC0357-005
eff. 10/01/2025
ELECTRICIAN: COMMUNICATION TECHNICIAN ONLY
Scope and notes

(ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50)

$64.37$28.81$93.18ELEC0357-005
eff. 10/01/2025
ELECTRICIAN
Scope and notes

(ZONE PAY ZONE A: 1-25 MILES - $0.00 ZONE B: 25-55 MILES - $7.00 ZONE C: OVER 55 MILES NNSS - $7.00 ZONE D: NTTR - $7.50)

$64.37$28.81$93.18ELEC0357-005
eff. 10/01/2025
LINE CONSTRUCTION: LINEMAN
Scope and notes

(ZONE PAY -NNSS $5.00; NTTR $5.00)

$62.08$31.99$94.07ELEC0396-004
eff. 10/01/2025
LINE CONSTRUCTION: HEAVY EQUIPMENT OPERATOR
Scope and notes

(ZONE PAY -NNSS $5.00; NTTR $5.00)

$62.08$31.99$94.07ELEC0396-004
eff. 10/01/2025
LINE CONSTRUCTION: GROUNDMAN
Scope and notes

(ZONE PAY -NNSS $5.00; NTTR $5.00)

$49.66$31.50$81.16ELEC0396-004
eff. 10/01/2025
ELEVATOR MACHANIC
Scope and notes

(ZONE PAY: ZONE A- LAS VEGAS. ZONE B-MERCURY $2.00. ZONE C- NTTR $2.50. FOOTNOTE: ADDITIONAL FRINGE BENEFITS TO BE PAID A: PAID VACATION: EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 0 MONTHS TO 5 YEARS OF SERVICE. B: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY.)

$69.43$38.44$107.87ELEV0018-003
eff. 01/01/2025
POWER EQUIPMENT OPERATOR GROUP 9 COMBINATION HEAVY DUTY REPAIRMAN AND WELDER; RUBBER-TIRED ANYTANDEM, MULTIPLE ENGINE EARTH-MOVING EQUIPMENT OPERATOR
Scope and notes

(ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50)

$58.74$34.00$92.74ENGI0012-023
eff. 10/01/2025
POWER EQUIPMENT OPERATOR GROUP 8 EXCAVATOR/TRACKHOE OR SIMILAR
Scope and notes

(ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50)

$58.92$34.00$92.92ENGI0012-023
eff. 10/01/2025
POWER EQUIPMENT OPERATOR GROUP 7 HEAVY DUTY REPAIRMAN; HEAVY DUTY WELDER; LIGHT DUTY REPAIRMAN (HYBRID/ALL ELECTRIC)
Scope and notes

(ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50)

$57.99$34.00$91.99ENGI0012-023
eff. 10/01/2025
POWER EQUIPMENT OPERATOR GROUP 6 BATCH PLANT OPERATOR; BULK PLANT OPERATOR; CONCRETE MIXER OPERATOR (PAVING); CONCRETE MOBILE MIXER OPERATOR; CONCRETE PUMP OR PUMPCRETE GUN OPERATOR; CRUSHING PLANT ENGINEER; DANDY DIGGER; DRILLER (ROTATRY/CORE); ELEVATING GRADE OPERATOR; FORKLIFT OPERATOR (OVER 5 TIMES); GRADE-ALL OPERATOR; HIGHLINE CABLEWAY OPERATOR; HOIST OPERATOR; JUMBO PIPE CARRIER; KOLMAN BELT LOADER, AND SIMILAR TYPE; LIFT SLAB MACHINE OPERATOR; LOADER OPERATOR; MACHINIST OPERATOR; MICRO TUNNEL SYSTEM (BELOW GROUND); MOTOR PATROL OPERATOR (ANY TYPE OR SIZE); OZZIE PADDER (OR SIMILAR TYPE); PNEUMATIC CONCRETE PLACING MACHINE OPERATOR (OR SIMILAR TYPE); PNEUMATIC PIPE RAMMING TOOL (AND SIMILAR TYPES); ROTOMIL OPERATOR; SEWER PLANT OPERATOR; SHOVEL, CRANE, BACKHOE, DRAGLINE, CLAMSHELL; DERRICK, DERRICK BARGE, PILE DRIVER, AND MUCKING MACHINE OPERATOR; SHUTTLE BUGGY; SKIPLOADER (WHEEL TYPE OVER 1 1/2 YARDS); SURFACE HEATER AND PLANER OPERATOR; TRACTOR LOADER OPERATOR, (CRAWLER TYPE- ALL TYPES AND SIZES); TRACTOR OPERATOR (WITH BOOM ATTACHMENTS); TRAVELING PIPE WRAPPING, CLEANING AND BENDING MACHINE OPERATOR; TRENCHING MACHINE OPERATOR (OVER 6-FT DEPTH); TUNNEL BORING MACHINE; WATER PULL (COMPACTION); WATER WELL DRILLER
Scope and notes

(ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50)

$57.74$34.00$91.74ENGI0012-023
eff. 10/01/2025
POWER EQUIPMENT OPERATOR GROUP 5 ASPHALT OR CONCRETE SPREADING MECHANICAL TAMPING OR FINISHING MACHINE OPERATOR-ROLLER (ALL TYPES AND SIZES), SOIL CEMENT, ASPHALT FINISH; ASPHALT PLANT ENGINEER; DECK ENGINE OPERATOOR; GRADE CHECKER; PAVEMENT-BREAKER OPERATOR; PNEUMATIC HEADING SHIELD- TUNNEL; ROAD OIL MIXING MACHINE OPEREATOR; FORKLIFT (UNDER (5) TONS); RUBBER TIRED, HEAVY DUTY EQUIPMENT OPERATOR; SKIPLOADER (WHEELTYPE, OVER 3-4 YARDS); SLIP FORM PUMP OPERATOR; TRACKOR OPERATOR, DRAG-TYPE SHOVEL, BULLDOZER, TAMPER, SCRAPER, AND PUSH TRACTOR
Scope and notes

(ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50)

$57.62$34.00$91.62ENGI0012-023
eff. 10/01/2025
POWER EQUIPMENT OPERATOR GROUP 4 ASPHALT PLANT FIREMAN; BORING MACHINE OPERATOR; BORING SYSTEMS ELECTRONIC TRACKING LOCATOR; BOXMAN OR MIXER BOX OPERATOR (CONCRETE OR ASPHALT PLANT); FISHING TOOL ENGINEER; HIGHLINE CABLEWAY SIGNALMAN; HORIZONTAL DIRECTIONAL DRILLING MACHINE; INSTRUMENTMAN; LOCOMOTIVE ENGINEER; MICO-TUNNELING (ABOVE GROUND TUNNEL); MINI EXCAVATOR OPERATOR; MUD PLANT OPERATOR; POWER SWEEPER OPERATOR; ROLLER OPERATOR (COMPACTING); SCREED OPERATOR; SEEDER; TRENCHING MACHINE OPERATOR, VACCUM TRUCK
Scope and notes

(ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50)

$56.52$34.00$90.52ENGI0012-023
eff. 10/01/2025
POWER EQUIPMENT OPERATOR GROUP 3 A-FRAME OR WINCH TRUCK OPERATOR; BOBCAT OR SIMILAR TYPE (SKIDSTEER); DERRICKMAN (ROTARY AND CORE); DINKY LOCOMOTIVE OR TUNNEL MOTOR OPERATOR; ELEVATOR HOIST OPERATOR; EQUIPMENT GREASER; FORD, FERGUSON OR SIMILAR TYPE (WITH DRAG-TYPE ATTACHMENTS); HYDRA-HAMMER OR SIMILAR TYPE EQUIPMENT; MATERIAL HOIST/OUTSIDE MANLIFT OPERATOR; POWER CONCRETE CURING MACHINE; PPOWER CONCRETE SAW OPERATOR (OR SIMILAR TYPE); POWER DRIVEN JUMBO FORM SETTER OPERATOR; RODMAN & CHAINMAN; ROSS CARRIER OPERATOR; SELF-CLIMBING SCAFFOLD (OR SIMILAR TYPE); SELF-PROPELLED TAR PIPELINING MACHINE OPERATOR; STATIONARY PIPE WRAPPING AND CLEANING MACHINE OPERATOR; STEAM AND WATER PLANT OPERATOR; TOWBLADE OPERATOR
Scope and notes

(ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50)

$55.03$34.00$89.03ENGI0012-023
eff. 10/01/2025
POWER EQUIPMENT OPERATOR GROUP 2 CONCRETE MIXER OPERATOR (SKID TYPE); CONVEYOR AND BELTMAN; FIREMAN; GENERATOR PUMP OR COMPRESSOR OPERATOR; GENERATOR, PUMP OR COMPRESSOR PLANT OPERATOR; HYDROSTATIC PUMP MOTORMAN (ROTARY AND CORE); PJU SIDEDUMP JACK; SCREENING AND CONVEYOR MACHINE (SIMILAR TYPE); SKIPLOADER (WHEELTYPE, FORD, FERGUSON, JEEP OR SIMILAR TYPE, 3/4 YARDS OR LESS, WITHOUT DRAG-TYPE ATTACHMENTS); TEMPORARY HEATING PLANT OPERATOR; TRUCK CRANE OILER
Scope and notes

(ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50)

$54.74$34.00$88.74ENGI0012-023
eff. 10/01/2025
POWER EQUIPMENT OPERATOR GROUP 1 AIR COMPRESSOR, PUMP OR GENERATOR OPERATOR; BLADE OPERATOR, ENGINEER-OILER AND SIGNALMAN; RAIL MOUNTED JLG; ROTARY DRILL TENDER (ROTARY AND CORE); STEAM CLEANER/PRESSURE WASHER; SWITCHMAN OR BRAKEMAN
Scope and notes

(ZONE PAY ZONE B (REPORT TO NNSS) - $4.50 ZONE C (REPORT TO NTTR) - $4.50)

$53.79$34.00$87.79ENGI0012-023
eff. 10/01/2025
IRONWORKER
Scope and notes

(ZONE PAY- NNSS $5.50; NTTR $5.50)

$55.06$37.26$92.32IRON0118-014
eff. 10/01/2025
LABORER GROUP 3 ASBESTOS ABATEMENT; HAZARDOUS WASTE; LEAD ABATEMENT; MICROBIAL REMEDIATION WHICH INCLUDES HANTAVIRUS; PETROCHEMICAL HANDLER; RADIATION WORKER
Scope and notes

(ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $5.55 SHOULD BE ADDED TO THE BASE RATE)

$41.57$27.22$68.79LABO0872-009
eff. 10/01/2025
LABORER GROUP 2 ASPHALT RAKER, IRONER, SPREADER; BUGGYMOBILE MAN; CEMENT DUMPER; CONCRETE CORE CUTTER, SAWMAN AND CEMENT GRINDING OPERATOR; CONCRETE CURER; CRIBBER OR SHORER; CUTTING TORCH OPERATOR (DEMOLITION); DRILLER; DRY PACKING CONCRETE & FILLING OF FORM BOLT HOLES; GAS & OIL PIPELINE WRAPPER; HEAD ROCK SLINGER; JACKHAMMER, DRILLER AND/OR PAVEMENT BREAKER; LAYING OF ALL NONMETALLIC PIPE, INCLUDING SEWER PIPE, DRAIN PIPE AND UNDERGROUND TILE; MACHINE TOOL OPERATOR (OPERATORS AND TENDERS OF PNEUMATIC & ELECTRIC TOOLS, VIBRATING MACHINES AND SIMILAR MECHANICAL TOOLS NOT SEPARATELY CLASSIFIED HEREIN, INCLUDING HAND GUIDED DITCH WITCH AND HAND-TYPE ROLLER); PAVING, AIRPORT RUNWAYS & SIMILAR WORK; PESTICIDE, HERBICIDE, INSECTICIDE APPLICATOR; POTHOLER; POWDERMAN; ROCK SLINGER; SANDBLASTER (NOZZLEMAN); SANDBLASTER (POT TENDER); SHOTCRETE (NOZZLEMAN); SHOTCRETE (POT TENDER); STEEL HEADERBOARD MAN
Scope and notes

(ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $5.55 SHOULD BE ADDED TO THE BASE RATE)

$41.39$27.22$68.61LABO0872-009
eff. 10/01/2025
LABORER GROUP 1 BUILDING/OFFICE CLEANUP: CESSPOOL DIGGER & INSTALLER; DRINKING WATER; FENCE BUILDER; FINE GRADER, HIGHWAY & STREET; FLAGPERSON; GAS & OIL PIPELINE LABORER; GAS & OIL PIPELINE WRAPPER - POT TENDER AND FORM MAN; GUINEA CHASER; PACKING ROD STEEL AND PLANS; GENERAL (CONSTRUCTION CLEANUP); DEMOLITION; LANDSCAPE GARDENER, NURSERYMAN AND GROUNDS KEEPER; MAKING & CAULKING OF ALL NONMETALLIC PIPE JOINTS; RIP RAP STONE PAVER; ROTO-SCRAPER; SCALER; SEPTIC TANK DIGGER & INSTALLER (LEADMAN); TANK SCALER AND CLEANER; TOOL ATTENDANT (JOBSITE ONLY); TREE CLIMBER, FALLER, CHAIN SAW OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE OF BRUSH SHEDDERS; WINDOW CLEANER
Scope and notes

(ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $5.55 SHOULD BE ADDED TO THE BASE RATE)

$41.13$27.22$68.35LABO0872-009
eff. 10/01/2025
LABORER: BULLGANG, MUCKER, TRACKMAN
Scope and notes

(ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE)

$46.44$27.27$73.71LABO0872-010
eff. 10/01/2025
LABORER: MINER-TUNNEL HARDROCK
Scope and notes

(ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE)

