South Dakota prevailing wage rates: SD20260006
Building construction in Brown County.
SD20260006, modification 2, published 05/18/2026. Official source on SAM.gov
Verify against the official determination before bidding. These rates are formatted from the published SAM.gov wage determination. The determination in your contract documents is what applies.
What changed since modification 1
No base or fringe rates changed. The modification may have changed notes or other text.
Rates per hour
Total = base + fringe. Fringe may be paid to bona fide benefit plans, in cash, or both.
| Classification | Base | Fringe | Total | Rate ID |
|---|---|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR (DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $55.34 | $34.03 | $89.37 | ASBE0034-007 eff. 06/09/2025 |
| CARPENTER (DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $36.34 | $17.15 | $53.49 | CARP0587-001 eff. 06/01/2025 |
| ELECTRICIAN | $36.32 | $16.83 | $53.15 | ELEC0426-002 eff. 06/01/2025 |
ELEVATOR MECHANICScope and notesFOOTNOTES: A. EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR EMPLOYEES WITH LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY | $56.30 | $38.44 | $94.74 | ELEV0033-004 eff. 01/01/2025 |
POWER EQUIPMENT OPERATOR ((3) HYDRO CRANE; CRANE (ALL OTHER TYPES))Scope and notesLONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM TO THE TOP OF THE SHEAVE OR JIB SHEAVE. TOWER CRANE PREMIUM: FROM THE TOP OF THE TOWER CRANE FOUNDATION TO THE TOP OF THE TOWER CRANE APEX. IN THE CASE OF LUFFING CRANES, TO THE TOP OF GANTRY, PLUS BOOM LENGTH PER CLASSIFICATION: 250' TO 299' - $1.00 300' TO 349 - $1.50 350' TO 399' - $2.00 400' TO 449' - $2.50 450' AND OVER - $3.00 | $34.08 | $18.71 | $52.79 | ENGI0049-009 eff. 09/01/2024 |
POWER EQUIPMENT OPERATOR ((1) TOWER CRANE)Scope and notesLONG BOOM PAY: 151' TO 200' - $0.50 PER HOUR ADDITIONAL; 201' AND OVER - $0.60 PER HOUR. MEASUREMENT SHALL BE FROM BUTT PINS OF THE BOOM TO THE TOP OF THE SHEAVE OR JIB SHEAVE. TOWER CRANE PREMIUM: FROM THE TOP OF THE TOWER CRANE FOUNDATION TO THE TOP OF THE TOWER CRANE APEX. IN THE CASE OF LUFFING CRANES, TO THE TOP OF GANTRY, PLUS BOOM LENGTH PER CLASSIFICATION: 250' TO 299' - $1.00 300' TO 349 - $1.50 350' TO 399' - $2.00 400' TO 449' - $2.50 450' AND OVER - $3.00 | $34.38 | $18.71 | $53.09 | ENGI0049-009 eff. 09/01/2024 |
| IRONWORKER, STRUCTURAL | $30.80 | $15.48 | $46.28 | IRON0021-018 eff. 05/01/2024 |
| CEMENT MASON/CONCRETE FINISHER | $33.01 | $15.08 | $48.09 | PLAS0538-001 eff. 10/01/2024 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $30.93 | $17.22 | $48.15 | SHEE0010-022 eff. 06/01/2022 |
| ROOFER | $14.52 | $2.09 | $16.61 | SUSD2012-003 eff. 08/21/2014 |
| PLUMBER | $19.02 | $5.20 | $24.22 | SUSD2012-003 eff. 08/21/2014 |
| PAINTER: BRUSH, ROLLER, AND SPRAY | $19.22 | $0.00 | $19.22 | SUSD2012-003 eff. 08/21/2014 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $16.14 | $0.00 | $16.14 | SUSD2012-003 eff. 08/21/2014 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.34 | $0.00 | $19.34 | SUSD2012-003 eff. 08/21/2014 |
| LABORER: MASON TENDER - BRICK | $14.19 | $0.00 | $14.19 | SUSD2012-003 eff. 08/21/2014 |
| LABORER: COMMON OR GENERAL | $10.87 EO 13658 minimum $13.65 may apply | $0.00 | $10.87 | SUSD2012-003 eff. 08/21/2014 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $19.25 | $2.82 | $22.07 | SUSD2012-003 eff. 08/21/2014 |
| BRICKLAYER | $31.88 | $1.83 | $33.71 | SUSD2012-003 eff. 08/21/2014 |
Footnotes
- Executive Order 13658
- Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
About this determination
Welders receive the rate for the craft performing the work to which welding is incidental. Classifications not listed may be added after award through the conformance process (29 CFR 5.5(a)(1)(iii)). Executive Order minimum wages and paid sick leave may also apply; the official document has the full text.
Page built from modification 2 published 05/18/2026. We format and check the official text; the determination in your contract is what applies.