$46.69$27.27$73.96LABO0872-010
eff. 10/01/2025
LABORER: SHAFT, RAISE, STOPE MINER
Scope and notes

(ZONE PAY: MERCURY, FORWARD AREAS & NTTR $5.00 FOOT NOTE: SAVINGS ACCOUNT OF $4.22 SHOULD BE ADDED TO THE BASE RATE)

$47.69$27.27$74.96LABO0872-010
eff. 10/01/2025
PAINTER: FLOORCOVERER, CARPET, LINOLEUM AND TILE GLAZIER
Scope and notes

(ZONE PAY- NNSS $5.00; NTTR $5.00)

$52.40$24.18$76.58PAIN0159-002
eff. 10/01/2025
PAINTER
Scope and notes

(ZONE PAY- NNSS $5.00; NTTR $5.00)

$51.79$24.18$75.97PAIN0159-002
eff. 10/01/2025
PAINTER, SPRAY AND PAPERHANGER SIGN
Scope and notes

(ZONE PAY- NNSS $5.00; NTTR $5.00)

$52.14$24.18$76.32PAIN0159-002
eff. 10/01/2025
PAINTER, TAPER, FLUSHER AND DETAILER
Scope and notes

(ZONE PAY- NNSS $5.00; NTTR $5.00)

$52.14$24.18$76.32PAIN0159-002
eff. 10/01/2025
PLASTERER
Scope and notes

(ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50)

$42.03$28.05$70.08PLAS0797-004
eff. 10/01/2025
CEMENT MASON
Scope and notes

(ZONE PAY ZONE A - LAS VEGAS - NO PAY ZONE ZONE B - MERCURY AND FORWARD AREAS-$5.00 ZONE C - NTTR-$5.50)

$43.27$29.66$72.93PLAS0797-004
eff. 10/01/2025
PIPEFITTER: INCLUDING INERT GAS WELDER
Scope and notes

(ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25)

$62.85$26.75$89.60PLUM0525-007
eff. 10/01/2025
PLUMBER: INCLUDLING LEAD BURNER
Scope and notes

(ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25)

$62.85$26.75$89.60PLUM0525-007
eff. 10/01/2025
REFRIGERATION MECHANIC
Scope and notes

(ZONE PAY: MERCURY $7.50; FORWARD AREAS $11.25; NTTR $11.25)

$62.85$26.75$89.60PLUM0525-007
eff. 10/01/2025
ROOFER (INCLUDING WATERPROOFING)$39.74$12.42$52.16ROOF0162-003
eff. 10/01/2025
SPRINKLER FITTER
Scope and notes

ZONE PAY ZONE A: LAS VEGAS - $0.00 ZONE B: NNSS - $4.50 ZONE C: NTTR - $4.50

$56.69$28.62$85.31SFNV0669-003
eff. 10/01/2025
SHEET METAL WORKER
Scope and notes

(ZONE PAY: NNSS $5.50; NTTR $5.50)

$66.73$30.01$96.74SHEE0088-003
eff. 10/01/2025
TRUCK DRIVER, GROUP 5 TIREMAN
Scope and notes

(ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES)

$44.26$28.37$72.63TEAM0631-007
eff. 10/01/2025
TRUCK DRIVER, GROUP 4 BOOTMAN, OFF-ROAD AND SPECIAL EQUIPMENT DRIVER
Scope and notes

(ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES)

$44.78$28.37$73.15TEAM0631-007
eff. 10/01/2025
TRUCK DRIVER, GROUP 3 EXTRA HEAVY DUTY DRIVER, FORKLIFT DRIVER (OVER 15 TONS)
Scope and notes

(ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES)

$44.06$28.37$72.43TEAM0631-007
eff. 10/01/2025
TRUCK DRIVER, GROUP 2 EQUIPMENT PARTS CLERK, FLEET OPERATIONS DISPATCHER, FORKLIFT DRIVER (UNDER 15 TONS), HEAVY DUTY DRIVER, WAREHOUSEMAN
Scope and notes

(ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES)

$43.86$28.37$72.23TEAM0631-007
eff. 10/01/2025
TRUCK DRIVER, GROUP 1 LIGHT DUTY DRIVER, LIGHT VEHICLE DISPATCHER, TRUCK GREASER
Scope and notes

(ZONE PAY ZONE 1: $2.00 1-20 MILES ZONE 2: $2.50 20-40 MILES ZONE 3: $3.50 40-60 MILES ZONE 4: $6.00 OVER 60 MILES)

$43.69$28.37$72.06TEAM0631-007
eff. 10/01/2025

Footnotes

Executive Order 13658
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

About this determination

Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.

Page built from modification 3 published 06/01/2026. We format and check the official text; the determination in your contract is what applies.